It is planned that the new building will have a total land area of 265,438+0,067 square meters and a total construction area of 95,000 square meters. It is estimated that the total investment of the project will be about 840 million yuan, and the designed book collection will be about 4 million volumes, with 6,654,38+065,438+00 seats and 2,520 information points, with an average readership of 65,438.
2. Guangzhou Opera House
Guangzhou Opera House covers an area of 42,000 square meters with a total construction area of 46,000 square meters. The main building consists of 1800-seat grand theater, 400-seat multi-function hall, 4,000 square meters lobby and lounge, underground parking and other auxiliary facilities. The total investment of the project exceeds 654.38 billion yuan. It will become the third largest opera house in China after the Beijing National Grand Theatre and the Shanghai Grand Theatre. 3. New Guangdong Provincial Museum
The provincial Boxin Museum, with a total investment of 900 million yuan, is located in the Central Culture and Art Square in the new urban area of Zhujiang New Town, Guangzhou, with a total area of 4 1027 square meters and a total construction area of 63 128 square meters. It is planned to be completed in July 2007. There are nine design schemes from nine architectural design institutions (consortia) in seven countries at home and abroad. The planned new Guangdong Provincial Museum is located in Zhujiang New Town, echoing the Guangzhou Opera House.
4. Guangzhou Second Children's Palace
The provincial Boxin Museum, with a total investment of 900 million yuan, is located in the Central Culture and Art Square in the new urban area of Zhujiang New Town, Guangzhou, with a total area of 4 1027 square meters and a total construction area of 63 128 square meters. It is planned to be completed in July 2007. There are nine design schemes from nine architectural design institutions (consortia) in seven countries at home and abroad. The planned new Guangdong Provincial Museum is located in Zhujiang New Town, echoing the Guangzhou Opera House. 5. TV sightseeing tower
It covers an area of about 6.5438+0.79 million square meters with a total investment of about 65.438+0.58 billion yuan. The comprehensive facilities, mainly for sightseeing and compatible with radio and television transmission functions, will become an important landmark building in Guangzhou after completion.
6/7. Twin Towers (West Tower and East Tower)
Project Description: The construction land area of West Tower is 3 1 0,084.96 m2 (including urban green square area of 85310.49 m2), and the construction land area of East Tower is 26,204.79 m2 (including urban green square area of 8288.5 1 m2), involving the central square area of Pearl River New Town of 3227/kloc.