x/40+3x/240=6
6x+3x= 1440
9x= 1440
x= 160
3x=3× 160=480
Steel is needed to make part a.
160÷40=4(m? )
Steel is needed to make part B.
480÷240=2(m? )
It will take x days to lay this pipeline.
x/ 12+x/24= 1
2x+x=24
3x=24
x=8
The two engineering teams will need eight days to build the pipeline from both ends at the same time.
3. Let the purchase price of small schoolbags be X yuan, and the direct purchase price of large schoolbags be x+ 10 yuan.
30%x=20%(x+ 10)
0.3x=0.2(x+ 10)
0.3x=0.2x+2
0.3x-0.2x=2
0. 1x=2
x=20
x+ 10=20+ 10=30
The price of small schoolbags is 20 yuan, and the price of big schoolbags is 30 yuan directly.