(1) Production preparation Arrange the construction tasks and site preparation according to the established schedule. For example, on-site water supply pipeline insulation, mixer shed insulation, site leveling and temporary road setting, decoration engineering doors and windows closed insulation, etc. ?
(II) Resource preparation According to the formulated plan, organize the preparation of admixture materials, thermal insulation materials, construction instruments (thermometers) and labor protection articles for employees. ?
Extended data:
Before construction, according to the scale characteristics of the project and the environmental conditions of the construction site, a special winter construction plan is formulated. Determine the construction deployment and arrangement, construction scheme, construction methods, procedures, progress, safety technical measures for the supply and management of construction machinery and equipment, materials and corresponding management systems for key parts.
Before construction, according to the requirements of the construction plan, all construction personnel shall be educated and trained in winter safety, and safety technical measures shall be disclosed. The requirement is to grasp the main points and clarify the responsibilities.
Before winter comes, it is usually necessary to cover the construction operation surfaces such as formwork and steel bars with plastic film. For the processed steel bar, a wooden mat should be placed below to avoid the contact between the steel bar and frozen soil and clay, and to prevent the steel bar from rusting.
In case of rain and snow, the snow on the surface of the steel bar should be cleaned in time after snow, and the snow in the formwork (on the formwork) should also be cleaned up. However, if it is difficult to clean up sundries such as rain and snow, tools such as heaters, vacuum cleaners and gasoline blowtorches should be used for comprehensive cleaning.