Current location - Training Enrollment Network - Education and training - Year-end Personal Work Summary of Assembly Process Engineer 202 1
Year-end Personal Work Summary of Assembly Process Engineer 202 1
It is the end of the year again. It seems that you are having a headache for summing up your annual work. Look what I have prepared for you! The following is my personal work summary of assembly process engineer 202 1 year-end, which is for your reference only. Welcome to reading.

Year-end personal work summary of assembly process engineer 202 1 A technician is busy, and the process is very important to production. Technology plays a guiding and auxiliary role in production. The quality of process work directly affects the smooth progress of production, and at the same time largely determines the quality of kpi related indicators in the workshop, thus affecting the company's benefits. Therefore, the ability of workshop technical team often determines the quality and efficiency of workshop production.

As a member of the workshop technology group, I feel that my biggest problem now is lack of experience, inability to skillfully solve problems in production, confusion about many things, and failure to form a good system in many aspects of my work.

In terms of making process tables, we can skillfully make process tables, but individual processes are not optimal. When you see a brand, you can't clearly know its formula structure, technical requirements, production process conditions, testing items and related standards. This requires learning, accumulating and summarizing in the future work, quickly mastering relevant knowledge and information, and making the process accurately and quickly.

I'm not very familiar with the relevant interfaces and processes. When you encounter some specific problems, you often need to consult others. The working methods are not mature enough, and the communication with other positions is inexperienced. In this respect, we need to consult the "predecessors" with an open mind, grow rapidly in technology, master the process-related operations skillfully, and integrate into the post and team as soon as possible.

In exception handling, I can handle simple exceptions skillfully, but for some special exception handling, I am still inexperienced and the response speed is not fast enough. When there is an abnormality, we should respond quickly, take decisive measures, and contact manufacturing engineers, qe, color matching, pilot test and other related technicians in time to jointly deal with it. On the other hand, accumulate more experience, grow rapidly, and strive for early independence.

For the present work and future work, we need to learn more, think more, sum up more, communicate more with experienced technical and management personnel, feedback our study and work to our superiors in time, find out our own problems and deficiencies in time and improve them.

The growth and development of individuals depends on the team, and at the same time, their own efforts are very important. I feel good about my present job and status. Over the past six months, I have learned a lot and grown rapidly. I am very satisfied with my present environment. I am studying and working hard.

Year-end Personal Work Summary of Assembly Process Engineer 200212 Looking back on this period, I devoted myself to the study of theoretical knowledge and the improvement of practical ability with the vigor, perseverance and enterprising spirit of young people, and kept repeating the life track of "reading thousands of books, taking the road of Wan Li" and "practicing true knowledge". The annual professional and technical assessment has been qualified, and the work in the first half of this year is summarized as follows:

I. Ideological and political aspects

Create new achievements and create a new life with high morale and full enthusiasm. Can persist in carrying forward the main theme of "building a healthy atmosphere, stressing unity and seeking development", be conscientious, dedicated, pioneering and enterprising in all posts, and accomplish all tasks well.

Second, the business work

1, cost consulting work, the main content of cost consulting work is:

Compilation and review of investment estimation and project economic evaluation report; Prepare and review the construction project budget, analyze and control the project cost; Project cost services such as preparation and audit of project settlement and completion settlement (final accounts) report.

During my work in the cost consulting department, I started from the basics bit by bit and studied while working. I participated in, presided over or independently completed the compilation and review of the budget estimate, project budget, bill of quantities and cost analysis of the police officers' apartment building project, xx Avenue reconstruction project, xx county landfill project, xx county sewage treatment plant project, xx Institute of Technology science and technology experimental building project, xx farm residential community project and xx city commercial and residential complex project. In addition, he also participated in the cost audit and project settlement audit of xx community, xx county national grain reserve and xx city public security bureau police community.

Through these budget, settlement and audit work, I have mastered the use of budget software and the essentials of civil engineering budget flexibly, and have a certain understanding of water heating, electricity, warehousing and municipal administration.

2, bidding agency work:

He has organized and presided over the apartment building project of officers and men of the Fire Armed Police Detachment in X City, the reconstruction project of X Avenue, the sewage treatment plant project in X County, the science and technology experimental building project of X Vocational and Technical College, the clothing training building project of X Vocational and Technical College, the residential community project of X Farm, the commercial and residential complex project of X World Trade Tianjie, the residential community of X Public Security Bureau, the national grain reserve of X County, the teaching building of X College and X Square. Specializing in industrial architecture, civil architecture, warehousing, municipal infrastructure, highway traffic engineering, pipeline engineering, landscaping engineering, design, construction, supervision, service, equipment procurement and other aspects of design. These jobs have enabled me to master the operation skills of bidding work and all the knowledge of the whole process of bidding agency, such as data collection, sorting, sorting and filing. Because of my solid work, the bidding work I participated in was successfully completed and won unanimous affirmation and praise from all walks of life. Because of excellent work, solid business level and good communication, I have been the head of a bidding agency for a long time.

Third, professional study.

There is no end to learning. In line with the belief of "doing one thing, loving one thing, learning one thing and specializing in one thing", I have always insisted on learning professional technical knowledge and auxiliary knowledge. Self-study related knowledge of project cost, laws and regulations of bidding agency, government procurement knowledge and professional knowledge of project management, basically master all kinds of basic theoretical knowledge in the industry, and master the key points and nodes of work.

The development of modern society is changing with each passing day, and knowledge is updated very quickly. If you don't add new knowledge in time and continue to learn and communicate, you can't meet the needs of enterprise technology management and will be eliminated. To this end, take every opportunity to participate in various training courses and technical exchange activities. During my time as an assistant engineer, I participated in various special trainings organized by many relevant departments. He has participated in post training of construction contract manager, post training of bidding agent in X province, cost engineer training, cost engineer education, bidding agent training and post training of government procurement in X province, and obtained the qualification of contract manager, second-class cost engineer, bidding agent and government procurement in X province. Through various continuing education training courses, I have maintained a strong thirst for knowledge, and my professional and technical level has been continuously improved.

While learning professional technical knowledge, I also tried to explore and learn computer software and hardware knowledge, and successfully applied Microsoft office series office software and autocad series software to daily construction management. In the continuous study and practice, I strive to promote the paperless management of project management, use word to complete word processing, and print all kinds of record forms and text materials. Using Excel to store and analyze engineering information provides quantitative basis for engineering decision-making.

Through continuous learning, I gradually grew into a knowledge-based, communicative and enterprising talent, enhanced my sense of social responsibility and set a lofty goal.

Year-end Personal Work Summary of Assembly Process Engineer During the three years of 20021,personal work has made great progress and achieved the annual work target of 20021. 202 1 personal work is summarized as follows:

First, study hard and do well ideologically and politically.

My principle in dealing with people is "study hard, work hard, be honest and live a happy life". I am strict with myself, work hard, treat others sincerely, and match my words with my deeds. Law-abiding, modest and prudent, decent style, with good ideological quality and professional ethics. Actively demand progress, unity and friendship, courtesy and integrity. In the study of political theory, I participated in 10 group study and took notes carefully. I have been emphasizing that the straight line between two points is the shortest, there is no shortcut to success, and the shortcut is not to take detours. It seems that this is not the case now, because I still emphasize the word shortcut in my mind, and I will take a detour if I want to take a shortcut.

Second, tap the potential to increase efficiency and complete the work well.

1. As a regional process engineer, the construction of various systems cannot be delayed. Only a good and complete system can guide the smooth development of activities including safety, quality, management and production. During this year, I earnestly implemented the relevant system work arranged by the department leaders and the leaders in the operation area, and was responsible for the preparation of the quality system, safety system, existing and production management system documents of the bell-type furnace unit, self-inspection and self-inspection, and finally passed the audit smoothly without any unqualified items.

2. With the rapid increase of the speed of the temper mill, the productivity of the temper mill has also been greatly released, and the output of the temper mill has been limited for many times due to insufficient material preparation. In view of the bottleneck problem of bell-type furnace, the factory leaders organized production coordination meetings twice and decided to carry out team competition activities in bell-type furnace units. The main purpose is to improve the enthusiasm of employees, break through the limitation of production organization ability and maximize production capacity. After receiving the notice of the activity, the specific plan of the competition activity was quickly formulated, and the measures to effectively improve the capacity of the cover and retreat were taken to ensure the low failure rate of the equipment and seize the loading and unloading time. The labor competition activity in April and May was successfully completed, and finally the capacity of the cover and retreat exceeded 62,000 tons, reaching the best level in history.

3. The production life of annealing unit for cold-rolled hood is short. With the development of production, safety problems, quality problems and management problems are prominent, and there are still some problems of missing pipes and leaking pipes. According to the results of self-inspection, timely prepare and update management documents, sum up accident experience, and train crew 15 times. The accident rate of operation post is obviously reduced, the on-site production management is orderly, and the phenomenon of pipe shortage and leakage is basically eliminated.

4. To a great extent, the work of hood evacuation unit can be regarded as safe work. Only when the safety work is done well can the basic work of hood retreat be considered done well. Safety work is embodied in three standards. This year, the revision of "Operation and Technical Specification for Bell Furnace" was completed, and 8 documents were merged. Three safety standards were revised, including 54 safety operation standards and 12 regulations, three regional habitual illegal items were added, the safety operation rules for hydraulic trolleys were added, and the documents such as "Operation Rules for Overhead Crane and Finger Crane of Furnace Covering Unit" were added. The closed management of the cover-removing unit was completed, and relevant management measures were formulated, which promoted the safety work in the cover-removing area to a higher level.

Third, the lack of analysis, looking forward to 2022

1, the lack of relevant professional knowledge has become a serious obstacle to technological breakthrough.

As a process engineer, in addition to implementing the process system, there are many management responsibilities, so the process engineer is required to have a deep grasp of the normal process, and must also have a certain understanding of mechanical, electrical, hydraulic and other related knowledge. Learning relevant professional knowledge in the next year should be included in the work focus.

2. The indigestion of technical accessories in this unit has become the main bottleneck of this work.

This year, many problems have not been fundamentally solved, and the ultimate reason lies in the lack of understanding of equipment principles and incomplete digestion of technical data. For example, at present, the calorific value problem that restricts the improvement of the oil-returning ability of the hood has not been solved for a long time. They completely pinned their hopes on the equipment transformation of the gas station, and did not start with their own equipment to find a solution to the problem. The specific performance is that individual personnel dare not change the equipment parameters easily, fearing an accident and cannot recover. I'm afraid because I don't understand and master it, which reflects a deeper problem. Do not understand the principle of equipment, technical data can not be digested. Therefore, in the next year's work, we will also focus on equipment work, so as to have a thorough understanding of equipment, be handy in operation and do whatever we want.

3. The style of procrastination in work has become the primary factor affecting the improvement of professional level.

Attitude determines everything, and the attitude towards work determines the efficiency and quality of work. In this year, I can obviously feel my ideological slack, a lot of work has been done, and the quality of completion is not high. There is always the idea of putting off what should be done today until tomorrow. The attitude of leaving everything to tomorrow is procrastination, which not only hinders progress, but also deepens work pressure. Xx said, "Grasping today is equal to having twice as much as tomorrow." Therefore, to improve the professional level, we must first change our concepts, turn negative into positive, and turn passion into motivation.