2. For new construction and expansion projects, the fire control institution of the public security organ shall provide a copy of the "Review Opinion on Fire Protection Design of Building Projects" and the "Certificate of Examination of Design Documents of Shanghai Construction Projects". The renovation project included in the acceptance scope shall provide a copy of the fire protection design review opinions of the renovation project;
3, the project completion acceptance report;
The construction unit shall organize the design, construction, supervision and other units to carry out the completion of fire control acceptance, and fill in the "Project Completion Acceptance Report (Fire Control)" and report it to the fire control institution of the public security organ for acceptance.
4. Completion drawing of fire control facilities;
For the construction project that has obtained the planning permission of the construction project, the completion drawing of fire control facilities shall be reported to the urban construction archives management department for the record in accordance with the relevant provisions, and the completion drawing may not be provided when the fire control acceptance is declared. For the reconstruction and construction projects where the original fire control facilities have not been systematically adjusted, the as-built drawings may not be provided when the fire control acceptance is declared.
5. List of fire protection products:
Fill in the contents including fire protection products and building components, building materials and decoration materials with fire protection performance requirements. The supervision unit shall affix the official seal of the unit and the signature of the supervision engineer, and the construction unit shall affix the official seal of the unit and the signature or seal of the legal representative.
Specific fire-fighting products and building components, building materials and decoration materials with fire-fighting performance requirements meet national regulations, and the market access certification materials and product qualification certificates are bound into volumes and kept at the fire-fighting acceptance site for future reference.
Extended data:
According to "People's Republic of China (PRC) Fire Protection Law", "Regulations on Quality Management of Construction Projects" and "Regulations on Supervision and Management of Construction Projects", the quality responsibilities of fire protection design and construction, fire protection design review and application for fire protection acceptance, fire protection design and completion acceptance filing are clearly defined.
In any of the following circumstances, the construction unit shall apply to the fire control institution of the public security organ for fire control design audit, and apply to the fire control institution of the public security organ for fire control acceptance after the completion of the construction project:
First, crowded places
(a) stadiums, gymnasiums, public exhibition halls and museum exhibition halls with a total construction area of more than 20,000 square meters;
(2) Civil airport terminals, passenger station waiting rooms and passenger station waiting halls with a total construction area of more than 65438+500,000 ㎡;
(3) Hotels, restaurants, shopping malls and markets with a total construction area of 1 1,000 ㎡;
(4) theaters, public library reading rooms, business indoor fitness and leisure places, hospital outpatient buildings, teaching buildings, university library canteens, labor-intensive enterprise production and processing workshops, temples and churches with a total construction area of more than 2,500 square meters;
(5) Children's rooms in nurseries and kindergartens with a total construction area of 1000㎡, indoor places for children's activities such as children's play halls, ward buildings in nursing homes, welfare homes, hospitals and sanatoriums, teaching buildings, libraries and canteens in primary and secondary schools, dormitories in schools and dormitories for workers in labor-intensive enterprises;
(6) Song and dance halls, video halls, projection halls, karaoke halls, nightclubs, amusement halls, saunas, Internet cafes, bars, restaurants, teahouses and cafes with entertainment functions with a total construction area of over 500 square meters.
Second, special construction projects
(1) Office buildings, power dispatching buildings, telecommunication buildings, postal buildings, disaster prevention command and dispatching buildings, radio and television buildings and archives buildings of state organs;
(2) Other public buildings with a single building area exceeding 40,000 square meters or a building height exceeding 50m;
(4) Urban rail transit, tunnel engineering, large-scale power generation and distribution engineering;
(5) Factories, warehouses, special stations and docks for producing, storing and loading and unloading inflammable and explosive dangerous goods, filling stations, supply stations and pressure regulating stations for inflammable and explosive gases and liquids.
References:
Baidu encyclopedia-fire inspection and acceptance