(1)M 1 first, then M2.
(2)M2 can stop independently and press the stop button SB22.
(3)M 1 and M2 stop at the same time, and press the stop button of SB 12.
(4) There are overload protection (relay FR 1, FR2) and short-circuit protection (fuse FU 1, FU2).