(2) Team B can't do it alone,
Team A needs 3.5 * 60 = 265438+ 10,000 in 60 days.
Team A and Team B cooperate in the whole process, and complete1/60+1/90 = 5/180 every day.
A * * * need 1÷(5/ 180)=36 days.
The project cost to be paid is 3.5 * 36+2 * 36 = 1.98 million.
So Team A and Team B cooperate to save money.