_ Do you want to kill the Governor? 2 (water interval K=2), the corresponding construction logarithm is 3 21,n = 3 21= 6. The construction period is (M N- 1)*K=22.
_ 砦?跞蟛鍪す? 6, the sorting is 6 anyway, so the sorting problem is not considered. Therefore, the construction period T = (6+6+6+6)+6+4+2 = 42 days.
_ hey?
_ I —— the duration of the last construction process (or operation team) in a construction section. Its size is related to the amount of labor, machinery and materials invested, which determines the speed and rhythm of construction. There are usually two methods to determine, one is based on the construction period, and the other is based on the existing available resources (labor, number of mechanical shifts, materials).
_ Ij —— The time interval between two adjacent construction teams (groups) entering the first construction section successively for flowing water construction is called flowing water section. Its quantity depends on the number of running water participating in the construction process. If the construction process is n, the total number of water sections is (n- 1).