A = 4.2+0.6 = 4.8 per day;
(2) Remaining days =1755-45 =1710m.
Days Less Used =1710 ÷ (4.8+4.2)-1710 ÷ (4.8+4.2+0.2+0.3) =190.
(1) Assuming that B repairs X meters every day, there are:
5×(x+x+0.6)= 45;
10x = 42;
x = 4.2
So B repairs 4.2 meters every day, and A repairs 4.8 meters every day;
(2) If the number of days used less is X days, there are:
( 1755-45)÷(4.2+4.8)-x =( 1755-45)÷(4.2+4.8+0.2+0.3);
x = 10;
So it took 10 days less.