Therefore, the interval days from February 19 to February 2008 +0 1.02. 19 are:
365*3+ 1 = 1096
Add the date of February 19, 2008, and it is 1097 days.
Then 97 days before 2011.02.19 is the required date.
2011.02.19 ~ 2010.12.31every 50 days.
2010.12.31~ 2010.1day.
2010.11.30 ~ 2010.1.1416 days.
1097-(50+3 1+ 16)= 1000
Therefore, the1000th day from February 19, 2008 is 2010.1.14.