1.4x*0.8=x+300
1. 12x=x+300
0. 12x=300
x=2500
The second question, the original planned time is X.
20x-8=22x-22
2x= 14
x=7
The third question assumes that Otsuichi's hourly workload is X, then A's hourly workload is (x+2).
(x+2)*5+(2x+2)*4=200
x= 14