First of all, to understand the market is mainly to understand the decoration materials and decoration companies and the necessary common sense.
Second: design stage, decoration budget planning, material selection.
Third: construction preparation, demolition works and material ordering.
Fourth: new wall, hydropower transformation, heating transformation, material ordering.
Fifth: bricklayer paving, kitchen and bathroom waterproofing, carpentry, measuring kitchen cabinets (second interview), measuring doors and windows.
Sixth: level the ground, lay bricks on the ground, install plastic steel windows, install security doors, and oil workers enter the site.
Seventh: Brush gypsum on the top of the wall for leveling, scrape putty on the top of the wall, and install aluminum gusset ceiling.
Eighth: Brush latex paint on the top surface of the wall, install interior doors, lay wallpaper, install lamps, install sanitary ware, install floors and install.
Installation of kitchen cabinets and curtains
Ninth: organize, clean, enter the furniture and purify the air.