Summary of air pollution prevention and control work 1 Summary of air pollution prevention and control work of Fangshan Co., Ltd. of Beijing Environmental Sanitation Group in March In order to strengthen the air pollution prevention and control work in our district and improve the ambient air quality, combined with the actual situation in our district, the air pollution prevention and control work of our company is now reported as follows:
I. Situation analysis
According to the data analysis of the same period over the years, in March, the city was in the transition period from winter to spring, and the concentration of fine particles and inhalable particles in the air was in the high incidence period of the year, with high temperature, less precipitation, frequent inversion and steady weather and heavy air pollution. The probability is high. Combined with the actual work of our company, the work plan of air pollution prevention and control of Fangshan Co., Ltd. of Beijing Environmental Sanitation Group was formulated.
Second, the main work
(1) Improve organizational leadership. Establish leading groups for air pollution prevention and control at all levels. Strengthen the supervision of the implementation of the work, according to the organizational structure, clear division of responsibilities, so as to carry out their duties and responsibilities to people.
(2) Strengthen operating standards. From March 20th to March 30th, 2003/kloc-0, each operation center adopted the process of "sucking, sweeping, flushing and collecting" and took corresponding cleaning measures according to the road grade, drawing lessons from the road cleaning experience during the 20xx APEC Leaders' Meeting.
First, for the first-class road cleaning, mechanical cleaning operation shall be carried out at least 1 time at night, mechanical cleaning operation shall be carried out at least twice during the day, mechanical scouring and washing shall be carried out at least 1 time every day, and spraying dust removal operation shall be completed at least 1 time every day. Second-level cleaning and cleaning roads shall be carried out with no less than 1 time at night, no less than 1 time during the day and no less than 3 times per week. Third-level cleaning and cleaning roads, complete cleaning operations before 6: 00 every day, conduct manual patrol cleaning during the day, and conduct mechanical cleaning operations as appropriate.
Second, when cleaning, people should sweep along the wind direction to reduce the height of broom and reduce the secondary dust pollution caused by manual cleaning.
Third, within 24 hours after the dusty weather has passed, dust removal operations should be carried out at road intersections and when vehicles turn around under bridges, overpasses, underground passages and fences.
The fourth is to strengthen the business training of employees and enhance their ability to deal with emergencies.
(3) According to the color warning of air quality, the corresponding emergency plan was formulated, and emergency teams were set up in each operation center, equipped with emergency vehicles and equipment to ensure the rapid handling of emergencies.
(4) Improve the inspection frequency of the business inspection team and supervise the implementation of dust suppression in each operation center.
Third, complete the workload.
As of March 3rd1day, * * * has dispatched 7,824 personnel and 260 vehicles/Kloc-0, with a mileage of 47,406 kilometers and a working mileage of 35,697 kilometers, using 56 tons of tap water10, 840 tons of reclaimed water and 495 self-inspections.
In the future work, our company will further innovate ideas, forge ahead, and do a good job in air pollution prevention and control.
First, conscientiously implement the spirit of the Clean Air Action Plan for Fangshan District in 20xx-20xx and the Emergency Plan for Heavy Air Pollution in Fangshan District, and do relevant work according to the division of responsibilities;
Second, do a good job in cleaning and cleaning the operating roads within the jurisdiction;
The third is to strengthen supervision and inspection to promote the improvement of business level. In order to reduce road dust load and improve road cleanliness, make the greatest contribution.
Summary of air pollution prevention and control In 2 20xx, according to the requirements of the county government, the park aimed at strengthening environmental protection and preventing air pollution, and concentrated its efforts on solving outstanding dust pollution problems and improving air quality in the park through solid and effective work. The prevention and control of air pollution is summarized as follows:
First, improve the system and implement responsibilities.
The objectives and tasks of air pollution prevention and control were issued step by step, and the target responsibility letters were signed with four key enterprises in the park. It has formed a long-term mechanism of grasping one level at a time, taking one level at a time, taking responsibility at different levels and consolidating at different levels.
Second, increase publicity and raise awareness.
Vigorously publicize air pollution prevention and control activities, distribute more than 80 publicity materials, cultivate public awareness of environmental protection, advocate green travel and low-carbon life, fully mobilize the enthusiasm of the masses to participate in air pollution prevention and control, and form a social atmosphere that is proud of environmental protection and ashamed of environmental pollution.
Third, strengthen supervision and pay close attention to strict management.
Carry out special rectification work focusing on dust control, soot pollution prevention and control, incineration pollution and other issues, and urge its responsible subjects to implement pollution prevention and control responsibilities to avoid environmental impact.
First, strengthen the prevention and control of dust pollution on construction sites. In strict accordance with the work requirements of dust control, the park will strengthen the sanitary improvement of hardened road interfaces and the supervision of construction sites, strengthen the road improvement around enterprises, and strengthen dust control in its jurisdiction.
The second is to strengthen the control of dust pollution during the transportation of muck. Vehicles transporting muck must be loaded as required to prevent spillage along the way. Embargo on some road sections and standardize the management of garbage dumps. Vehicles entering and leaving the dump should be washed in strict accordance with the requirements.
The third is to strengthen the prevention and control of incineration pollution such as solid waste and domestic garbage, strengthen daily inspections, and timely dispose of incineration behavior.
The fourth is to intensify inspections and grasp the latest trends of air pollution. Take a combination of regular and irregular ways to check the exhaust emissions of enterprises in the park, grasp the latest trends, and timely feedback the problems found to relevant law enforcement departments.
IV. Next Work Plan
Although some achievements have been made in air pollution prevention and control, there is still a long way to go.
First, the economic foundation of the park is relatively weak, and it is difficult to invest in environmental protection-related funds;
Second, enterprises' awareness of adhering to environmental protection priority and consciously implementing national environmental protection laws and regulations needs to be improved.
In the future work, the park will further explore new ideas, forge ahead and do a good job in air pollution prevention and control.
First, do a good job in the "three simultaneities" supervision of environmental protection for new construction, renovation and expansion projects in the park;
Second, strictly implement the system of "one post and two responsibilities" for environmental protection work;
Third, do a good job in energy conservation and emission reduction of enterprises in the park, and improve the sewage supervision files.
Summary of Prevention and Control of Air Pollution 3 Since the beginning of this year, according to the relevant requirements of the Three-year Action Plan for Comprehensive Improvement of Ecological Environment in the City and the Action Plan for Prevention and Control of Air Pollution in XX District, all towns and villages have been focusing on the strategies of "improving ecological environment" and "ecological civilization demonstration town", taking "clean air" as the starting point, vigorously promoting various tasks and comprehensively improving the quality of atmospheric environment.
I. Complete the work in 20xx years
1, take measures simultaneously to speed up coal dust control.
Coal dust is one of the strongest pollution problems reflected by residents in our region in recent years, and it is also the primary task of our town to carry out "clean air action" and promote air pollution prevention and control. This year, our town shut down and dismantled seven coal-fired boilers, and continued to work together to curb coal dust pollution through facilities construction, law enforcement and supervision.
2. Slowly but surely, promote boiler elimination and desulfurization and denitrification projects.
Coal-fired oil-fired boilers and flue gas are the main sources of sulfur dioxide and nitrogen oxides in the atmosphere. The first is to promote the construction of a "no-burn zone". On the basis of the cumulative elimination of five coal-fired and oil-fired boilers in the previous three years, we will continue to explore the basic status of capacity expansion and central heating in the no-burn zone and promote the coverage of natural gas pipelines.
3. Give prominence to key points and make every effort to upgrade the industrial structure.
"Small and scattered" chemical industry, scrap metal and other industries are important sources of air pollution, and waste gas disturbs people from time to time, so the promotion of key industries has always been the focus of air pollution prevention and control. Carry out rectification and upgrading of gas-related industries. At present, the improvement has been basically completed. Three enterprises, Demao Plastics, Rongchang New Materials and Ren Shang Building Materials, passed the environmental protection acceptance, and a number of enterprises, such as Xinlong Rice Industry, implemented 24-hour video supervision, effectively preventing illegal activities such as excessive discharge.
4, standardize management, efforts to curb the construction site and road dust.
Building dust and road dust are important sources of dust and PM2.5 particles in the air, and are also the main targets of air pollution prevention and control.
The first is to comprehensively rectify the XX domain.
The second is to formulate an emergency action plan for dust control of XX construction project and take corresponding emergency measures according to the early warning level of heavy air pollution. According to the implementation plan of the special action for dust pollution control at construction sites in Yu 'an District, special inspection and centralized rectification of dust will be carried out. At the same time, strengthen daily dynamic supervision and conduct monthly supervision and spot checks on the implementation of dust control measures for all projects under construction.
Third, the system of "three decisions, three reports and one meeting" should be implemented in road cleaning, and investment should be increased to purchase more sanitation equipment such as machine sweepers, popularize the mode of "one broom" and "day sweeping and night washing", increase the number of machine sweeps and road sprinkling, and reduce road dust.
Second, the next work plan
1, grasp the key points and speed up the implementation progress of comprehensive coal dust control.
Accelerate the construction progress of XX natural gas to ensure that the main gas-related enterprises in the township can use natural gas by the end of 2020; Promote some enterprises to increase the punishment for failing to achieve the rectification progress within the specified time, and ensure the smooth completion of the task of changing coal to gas in the town.
2. Focus on the long-term and improve the business environment.
First, strive for the indicators of central heating in cities and districts and strive for the implementation of central heating in the whole town;
The second is to speed up the laying of natural gas pipelines and strive to achieve the goal of natural gas heating as soon as possible in the whole town;
The third is to improve the business environment, strictly control water-related and gas-related enterprises, improve the occupancy standards, and prevent problems before they happen;
Fourth, cooperate with the regional atmospheric office to take emergency measures in time to ensure that the work restriction and emission reduction are implemented.