Summary of the work of municipal public utilities bureau in the first half of the year
Summary of the work of municipal public utilities bureau in the first half of the year

In the first half of 20 14, under the correct leadership of the municipal party committee and the municipal government, guided by the spirit of the Third Plenary Session of the 18th CPC Central Committee, with the theme of ensuring the safe operation of the city, the residents' living and working in peace and contentment, and social harmony and stability, the Municipal Public Utilities Bureau further enhanced the carrying capacity of the city, improved the people's livable happiness index, and successfully completed various tasks, laying a solid foundation for the successful completion of the annual work objectives.

I. Work Completion in the First Half of the Year

(1) Municipal public works progressed steadily.

In 20 14 years, 2 municipal public works projects were built, including 3 continued projects and 8 new projects. At present, three projects have been completed, and the carrying capacity of the city has been further improved.

1. Water supply project construction: speed up the construction of Nibuwan Reclaimed Water Plant and Licunhe Reclaimed Water Plant with a daily processing capacity of 20,000 cubic meters. At present, the preparatory work has been completed, and the next step will be to conduct public bidding and start construction this year.

2. Heating project construction: It is planned to add 5 million square meters of heating area, and 4.3 million square meters have been started, accounting for 86% of the annual plan, of which 2.7 million square meters have been completed, accounting for 54% of the annual plan.

3. Gas supply project construction: 40 kilometers of natural gas medium and low pressure pipeline project was completed, and 28,000 users were developed, accounting for 57% and 54% of the annual plan respectively. 90.2 kilometers of transformation of gray cast iron pipe was completed, 3 natural gas automobile filling stations were built, and 2 were under construction.

4. Drainage project construction: complete the drainage network project of three districts in the city and the approval of environmental assessment, and complete the drainage network construction of other districts and cities, totaling112.5 km; Complete the preliminary work of environmental assessment and energy rating for the expansion projects of Licunhe and Loushanhe sewage treatment plants; Start the task of upgrading the sewage treatment plants in Maidao and Shazikou.

5. Construction of sanitation project: new public toilets 16, 29 started, and more than 50 public toilet facilities 150 were renovated.

(2) The level of industry supervision has been continuously strengthened.

1. Water supply industry. Implement a three-year improvement plan for drinking water quality. At present, most water plants in our city have 10 daily index detection ability, and the turbidity, PH and residual chlorine of the factory water are basically monitored online; Complete the grade evaluation of testing centers of six water supply enterprises, including Chengyang, Laoshan and Huangdao; In the first half of the year, the comprehensive qualified rate of water quality in our city remained at 100%.

2. Natural gas industry. Carry out investigation on the revision of Qingdao Gas Management Regulations, draft regulatory documents such as Qingdao Gas Industry Management Measures for Major Hazard Sources and Qingdao Residents' Gas Facilities Safety Management Regulations, improve the industry regulations and policies system, and promote the development of industry safety norms. Complete the push? Gasification city? Construction guidance, actively coordinate upstream enterprises to implement gas supply, and sign a strategic cooperation framework agreement on natural gas supply with Sinopec to vigorously promote it? Gasification city? Construction engineering.

3. Heating industry. Complete the "Qingdao Heating Regulations" (revised draft) and "Assessment Standards for Heating Enterprises" (first draft), and increase the proportion of clean energy assessment; Complete the third phase transformation plan of online monitoring system, and connect all heat sources and heat exchange stations not included in the system in the third district of the city to the online monitoring platform. Standardize the acceptance and funding process of metering devices. At present, the bidding for 10 batch of heat metering devices has been started, and 4 batches of bidding have been completed. Completed the reconstruction planning of the old heating pipe network in the third district of the city 15km, and completed the preliminary work such as design and bidding for some projects.

4. Drainage industry. Actively promote drainage and flood control, and complete the compilation of the comprehensive planning outline for urban drainage (rainwater) flood control; In-depth promotion of hidden dangers investigation and management activities, more than 950 inspection sites in the whole industry, composed of 45 1 inspection team, found 409 general hidden dangers, all of which have been rectified or implemented.

5. Sanitation industry. Strengthen the management of kitchen waste collection and transportation. At present, * * * 1884 units have signed a collection and transportation agreement for kitchen waste, and the collection amount reaches 7 1.4 tons/day. Intensify mechanized cleaning and implement urban road cleaning? High pressure flushing? Mechanized cleaning? Sprinkle water to reduce dust? Integrated operation mode, the mechanized cleaning rate of urban main roads reaches 100%, and the secondary roads reach 75%; The area of mechanized cleaning, watering and high-pressure flushing of urban main and secondary roads has reached 19 18 10000 square meters.

(3) The construction of ecological civilization has become more prominent.

1. A major breakthrough was made in the utilization of clean energy. Complete the "Special Plan for Clean Energy Heating" and make it clear through expert review. Four modernizations, three developments, two substitutions and one establishment? Work ideas, comprehensively promote clean energy heating work.

First, execution? Four modernizations? . Transform the original flue gas emission system of coal-fired boiler to realize clean emission; For qualified boilers, execute? Coal to gas? Or clean coal combustion transformation, non-energy-saving building wall insulation transformation, reduce energy consumption; Implement heat metering transformation to encourage users to save energy.

The second is promotion? Third, development? . Vigorously develop and utilize renewable energy sources such as sea water source, sewage source, soil source, solar energy and air source; Actively promote the development and utilization of waste heat heating in industrial production through mobile energy storage and heat pump technology; Explore and try to develop and utilize low-grade heat energy through large temperature difference operation mode.

The third is implementation? Two substitutions? . For qualified unit users, adopt distributed energy technology of combined cooling and heating or combined cooling and heating technology to replace central heating; Clean energy heating mode replaces central heating in newly-built houses.

The fourth is realization? A trap? . Comprehensive utilization of a variety of clean energy technologies can supplement and replace the existing heating system, meet the differentiated needs of different users for cold, heat and electricity, and finally establish a smart energy network, improve system energy efficiency, reduce coal consumption and reduce air pollution.

2. The utilization rate of reclaimed water has been continuously improved. Actively improve the comprehensive utilization level of reclaimed water, and constantly increase the amount of reclaimed water used for greening and river landscape. At present, 50,000 cubic meters of reclaimed water has been used. The construction of reclaimed water source heat pump has developed rapidly. Six renewable water source heat pump projects are planned to be built in the urban area this year.

3. Sludge disposal is constantly standardized. Strengthen the supervision of the whole process of sludge production, transportation and disposal, actively promote and strengthen the construction and supervision of sludge disposal projects such as Xiaojianxi and Zhonghengneng, and actively prepare for sludge bidding and other related work to ensure the safety and effectiveness of sludge disposal. At present, Xiaojianxi municipal sludge comprehensive treatment project has completed equipment installation; The daily average sludge treatment capacity of Zhonghengneng and Lvliyuan sludge emergency disposal projects reached 350 tons/day, which effectively relieved the pressure of sludge disposal in our city.

4. The classified collection of domestic waste is progressing smoothly. According to the actual situation of our city, put forward? Dry and wet classification? Focus, guide other regional focus except Shinan District? Restaurant garbage, unit canteen garbage, family kitchen garbage, farmer's market garbage, waste food grease? Wet garbage should be collected and transported separately. Construction of the city's renewable resources recovery system, toxic harmful waste classification treatment system, large-scale (decoration) garbage classification collection and transportation system? Big three? The disposal system realizes the classified collection, transportation and resource treatment of recyclable materials such as paper, scrap metal, toxic and harmful waste and large-scale (decorative) garbage of residents.

(4) A powerful guarantee for the smooth operation of the city.

1. The responsibility system for production safety has been further improved. Signed 20 14 safety production target responsibility letter and safety production commitment letter with relevant units and enterprises, formulated 20 14 emergency drill plan, conducted 7 emergency drills, further improved the expert database and emergency repair resource database, and further improved the emergency handling capacity. The members of the bureau's safety production Committee were adjusted, and a safety production management system in which the top leader is in charge of safety and the leader is in charge of directly supervising the industry was implemented. Do a good job in digital urban management information collection, ranking first in the city's digital performance appraisal.

2. Further implement safety measures. Prepare five special security plans and emergency plans for the World Expo, such as water supply and gas supply, and establish a 10 minute emergency security circle; During the APEC meeting, six special safeguard schemes, including environmental sanitation, water supply, drainage, gas supply, heat supply and water quality monitoring, were formulated, and 24-hour online monitoring was implemented for gas supply and water supply pipelines to ensure the safe operation and stable and high-quality supply of pipeline facilities. Be rated as? 2065438+2004 Qingdao advanced organization support unit for large-scale activities? .

3. Actively carry out special rectification actions. Actively carry out special rectification actions. In the first half of the year, we organized the investigation and rectification of hidden dangers in municipal public pipe networks, and carried out a major inspection of municipal public facilities and pipe networks. * * * More than 5000 kilometers of pipelines were investigated, and 7 10 hidden dangers were rectified. Five special industrial safety rectification actions, such as water quality safety, were carried out, and more than 700 units were inspected, and more than 200 hidden dangers were rectified at151.

Second, the next step plan

In the second half of the year, under the correct leadership of the Municipal Party Committee and the Municipal Government, the Municipal Public Utilities Bureau will continue to emancipate the mind, renew ideas, gather together, overcome difficulties, and make positive contributions to building a livable and happy city.

(A) to further accelerate the project construction.

1. Actively promote Tangshan Road Natural Gas Transmission and Distribution Support Base Project, Datang Qingdao Natural Gas Cogeneration Project and Jiaozhou Bay Submarine Natural Gas Pipeline Project, and complete the annual target of building and renovating 90 kilometers of gas pipelines, starting the construction of natural gas vehicle filling stations 10, and adding 70,000 pipeline gas users. At the same time, actively promote natural gas in large public buildings? Triple supply? Pilot, greatly improve the utilization rate of natural gas primary energy.

2. Intensify the renovation of the drainage facilities of the buildings and hospitals, and complete the renovation target of the drainage facilities of 100 buildings and hospitals throughout the year; Continue to promote the expansion project of Licunhe and Loushanhe sewage treatment plants, promote the upgrading project of Maidao and Shazikou sewage treatment plants, and ensure that construction will start before the end of the year. For Lingshanwei and Jiaonan sewage treatment plants that have not yet started upgrading, start the construction task as soon as possible to ensure that all sewage treatment plants reach the first-class A emission standard before 20 15.

3. Make every effort to speed up the construction, reconstruction and expansion of heat sources and the construction of heat exchange stations, and fully realize the realistic goal of adding 5 million square meters of central heating area in the city. Promote the extension of heating facilities to rural areas. Complete the heating pipe network? Steam turns into water? Transform the aging pipe network 15km, improve the energy utilization efficiency and ensure the safe operation of heating.

4. Accelerate the planning and construction of domestic waste treatment facilities in the city, coordinate and guide jimo city and pingdu city to complete the bidding for incineration power generation projects and carry out the preliminary work of the project, and promote the preliminary work of the second phase of Xiaojianxi Incineration Power Plant.

(B) efforts to strengthen industry supervision

First, do a good job in industry supervision, improve the supervision and assessment methods of urban water supply industry, enrich the content of water quality publicity, and improve the water quality bulletin system; To study and formulate detailed rules for the supervision and assessment of the drainage industry; Further improve the water quality online monitoring system, water quality early warning, emergency disposal and dispatching system; Promote the transformation of water supply pipe network and the construction of water quality monitoring laboratory and sludge disposal project.

Second, continue to do well? Star construction site? Architecture and? A big move to improve 100 service details? Activities, and constantly improve the level of supervision. In strict accordance with the selection conditions of star-rated construction sites, strengthen the grid supervision of engineering construction, and implement seamless and whole-process supervision of all kinds of projects to ensure that every project under construction can produce fine products and create first-class projects, and create municipal public quality projects.

The third is to implement departmental supervision responsibility, industry supervision responsibility, territorial supervision responsibility and enterprise safety production main responsibility, and improve the overall safety management level of the industry through special safety rectification, hidden danger investigation and management, safety education and training, and the establishment of safety production standardization enterprises. Do a good job in emergency, flood control, security and major activities, scientific research and technology promotion, occupational safety and health, energy conservation and emission reduction, and digital city management.

Fourth, continuously improve the efficiency of examination and approval services and further improve the economic development environment; Do a good job in law enforcement supervision and coordination, and continue to standardize the three-step punishment and enterprise-related inspection; Do a good job in the investigation, formulation and filing of laws and regulations, and do a good job in the management of law enforcement certificates, the transfer of law enforcement cases and the review of contracts.

(3) Further accelerate the promotion of clean energy projects.

In the past three years, our city will implement 52 clean energy heating projects, giving priority to development? One valley and two districts? , Qianhai Line and other key areas, after the construction of these projects, it is estimated that the energy supply capacity of clean energy will be 23.23 million square meters, and the raw coal used for production will be reduced by 720,000 tons every year, and sulfur dioxide, nitrogen oxides, nitrogen oxides and soot will be reduced by 1.436 tons, 1.654 tons, 38 tons and 359 tons respectively, which will play a positive demonstration role in the construction of clean energy heating.

1. Build the newly-built area of Blue Silicon Valley into a clean energy use area and start the Hongdao Economic Zone? There is no coalification construction in the demonstration area, and clean energy and renewable energy heating are fully implemented.

Second, six areas including Huangdao International Economic Cooperation Zone (including Sino-German Ecological Park), Phoenix Island Tourism Resort, Tangdaowan CBD Area, Central Cultural District, Langyatai Tourism Resort and the periphery of University Town were designated as the first batch? Clean energy heating pilot area? .

The third is to carry out a variety of renewable energy pilots. It is planned to pilot the combined heating of sea water source, air source and mobile heat storage vehicle in Badaguan and Taipingjiao areas, and build sewage source heat pumps in Jimo, Chengyang, Laixi and Licun estuaries.

The fourth is to promote the construction of natural gas distributed energy projects. At present, nine natural gas cogeneration and natural gas heating projects such as Qingdao North Station EMU have been completed and put into operation.

Fifth, the implementation of gas to coal. At present, all 15 industrial and commercial steam users such as Qin Hai Square in the north of the city have been replaced by natural gas. This year, 25 households in Taitung, Liaoning Road, Qingjiang Road and Hong Kong Road will replace natural gas and completely stop the supply of coal-fired steam in summer.

;