What does the technical preparation include?
Production technical preparation includes: 1, preparation of technical documents such as drawings of products and parts; Processing and assembly procedures; The man-hour quota and consumption quota of various materials, etc. Before the implementation of the production operation plan, the relevant technical documents should be sent to all sections and teams. 2. Preparation of raw materials and outsourced parts Raw materials and outsourced parts should meet and ensure the needs of the production site in terms of specifications, varieties, quantity, quality and delivery date. To this end, the planner must master the supply situation and adjust the production plan according to the incoming materials and parts when necessary. 3. Equipment maintenance and preparation The normal operation of the equipment is an important guarantee for completing the production and operation plan. When making the operation plan, we should consider the needs of equipment maintenance and overhaul, implement the equipment pre-repair system, prepare vulnerable spare parts, and ensure that the equipment is in good running condition. 4. Tooling preparation All kinds of tooling (such as tools, measuring tools, fixtures, molds, etc.) required for on-site production must be prepared in advance. When making production operation plan, we should check the preparation of tooling, and organize procurement, manufacturing and maintenance in time if outsourcing, manufacturing and maintenance are needed. 5. The personnel are prepared to arrange the distribution of workers of various technical types, the arrangement of work shifts, the temporary deployment of workers in each team and workplace, etc. According to the requirements of the production and operation plan. 6. Preparation of power and transportation Power supply and material transportation are the basic conditions for normal production. Fuel should be prepared for power supply, and power transmission and transformation equipment should be maintained to maintain normal operation. Make good preparations for material transportation, maintain transportation vehicles, equipment and facilities, and arrange transportation routes reasonably. (Solemnly declare: All blog posts of Practical Treasure Gourd are management experience of Chen Peng, please respect the teacher's achievements, and please indicate the source if you need to reprint them.