Be sure to watch, listen, learn and ask more questions.
1. Read more pictures and turn over the standard atlas. It is best to work with a project at the scene. Only in this way can we understand the specific construction process and technology. Know something about architecture and know fairly well. In order to do the cost well, otherwise it is behind closed doors.
2, to be familiar with the bill of quantities, quota, familiar with the specific calculation rules, quota subtitle, can set the quota correctly, this is the basic skill of cost personnel. You must be familiar with the interpretation and calculation rules in the quota, and it is important to compare the quantity with others in the future.
3, but also to master the number of valuation software, graphic calculation software, such as Guanglianda and Luban, and skillfully operate drawing software such as CAD to facilitate reading electronic drawings.
construction cost
The direct meaning of project cost is the construction price of the project. Three elements of project valuation: quantity, price and cost. Engineering cost in a broad sense includes construction engineering cost (civil engineering and installation specialty), highway engineering cost, water transportation engineering cost, railway engineering cost, water conservancy engineering cost, power engineering cost, communication engineering cost, aerospace engineering cost and so on. Project cost refers to the total cost of a project construction, and its core contents are investment estimation, design estimation, revision estimation, construction drawing budget, project settlement and completion settlement. The main task of the project cost is to calculate the direct costs (labor costs, materials and equipment costs, construction equipment use fees), enterprise management fees, measures fees, fees, profits and taxes included in the project according to the drawings, quotas and list specifications.
Personnel engaged in project cost should be familiar with the technical specifications, cost quotas and related construction management systems of various professions, be familiar with the measurement rules of various professions, have strong engineering quantity calculation ability, be able to prepare cost documents at various stages of the project (investment estimation, design estimation, revised estimation, construction drawing budget, tender control price (bill of quantities budget), bid quotation, project settlement and final accounts), be skilled in using cost software and have certain information.
Chinese name
construction cost
Foreign name
project cost
Core content
Budget estimate, budget estimate, budget, settlement, final accounts, etc.
frame of reference
Regulations, quotas, drawings, human resources and machine prices, etc.
Industrial authorities
Quota Department of Ministry of Housing and Urban-Rural Development
professional certificate
Buildings, railways, water conservancy and highways
Degrees awarded by colleges and universities
bachelor