Are you looking for a model article about the minutes of the design disclosure meeting? I just compiled two examples for your reference, hoping to help you.
Design disclosure, that is, the construction unit organizes the general contractor and supervision unit to participate, and the survey and design unit makes disclosure on the construction drawing, or the general contractor organizes subcontractors and labor teams, and the general contractor makes disclosure on the construction drawing.
Minutes of Design Disclosure Meeting II Time: xx, xx, XX, XX
Venue: Meeting room of xx Cultural Center Construction Leading Group Office
Units and personnel attending the meeting:
Construction unit: XXX, XX, etc.
Design unit: xxx x worker
Zhicheng supervision company: xxx xxx
Construction unit: xxx xxx, etc.
Other related experts: X worker, Dean X, etc.
Meeting contents:
First, the purpose of design disclosure
The purpose of design disclosure is to make the construction unit and supervision unit correctly implement the design intent, deepen the understanding of the characteristics, difficulties and doubts of the design documents, master the quality requirements of key parts of the project, and ensure the quality of the project.
Second, the content of design disclosure
General introduction of construction drawing design documents, description of design intent, special process requirements, description of difficulties, doubts and problems that are easy to occur in the construction of buildings, structures, processes and equipment, and description of design drawings of the construction unit, supervision unit and construction unit, etc.
Third, the design disclosure participating units
(a) the engineering investigation unit, including the person in charge of the project;
(two) the design unit, including the technical director of the unit and the professional designer of the project;
(three) the construction unit, including the technical director of the unit, the project manager and the technical director of the project;
(four) supervision units, including the technical director and project director of the unit;
(5) Relevant personnel of the construction unit, including technical personnel of the project department, project leader, engineering office, technical office, quality and safety office, chief engineer's office, bureau leaders and other relevant personnel.
(six) quality supervision station, safety supervision station and other related personnel.
Fourth, the general process of design disclosure
(a) the moderator's speech, briefly introducing the purpose and content of the disclosure;
(two) the engineering investigation unit shall briefly introduce the engineering investigation according to the requirements of the host;
(three) the design unit according to the requirements of the host, a brief introduction to the design documents;
(four) various technical problems and solutions put forward by the construction unit in the design documents;
(five) various technical problems and solutions put forward by the supervision unit in the design documents;
(six) various technical problems and solutions put forward by the project department of the construction unit and relevant offices in the design documents;
(seven) various technical problems and solutions put forward by the quality supervision station in the design documents;
(eight) all kinds of technical problems and solutions in the design documents put forward by the safety supervision station;
(nine) the design unit will give a comprehensive answer to all kinds of technical problems and solutions in the design put forward by the relevant units;
(ten) the general office of the construction unit shall give a reply or put forward a solution to the relevant technical problems that need to be clarified by the construction unit of the design institute;
(eleven) the construction unit bureau leadership instructions;
(12) Moderator's summary.
V. Organization design disclosure
Before the design disclosure, the supervision unit and the construction unit need to carry out the blue prints.the design, and organize it into a list of problems, and submit it to the design unit one week before the design disclosure. Design disclosure shall be organized by the construction unit. The minutes of the design disclosure meeting shall be written by the design unit and countersigned by all parties. Where design changes are involved in the design disclosure, the design change procedures shall be handled according to the procedures or directly modified by the design unit in the construction drawing. The minutes of design disclosure meeting are the basis of construction and supervision.
Minutes of Design Disclosure Meeting II Time: xx, xx, XX, XX
Venue: Meeting room of xx Cultural Center Construction Leading Group Office
Units and personnel attending the meeting:
Construction unit: XXX, XX, etc.
Design unit: xxx x worker
Zhicheng supervision company: xxx xxx
Construction unit: xxx xxx, etc.
Other related experts: X worker, Dean X, etc.
Meeting contents:
The meeting was presided over by xXX, deputy director of XX Cultural Center Project. Xxx, the project leader of China Construction Design Institute, gave an overall introduction to the design of the basic part of the project, and made a detailed disclosure of the important issues of the basic part.
1, disclosure content of design institute:
(1) Seismic grade of this project: seismic grade II for libraries and archives, and seismic grade III for planned exhibition halls; The part of the garage outside the main building within the scope of xxm has the same seismic grade as the main building, and the rest is Grade III seismic.
(2) See the atlas xxxxxx for the construction of foundation raft.
(3) 3) Whether SBS waterproof material is insulated or not, and whether it is necessary to consider setting external steel pipes as grounding down lead.
(4) There are reserved holes in the toilet of archives, which should be paid attention to during construction.
After receiving the professional construction drawing, the supervisor and the construction unit carried out comprehensive and detailed reading and review activities of the construction drawing. In view of the problems in the construction drawing, the two units raised questions and asked the designers to give explanations.
2, the construction supervision unit questions are as follows:
(1) Whether the west columns of the two columns south of Axis a-a of the planning exhibition hall are demolished;
Answer: Yes, remove it.
(2) The foundation beam of the planned exhibition hall has a steel bar, which is marked as 2/8 in the drawing.
Answer: It should be changed to 8/2.
(3) The extension dimension to the west of the strip foundation in the library foundation plan is not clear;
Answer: symmetrical to the east.
(4) whether it is possible to remove the waterproof layer leveling layer xxmm.
Answer: Yes, the top elevation of foundation beam is reduced by xxmm and added to the basement floor.
(5) Determination of reinforcement connection mode;
Answer: Carry out the construction according to the connection method required in the design instructions. Lapping is used for diameters below xx, and mechanical connection is used for diameters above xx (including xx).
3. General Manager X put forward requirements for the foundation reinforcement construction of instrument exhibition hall:
The additional steel bars on the upper part of the raft foundation in the gauge exhibition hall cross each other and are interspersed with the steel bars in the foundation beam, and the steel bars are relatively dense in some places. Attention should be paid to construction, especially to meet the vibration in concrete construction.
Finishing by supervision department
Xxxx,xxxx,xx,xx
;