Chapter I Project Overview

Project Name: Library Phase II Project

Construction site: No.89, XX North Road (on campus)

Designer: Municipal Education Architectural Design and Research Institute Co., Ltd.

Structure/hierarchy: frame/four floors (five floors locally)

The following is an overview of the project:

This project is connected with the library building of Institute of Technology, with a building area of 4930m2, a total height of 19.4m, a design fire resistance rating of Class II, a service life of 50 years, an important building category of Class C, a building safety rating of Class II, a building site category of Class III, a moderately weak site and a moderately liquefied site, with Tg=0.306s, a building pile foundation safety rating of Class II and a seismic fortification intensity of 7.

I. Overview of architectural design:

1 Dampproof of wall foundation: Su J9501-11,not provided where there are ring beams.

2. Ground practice: the stacks are partially overhead: terrazzo floor, Su J950 1-5/3, with copper bars.

Hall part: granite floor, Su J 9501-18/2; Fire control room: single-story hardwood floor, Su J 9501-20/2; See Su J9501-14/2 for the light gray non-slip floor tile in the bathroom; The rest: terrazzo floor, Su J950 1- 10/2, copper platoon branch.

3 floor practice: see su j 9501-1/3 for light gray non-slip floor tiles in the bathroom; Others: terrazzo floor, Su J950 1-5/3, copper bar grid.

Exterior wall painting: unless otherwise specified, it is light blue elastic paint wall, Su J950 1-22/6.

5 interior wall method: the first floor lobby part: marble wall, Su J 9501-25/5; Toilet: 150×300 white glazed tile wall see Su J950 1-22/5, and the height reaches the bottom of the board; Others: latex paint wall, Su J950 1- 15/5.

6. Kick and platform: In the lobby, marble kick and platform, Su J950 1-6/4, kick 200; The rest, terrazzo skirting, terrace, Su J950 1-5/4, skirting height 150, concealed.

7 Cement corner protector: cement corner protector J950 1-30/5.

Roofing practice: polymer modified asphalt coiled material waterproof roof, Su J950 1-22/7(B), emulsified asphalt expanded perlite for slope, the thinnest part is 70.

9. Flat roof method: for the bathroom part, spray flat roof at the bottom of the board, Su J 9501-3/8; The rest, gypsum board ceiling (1), Su J9501-18, the first floor ceiling is 3000 meters away from the ground, and the first floor ceiling is 3200 meters away from the corresponding floor.

10 paint: ready mixed paint, Jiangsu J950 1-3/9, the contact part between wood members and masonry and the non-exposed part are coated with cypress oil for corrosion protection; Metal base, Su J950 1-23/9

1 1 other: stainless steel stair railings and handrails, handrails and handrails at corners, Su J940 1- 1 30; See su j 9401-130 for the window protective railing; Embedded parts Su J 9505-2/28; Step anti-skid Su J 9505-7/27; Granite terrace su j 9501-7/11; Aproll method: fine stone concrete aproll J 9501-2/12; All the retaining walls and other parts that pick out the wall surface should be drip line, and should be straight, neat and smooth; 120 high concrete water stop is made at the bottom of the bathroom wall from the cast-in-place floor.

Second, the general situation of structural design

1 The reinforcement is grade I steel, grade II steel and low-alloy disc steel.

2. Masonry: Mu 10 and KM 1 block clay hollow bricks are used for the frame filler wall, and Mu 15 fly ash brick and M 10 mixed mortar are used for the elevator shaft wall. Fly ash brick mu15 is used below 0.000; Mortar: M7.5 cement mortar is used below 0.000, and M5 mixed mortar is used above 0.000.

Thickness of concrete protective layer: plate protective layer 15mm, beam and column protective layer 25mm and foundation protective layer 35mm.