Procedure: When the project is completed and accepted, we must pay attention to this procedure:
1. According to the scale and complexity of the construction project (project), the acceptance of the whole construction project (project) can be divided into two stages: preliminary acceptance and completion acceptance.
Large and complex construction projects (projects) should be initially inspected, and then all construction projects (projects) should be completed and accepted. Smaller and simpler projects (projects) can be accepted at one time. ?
2, the construction project (project) before the completion of the project acceptance, the construction unit shall organize the construction, design and use of the relevant units for preliminary acceptance. Before the preliminary inspection, the construction unit shall sort out the documents and technical data in accordance with state regulations and submit the completion report to the construction unit. After receiving the report, the construction unit shall organize the preliminary inspection in time. ?
3, after the completion of the construction project (project), the single project acceptance, meet the design requirements, and have the completion figure, final accounts, project summary and other necessary documents. , by the competent department of the project (project) or the construction unit to be responsible for the project completion and acceptance of the unit to submit an application report for completion and acceptance.
Extended data:
Information to be provided during acceptance:
1. When the planning department examines and approves the documents, it is usually required to provide the project planning permit (copy), but the original must be verified. Copy and official seal of the construction unit indicate the original storage location.
2, the project construction permit, provide a copy, submit the original verification, copy stamped with the official seal of the construction unit and indicate the original storage location.
3, the approval document of the public security fire department, the design requirements to provide the original, that is, the construction project fire acceptance opinions.
4. The original document with environmental protection requirements approved by the environmental protection department is the Suzhou Construction Project Environmental Impact Report Form issued by the Environmental Protection Bureau of our city.
5, construction drawing design document review report, according to the original relevant provisions.
6. The Special Acceptance Opinion of Construction Project Archives, namely the Receiving Contact Sheet of Construction Project Archives provided by the Urban Construction Archives (original).
Other documents required by laws and regulations.