Easy to build and open office effect
First, the office network wiring office decoration design process, network wiring must be through the tube. In the requirements, galvanized pipes should be used as much as possible, and iron boxes should be used for cable boxes, instead of common ones at home. Many offices are equipped with air conditioning and central fresh air system, but the ventilation in the room may not meet the requirements. Therefore, it is necessary to authorize and entrust authoritative experts to increase or update ventilation openings and help improve the construction.
2. Before the office furniture is in office decoration, we should find a better furniture factory. Most company offices must have very high office partitions, so many lines and power outlets are connected by decoration partitions. Therefore, the furniture factory must have a close relationship with the mechanical and electrical engineers, and the engineering drawings must be determined first, and then approved by the real estate company.
Third, like central air conditioning, in the design of office decoration, indoor space should be divided by decoration partitions, so it is necessary to ensure a certain number of air outlets and air outlets in each space. In that case, it is necessary to find a central air-conditioning installation enterprise with reliable qualifications. Before the renovation of office decoration, the company reported the graphic design of central air conditioning renovation to the real estate company for approval. After the completion of the project, the real estate company also provides the completion data of the central air conditioning project.
Four, fire fighting equipment in most cases, office decoration must be shielded. After the baffle reaches the ceiling, the smoke nozzle must be replaced. Real estate companies generally require owners and decoration companies to handle it themselves. If you need to find a fire-fighting unit that meets the requirements, the fire-fighting unit must report to the local fire department for approval according to regulations. This time generally lasts from 10 to 15 days.