Current location - Training Enrollment Network - Books and materials - Decision of the Ministry of Housing and Urban-Rural Development on Amending the Measures for the Administration of Construction Engineering Survey Quality (202 1)
Decision of the Ministry of Housing and Urban-Rural Development on Amending the Measures for the Administration of Construction Engineering Survey Quality (202 1)
First, the "construction administrative department" in the first paragraph of Article 4 is amended as "the competent department of housing and urban and rural construction". The remaining provisions will be amended accordingly. Two, the second paragraph of article fifth in the "strict implementation of national fees" is amended as "strengthen performance management, timely and full payment of investigation fees". Two paragraphs are added as the third and fourth paragraphs: "The construction unit shall send the engineering survey documents to the construction drawing review institution for review according to law. The construction unit shall check and accept the survey report, and organize technical disclosure and slot inspection.

"The project leader of the construction unit shall perform the duties of survey quality management on behalf of the construction unit in accordance with relevant regulations." Three. Article 7 is amended as: "Engineering survey enterprises shall improve the survey quality management system and quality responsibility system, and establish a quality responsibility traceability system for survey site work.

"If an engineering survey enterprise entrusts technical services such as exploration, test and detection to other units with corresponding technical conditions, the engineering survey enterprise shall be fully responsible for the quality of relevant exploration, test and detection results." Four. Article 9 is amended as: "An engineering survey enterprise shall make technical disclosure to the design, construction and supervision units, participate in trench inspection in construction, solve problems related to survey in engineering design and construction in a timely manner, and participate in project completion acceptance according to regulations." Article 12 is amended as: "The legal representative of an engineering survey enterprise shall establish and implement its own quality management system, and authorize qualified personnel to be the person in charge of the project.

"The person in charge of the project of an engineering survey enterprise shall sign a commitment letter of lifelong responsibility for quality, implement the survey outline and mandatory standards for engineering construction, implement the survey quality management system of the unit, formulate engineering quality assurance measures, and organize engineering survey work." 6. Article 14 is amended as: "The original records of engineering investigation shall be sorted and checked in time during the investigation to ensure the truthfulness and accuracy of sampling and records, and it is forbidden to forge the original records. Image data of main processes such as drilling, sampling, in-situ testing and indoor testing shall be kept for future reference.

"The Driller, Descriptor, Geotechnical Tester and other operators shall sign the original records. The person in charge of the project of the engineering survey enterprise shall check and accept the original records and sign them.

"Encourage engineering survey enterprises to adopt information technology to collect, record and store engineering survey data in real time." 7. In Article 16, the phrase "observers, testers, recorders, team leaders and other on-site operators shall receive professional training before taking up their posts" is amended as "Driller, descriptor, geotechnical tester and other personnel shall receive professional training in safety production, professional ethics, theoretical knowledge and operational skills in accordance with relevant regulations." Eight. Article 17 is amended as: "An engineering survey enterprise shall establish an engineering survey file management system. Engineering survey enterprises shall, within 20 days after the survey report is submitted to the construction unit, file the engineering survey documents, original records, survey results, testing and quality and safety management records. The archived data shall be signed by the project leader for confirmation, and the storage period shall not be less than the design service life of the project.

"The state encourages engineering survey enterprises to promote the digitization of traditional carrier files. Electronic archives have the same effect as traditional carrier archives. " Nine, delete eighteenth. 10. Article 19 is renumbered as Article 18 and amended as: "The competent department of housing and urban and rural construction of the people's government at or above the county level or other relevant departments (hereinafter referred to as the engineering survey quality supervision department) shall implement the engineering survey quality supervision in a' double random and one open' manner, and the inspection and treatment results shall be disclosed to the public in time.

"The quality supervision department of engineering survey can employ units and personnel with professional technical ability to inspect the quality of engineering survey by purchasing technical services from the government, and apply for security from the finance at the same level.

"Engineering survey quality supervision departments should use information technology such as the Internet to carry out engineering survey quality supervision, and improve the level of refinement and intelligence of supervision." Xi。 Article 23 is renumbered as Article 22 and amended as: "In violation of the provisions of these Measures, if the construction unit commits any of the following acts, the engineering survey quality supervision department shall order it to make corrections and impose a fine of 6,543,800 yuan and 30,000 yuan:

"(1) Failing to provide necessary on-site working conditions;

"(2) Failing to provide the original materials related to engineering investigation or providing the original materials that are untrue and unreliable;

"(three) did not organize the technical disclosure of the survey;

"(4) No groove inspection was organized." Twelve. Article 25 is renumbered as Article 24 and amended as: "In violation of the provisions of these Measures, if an engineering survey enterprise commits any of the following acts, the engineering survey quality supervision department shall order it to make corrections and impose a fine ranging from 6,543,800 yuan to 30,000 yuan:

"(a) the investigation instruments and equipment used are not in conformity with the relevant provisions;

"(2) Operators in key positions such as driller, descriptor and geotechnical tester have not received professional training;

"(three) failing to participate in the technical disclosure or inspection of tank survey organized by the construction unit according to regulations;

"(four) the original records are fraudulent;

"(five) did not save the image data of drilling, sampling, in-situ testing, indoor testing and other major processes for future reference;

(six) failing to timely file engineering survey documents, original records of exploration, test and detection, achievements and quality and safety management records in accordance with the provisions.