. Due to the structural problems of the building, the library space is limited, and the study room has no windows.
This year, due to the epidemic situation, the library is a public place, and the process of "reservation+temperature measurement+health code" is strictly implemented, and the study room has been afraid to open.
At present, the new district is building the East and West Civic Cultural Center projects with high standards. The West District Cultural Center, with the library, natural history museum and science and technology museum as the main body, is located in the west of the city balcony and north of Wanghai Road, with a superior geographical position. Among them, the library is 28,000 square meters.
As a user, the district library has defined the functional partition in the new library. The library has graded reading area, 24-hour self-service area, maker space, information service, excellent traditional culture display and other experience areas, involving multimedia information, electronic reading, special reading, special research and other functions, which can meet the different learning and reading needs of different readers at different levels.
At present, the exhibition, design and construction of the new museum are being promoted, and it is expected to be put into use on 202 1. The East Citizen Center Project19000m2 (including cultural centers and libraries) is located at No.517, Weihe Road. The main part of the project is planned to be completed in 2065,438+09, renovated in 2020 and put into use in 2026,5438+0.