Fire control rectification report 1
Our company attaches great importance to the safety hazards raised by the fire bureau and its related leaders who ha
Fire control rectification report 1
Our company attaches great importance to the safety hazards raised by the fire bureau and its related leaders who have been inspected and guided by our company since the 25th. In the afternoon, relevant leaders held a meeting to discuss the potential safety hazards raised by your bureau, and made a rectification plan.
First, attach great importance to it and strictly rectify it. In the afternoon, the company held a meeting to deeply understand and reflect on the opinions put forward by the fire department.
There are problems in the company's safety management, which need to be further improved. On-site safety facilities and equipment have potential safety hazards and need immediate rectification. At the meeting, the director in charge of production asked everyone to improve their safety awareness and also to improve their safety awareness. From now on, it is necessary to strengthen safety publicity and education, strictly investigate potential safety hazards, and find one place for rectification, and will never tolerate it.
Second, make a reasonable overall plan and formulate measures. In view of the opinions put forward this time, our company has formulated targeted and planned rectification measures.
1. The Security Section immediately set out to prepare a comprehensive emergency plan for safety accidents in the whole plant, and made a drill plan. On June 3rd/KOOC-0/day/KOOC-0/65438+/KOOC-0/October 3rd, the Security Section organized the employees of the whole factory to conduct drills, leaving written and photo materials.
2. The General Department formulates the responsibility forms at all levels and completes the signature work. 10 year1October 30th, completed.
3. Establish and improve the dynamic files of special operations personnel, led by the Security Section, and completed by each section on June 29th 10.
4, occupational hazard detection work, actively contact with * * safety supervision bureau, complete the detection for the record. This work has been completed by the General Department and the Security Department in cooperation with the Park Safety Supervision Bureau (the time is determined by the * * Safety Supervision Bureau).
5. The maintenance department, the supply department and the security department are responsible for the damaged and unqualified safety facilities and equipment found in the production site, and the rectification was completed on June 5438+065438+ 10/5 in strict accordance with the relevant national requirements.
Third, strengthen supervision and ensure quality and quantity.
The production director of the company personally took charge of the rectification work, led the heads of various departments and sections to accept the rectification work, and ensured the smooth completion of the rectification work for hell to pay who was opportunistic and muddled through.
Fire control rectification report 2
Our school attaches great importance to fire control work, and school leaders put it in the first place in school work. In order to do this work well, our school has seriously carried out self-examination and rectification work and achieved good results. Details are as follows:
First, check yourself carefully.
Our school is an old school with many aging things. Through careful inspection, the General Affairs Department and the Political Department found many hidden dangers. Mainly: there are signs of subsidence on both sides of the old teaching building; A section of stairs between the dormitory and the canteen is very narrow; There are students lighting candles in the dormitory; The teacher used an electric frying pan; The lines in many places in the school are aging; The firewood piled up in the canteen kitchen is not standardized.
Second, timely rectification.
According to the self-examination, our school immediately took measures to seriously carry out rectification work.
(1) For the problem of the sinking of both sides of the old teaching building, the school leaders reported to the town leaders, invited experts to conduct on-the-spot investigation, and carried out reinforcement and reconstruction according to expert opinions.
(2) For narrow stairs, the General Affairs Department will arrange people to widen them immediately.
(3) The General Affairs Department ordered the contractor to pile firewood in the kitchen of the student canteen as required, and set fire exits.
(4) The General Affairs Office reinstalled the circuit for the teacher who used the electric frying pan.
(5) The student management team should strengthen the management of boarders and put an end to lighting candles in the dormitory.
(6) The laboratory is equipped with special administrators and fire extinguishers.
(7) Close the school canteen and regularly check the hygiene of the student canteen.
(8) In view of the aging and disorderly pulling and misplacing of the wires in the student canteen, the rectification shall be carried out immediately.
For fire control work, our school will always persistently strengthen management and patrol. For all kinds of hidden dangers, once found, we will eliminate them in time. At present, we are actively striving for the support of all sectors of society to make fire-fighting facilities in place as much as possible.
Fire control rectification report 3
In order to implement the spirit of "strengthening the current fire control work video conference" in X province on xx, XX, XX, the school leaders attached great importance to it. On xx, xx, X, the school seriously carried out the fire safety self-inspection and rectification work. The situation is now reported as follows:
I. Hidden Danger Remediation Institutions
xxx
Second, the hidden trouble investigation content
Mainly check the classrooms, canteens, canteens, teachers' dormitories, office buildings, construction sites and other related fire safety facilities on campus.
Conduct a comprehensive inspection of illegal use of high-power electrical appliances and disorderly pulling of power cords, and deal with them in time.
Do daily maintenance and maintenance for the normal use of fire fighting equipment such as fire hydrants and fire extinguishers.
For the management of gas and fire, the school arranges special personnel to adhere to the inspection system in key periods (call at any time if there is any situation) to eliminate fire safety hazards in time.
Third, the hidden danger investigation conclusion
The overall situation of the school's X-day safety self-inspection and rectification work was good, and no major fire safety hazards were found. However, there are also some safety details that can not be ignored, such as the use of high-power electrical appliances by individual faculty members for cooking and cooking, and the irregular installation of lighting circuits by construction maintenance workers.
Fourth, hidden dangers remediation measures
The school informed the results of this inspection and seriously criticized and educated the relevant personnel.
Before the start of school in autumn, a fire safety education meeting for teachers and students will be held, and relevant materials on fire safety will be issued, requiring all classes to carry out class meeting activities with fire safety as the theme.
The school strives to strengthen the investment in fire protection and improve the fire prevention ability of key parts such as laboratories, archives and accounting offices.
Strengthen the system of fire safety responsible persons, and require fire safety responsible persons at all levels to attach great importance to it and carry out fire safety inspections regularly.
Improve the "Fire Safety Work Plan", strengthen the construction of fire teams, and form a long-term "fire prevention and extinguishing" working mechanism for school fire safety.
"Hidden dangers are better than open flames, and responsibilities are heavier than Mount Tai". Fire safety work is a constant and unremitting work. With the service tenet of "all for students, all for students, all for students", the school will further strengthen fire safety education, constantly improve fire safety measures, and ensure the safety of teachers and students' lives and property.
Fire control rectification report 4
Xx coal mine fire control project has been completed, and on June 65438+1October 65438+July 20 * *, Yulin fire control public security detachment, China Coal Xi 'an Design Engineering Co., Ltd., Xi 'an Coal Construction Supervision Center, Shaanxi Yinhe Engineering Supervision Co., Ltd., Yinhe Coal Industry Development Co., Ltd., Shaanxi Construction Engineering Group Corporation and other construction units * * * conducted on-site acceptance of the fire control project. After the acceptance, our company immediately organized relevant departments and construction units to make positive rectification. On October 30th, 20** year/kloc-0, the rectification was completed according to the requirements of rectification opinions. Details are as follows:
1. The direction of hanging evacuation signs in office buildings and staff canteens is incorrect, and there are no rectification measures for hanging evacuation signs in some places: re-hang the evacuation signs facing the stairs and facing the corridor; Where there is no evacuation sign, it has been hung.
2. The pipeline well of the office building is not closed: it has been closed with 3l thick patterned steel plate.
3. The fire extinguishers produced by Lianyungang Tianyi Fire Equipment Co., Ltd. have no ID cards in office buildings and single apartments. Rectification measures: After on-site inspection, all of them are fire extinguishers. Because the production date is not clear, 20** looks like 20 * * 8; And conducted an annual inspection.
4. The water curtain system of the tunneling machine room and the coal conveying trestle is equipped with open nozzles, and water curtain nozzles should be installed. It is difficult to open and close the manual plug valve.
Rectification measures: According to Article 6. 1.5 of Code for Design of Automatic Sprinkler Fire Extinguishing Systems (GB 50 * * 4-(Edition)), open sprinkler or water curtain sprinkler should be adopted for fire separation, and the original design does not violate the code (see the reply of China Coal Xi 'an Design and Engineering Co., Ltd.). The manual plug valve has been treated and can now be opened and closed flexibly.
5. There is no fire hydrant in the boiler room.
Rectification measures: According to Article 13.4.2 of Code for Design of Boiler Houses (GB 5004 1-92) and Article 2.3.4 of Code for Design of Water Supply and Drainage in Coal Industry (MT/T50 14-96), indoor fire hydrants are not required.
6. The ammonium phosphate dry powder cart fire extinguisher with a fire extinguishing dose of 25 kg in the material warehouse is of type B and should be of type A. ..
Rectification measures: replaced.
* * Limited
20** years165438+1October 15.
Fire control rectification report 5
In order to seriously implement our school &; L Lay the foundation for students' lifelong development and happy life &; R aims to eliminate any potential safety hazards, put an end to any safety accidents and ensure the safety of life and property of the school and all teachers and students. On the afternoon of July 10, 20xx, our school conducted a general fire safety inspection. In view of the existing security situation in our school, a combination of comprehensive inspection and special inspection is adopted; Combination of self-examination, key spot check and supervision; Combination of inspection and rectification; Check and implement the responsibility system.
I. Specific work arrangements:
1, set up a leading group for school safety work:
Team leader: Wang
Deputy Team Leaders: Yuan Tianlin and Zhou Xianyong
Team members: Wei Qigui, Zhong Shi Caifeng, Zhang Li Jiarunqi, Liang Feng.
2. The rectification contents of this safety inspection:
(1) Whether the fire safety management system is established, whether the fire safety responsibility system is implemented, whether the fire-fighting equipment is complete, whether the fire extinguishers, fire hydrants and emergency lights in key parts of each building are in normal use, and whether the fire exits are unblocked; Whether the management of electricity consumption is strict and whether the management of flammable and explosive dangerous goods in the laboratory is standardized.
(2) Whether the fire safety management system of laboratories and libraries is implemented and whether there are potential safety hazards.
(3) Whether the safe passage or exit is locked, blocked or occupied; Whether the fire safety evacuation indication signs are obvious and reasonable, and whether the emergency lighting is damaged.
3, each department head, class teacher, teaching and research team leader and related personnel.
Have a sense of responsibility, thinking in place. Whether to implement the principle of who checks who is responsible, the responsibility lies with people.
4. Scope of self-examination and self-correction: one person in charge of each office: inside and outside the office, conference room; Class teacher B: fire safety inspection of students inside and outside the classroom and in this class; Lab C: Management Report of Hazardous Chemicals and Highly Toxic Substances. D sports room: sports equipment and facilities; E music teacher: music classroom, dance rehearsal hall; F art classroom, art equipment room; G librarian: library, reading room;
5. The comprehensive office will summarize the self-examination and self-correction, organize relevant personnel to carry out rectification and eliminate potential safety hazards.
6. The General Affairs Department is responsible for organizing male teachers in our school to conduct a comprehensive and thorough inventory of the electricity safety of the teaching building, and eliminate unsafe factors in time when found.
Second, the self-examination results:
(a), the school fire safety system is perfect, the responsibility system is put in place.
(2), teaching building:
1. The switches, lights, circuits and other facilities of the new teaching building are in normal use.
2. Safe passage and exit indicator light are in normal use.
3, fire water, fire extinguishers meet the specified requirements.
4, laboratory, instrument room testing equipment and electricity consumption meet the specified requirements.
5. The electricity consumption of computer room, multimedia room and each office meets the specified requirements.
(3), concierge and sports equipment room
1, concierge water and electricity meet the specified requirements.
2. The equipment in the sports equipment room meets the specified requirements.
Fire control rectification report 6
Our company is a Sino-French joint venture located in the development zone. Since the company settled in, it has received strong support and help from the leaders of the development zone and your company. The production and operation work is smooth and the enterprise has a good development momentum. In the process of enterprise development, the company leaders attach great importance to fire safety work, regularly organize personnel to participate in fire safety training, set up special safety officers and safety administrators, formulate and improve various fire safety systems, ensure the investment of fire funds, and continue to pay attention to fire safety work. Just in the first half of this month, another online training on fire fighting equipment was organized.
Nevertheless, there are still some shortcomings in our fire prevention work. On July 23rd, 20xx, during the routine fire inspection of your company, six fire safety hazards were found.
Company leaders attach great importance to the existing fire hazards. At night, a meeting on "Fire Hazard Investigation, Rectification and Implementation" was held overnight. The chairman of the company proposed to ensure that "fire safety inspection does not leave a dead end". Participants agreed that the rectification of fire safety hazards is not only related to the life and death of the building, but also to the lives of all employees and the safety of company property. Responsibility is more important than Mount Tai. We must make concerted efforts with Qi Xin, go all out and carry out a thorough rectification at all costs. The meeting decided to further set up the "Leading Group for Fire Safety Special Renovation" on the basis of the original safety management structure, with general manager xxx as the team leader, deputy general manager xxx and safety director xxx as the deputy team leader, and safety officer xxx, department manager and section chief as members. In view of the hidden dangers of fire safety and the self-inspection of fire safety found in the inspection, the meeting put forward specific requirements and made it clear that the responsibility lies with people. Arrange the time and task of self-inspection and rectification of each department, and require the implementation at all levels, and the department manager is responsible for it. It is necessary to pay attention to production and safety at the same time, fully realize that the responsibility of fire safety is great, and there must be no slack and luck. The safety inspection leaves no dead ends, which effectively safeguards the life safety of the company's employees. The local meeting made it clear that the work leading group will supervise and inspect every month and link the inspection results with the work assessment of each responsible person. Can not meet the inspection standards, resolutely suspend business for rectification, to ensure the effective development of fire safety work. The potential safety hazards found in the inspection and the rectification scheme are as follows:
First, the security risks found in the inspection
1.2 The glass door cover of a fire box in the workshop is missing;
2. Debris piled up in the corridor on the north side of the third workshop;
3.3 The fire hose in a fire box in the workshop is missing;
4. An emergency light in the third workshop cannot be lit normally;
5. sundries are piled up at the east exit of the spare parts warehouse, blocking the passage;
6. The main valve of fire water pipeline is closed.
Second, the security risks rectification
1. Immediately send someone to order the missing glass door cover of a fire box in Workshop 2;
2. Immediately assign personnel to clean up the sundries piled up in the corridor on the north side of the third workshop to ensure the smooth flow of stairs;
3. Immediately assign special personnel to order the missing fire hose in the fire box of Workshop 3;
4. Immediately assign special personnel to replace the effective emergency lights in the third workshop;
5. Immediately send someone to clean up the sundries piled up at the east exit of the spare parts warehouse to ensure the smooth passage;
6. Pay close attention to the research plan, and strive to complete the transformation of the original fire pipeline before the end of August to solve the problem of underground water leakage.
In addition, in view of the root causes of the above-mentioned safety hazards, the "Leading Group for Special Remediation of Fire Safety" requires all departments and sections to report relevant problems at the first time, and decides that safety personnel should inspect the fixed fire-fighting equipment and stairs of the company every week to ensure that possible safety hazards can be found and solved in time.
Third, the fire hose valve is closed.
1. Reasons for closing the main valve of fire water pipeline
20xx In May, the company's finance found that the water fee was abnormally high. After careful investigation, it was determined that the underground fire-fighting pipeline was broken due to the short land-forming time and land subsidence in the development zone. Due to the large flow of fire pipes, and the impact of a large amount of running water may lead to underground soil erosion, there is a hidden danger of large-scale settlement safety accidents, so the company decided to temporarily close the main valve of fire pipes, and then frequently open the main valve of fire pipes after the leaking pipes are detected and repaired.
2. The rectification process of underground fire hose rupture
After discovering the rupture problem of underground fire-fighting pipeline, the company leaders attached great importance to it, arranged the construction team to enter the site in May, and carried out ground excavation several times from May to July in order to find the specific rupture position of underground fire-fighting pipeline. However, because the underground pipeline is unknown, despite repeated efforts, it is impossible to find the specific leakage point. Considering the special circumstances, the company leaders decided to take the plan of rewiring the exposed pipeline on the ground to completely solve the problem.
3. Current difficulties and progress
After deciding to adopt the scheme of rewiring with exposed pipes on the ground, how to wire has become a big problem, because the workshops of the company are widely distributed, each workshop is relatively independent, and vehicles come in and out frequently. In addition, the construction team is not familiar with the specific requirements of fire hose installation, and it is not yet possible to determine the specific transformation plan.
Despite the difficulties, the leaders of the company are determined to rebuild the fire hose. At present, we are considering inviting professional designers to negotiate with the fire department to determine a reasonable and feasible renovation plan and implement it as soon as possible, so as to complete the renovation work before the end of August.
Fourth, thinking about the fire hazards after rectification.
1. Through the timely rectification of fire hazards, the confidence that the hazards can be changed and must be changed is strengthened. Nothing is difficult without knowing it. Only by gritting your teeth can you succeed. Before the fire inspection found hidden dangers, the company leaders had already included the investigation and rectification of fire hidden dangers in the plan. However, due to the wide coverage, the study and understanding of some fire protection theoretical knowledge always feel that it is not solid enough, which leads to the plan not being put into practice in time. After discovering the fire hazard, all employees of the company quickly unified their thoughts, established confidence, made up their minds, ensured investment, and ensured that the hidden danger was thoroughly rectified. Through the rectification of hidden dangers, not only the hidden dangers of fire were eliminated, but also a good atmosphere was created for our company to strengthen the awareness of fire control and earnestly implement various fire control measures.
2. Fire hazards show that our work in the popularization of fire control knowledge and daily inspection needs to be strengthened. The company decided to carefully check all fire hydrants and fire-fighting equipment on a regular basis, configure and replace the defects in time, check by safety officers every Friday, and check by the "Leading Group for Fire Safety Special Renovation" every month, sign a letter of responsibility with each other, establish an inspection account, and implement it layer by layer to ensure smooth crossing, eye-catching warning signs, and everyone is responsible for fire safety. The company decided to further supplement and improve the fire prevention plan, three-level fire warning and annual fire drill plan, improve the fire safety awareness and fire fighting skills of all employees, ensure that the fire safety awareness is implemented to everyone, and improve the company's comprehensive fire prevention ability.
3. The rectification of hidden dangers has laid a good foundation for long-term management. Through the rectification of specific fire hazards, the sense of responsibility and accomplishment of all employees in the company to do a good job in fire safety has also risen, and they have confidence and determination to put me.
The company's safety management has reached a new level and created a new situation. In the future, we will further improve various fire safety systems, fully implement the fire safety responsibility system, rectify all kinds of "habitual" fire violations, ensure long-term management, and ensure that "the hardware is excellent and the software is not soft". The two promote each other and form a virtuous circle.
In a word, through the rectification of fire hazards, the problems existing in our management were exposed, which further pointed out the direction for our future fire safety management. We decided to speed up the progress, complete the transformation of underground fire water pipes as soon as possible, and carry out fire safety work in depth and persistently from all specific aspects.