Shanghai Shimao International Plaza: the tallest building in Puxi, Shanghai, will surpass the Twin Towers and become the tallest building in the world after completion. The main building is 492 meters high, with a floor above 10 1 floor and a total construction area of 38 1600 square meters. The total amount is about 7 billion yuan.
Jiansheji
The new CCTV (the third largest TV station in the world, located in Beijing) was designed by Koolhaas of the Netherlands, with a construction area of 550,000 square meters and a total investment of about 5 billion yuan.
Construction of Three Hangzhou Bay Cross-sea Bridges
It starts from Zhengjiadai, Haiyan, Jiaxing in the north and ends at Shuilu Bay, Cixi, Ningbo, with a total length of 36 kilometers. After the completion of the bridge, the land distance between Ningbo and Shanghai will be shortened by more than120km. Total investment11800 million yuan. The whole project is expected to be completed in 2008.
When the Hangzhou Bay Bridge is completed, it will surpass the Chesapeake Bay Bridge, the longest bridge in the world (27.2km) and become the longest bridge in the world.
Construction of four new capital airports
The main terminal building project is the core part of the expansion project of the Capital Airport, which is located on the east side of the east runway of the Capital Airport. It is a modern super-large aviation hub with world-class functions and characteristics, with a building area of 280,000 square meters, two floors underground, five floors above ground and a building height of 45 meters. The structure type is reinforced concrete and steel structure design, and the total bid price is 4.8 billion yuan.
The project is located in the Capital International Airport of Tianzhu Town, Shunyi County, a suburb of Beijing, with a building area of 335,000 square meters and an area of about 654.38+10,000 square meters. The building plane is I-shaped, with a length of 747 meters from north to south and a width of 343 meters from north to south. The central hall is 12 1 m from east to west, with a single-storey building area of 90,000 square meters.
There are 36 boarding bridges in the south, north and east of the new terminal building, which can dock 36 planes at the same time. The building is equipped with walkways and escalators, 168 ticket counters, and advanced airport management systems, such as automatic baggage sorting, security inspection, building automation control and internal communication.
It is reported that the project will break ground on 28th and be completed in September 2007. According to the design scale, by 20 15, the new terminal can meet the annual passenger throughput of 35 million passengers. By then, the annual passenger throughput of the expanded Capital Airport will reach 60 million passengers, the cargo and mail throughput will be 6.5438+0.8 million tons, the aircraft will take off and land 500,000 times, and the aircraft will take off and land 654.38+0.24 times per hour during peak hours.
Building five international swimming centers
Located in Beijing Olympic Park, the National Aquatics Center is one of the landmark buildings of the 2008 Beijing Olympic Games. Together with the National Stadium, it is located on both sides of the northern end of Beijing's central axis, forming a relatively complete image of a famous historical and cultural city in Beijing. The planned construction land of the National Swimming Center is 62,950 square meters, with a total construction area of 65,000-80,000 square meters, of which the underground construction area is not less than 15000 square meters.
During the 2008 Olympic Games, the National Aquatics Center will undertake swimming, diving, synchronized swimming, water polo and other competitions, and can accommodate17,000 spectators, including 6,000 permanent spectators. During the Olympic Games,1/0,000 temporary seats will be added (to be removed after the games). After the Olympic Games, it will be built into an international advanced center integrating swimming, sports, fitness and leisure.
The design scheme of the National Swimming Center is the "Water Cube" ([H2O]3) scheme produced by the global design competition. The scheme was jointly designed by China State Construction Engineering Corporation, Australian PTW Architects and ARUP Australia Limited. The design embodies the design concept of [H2O] 3 ("Water Cube"), which integrates architectural design and structural design. The design is novel and unique, which is in harmony with the national stadium, fully meets the requirements of the 2008 Olympic Games in function and is easy to operate after the game.
Beijing State-owned Assets Management Company is responsible for the construction, management and operation of the National Swimming Center, which will start at the end of 2003. The total construction period of the project is planned to be three years, and the planned total investment exceeds 654.38 billion US dollars. It will be completed and put into trial operation before the end of 2006, and passed the acceptance of the International Swimming Federation and the International Olympic Committee.
Beijing National Gymnasium Building 6 A
The total investment of the National Stadium is about 310.3 billion yuan. As the main stadium of the 2008 Beijing Olympic Games, the "Bird's Nest" has a total construction area of 258,000 square meters, covering an area of 20.4 hectares and a ground height of 692,654.38+0 meters. The whole building is oval saddle-shaped, and the concrete structure is mainly divided into one basement and seven floors above ground, forming a three-layer bowl-shaped inclined stand, which can accommodate 9 10000 people.
It will host the opening and closing ceremonies of the 2008 Olympic Games, track and field competitions, men's soccer finals and other important Olympic events.
Franchising and investment and financing methods
CITIC Consortium, composed of CITIC Group, Urban Construction Group and jinzhou area Holding Group, will form a project company together with Beijing State-owned Assets Management Co., Ltd. * *, as the project legal person of the National Stadium, responsible for the design, investment and financing, construction, operation and handover of the National Stadium. According to the franchise agreement, the consortium won the franchise of the National Stadium for 30 years.
It is expected to be completed in 2007.
Building 7, Nanjing Shi Lang City Plaza
Shi Lang City Plaza has a total land area of 32,778.7 square meters and a total construction area of about 220,000 square meters. There are super high-rise pure office buildings, star-rated hotels and high-grade businesses in the city square. The main building is 228 meters high and has 45 floors above ground. The overall design follows the principle of elegance and simplicity. Elegant appearance, the super high-rise main building adopts shiny glass facade, and the top is surrounded by independent glass walls. About 2 billion
Building 8 Tianxingzhou Yangtze River Bridge in Wuhan
The sixth Yangtze River Bridge in Wuhan. The main bridge is 4657 meters long. The highway bridge is a two-way six-lane cable-stayed bridge with a design speed of 80km/h, a main span of 504m and a main tower height of189 m. It is the world's largest span cable-stayed bridge for highway and railway, and the railway bridge can run four trains (two passenger lines and two freight lines) side by side. Because of its unique design and construction difficulties, the bridge is praised as a milestone of the river-crossing bridge by the bridge community.
Total investment: more than 3 billion yuan, completed in 2008.
Architectural Nine National Grand Theatre
The National Grand Theatre project is located in the west of the Great Hall of the People in Beijing and south of West Chang 'an Avenue, with a total area of 1 1.893 hectares, a total construction area of149,520 square meters and a total investment of 2.688 billion yuan. The main building consists of external steel structure envelope, 24 16-seat opera house, 20 17-seat concert hall, 1040-seat theater, public hall and supporting rooms. The shell of the outer steel structure is semi-ellipsoid, with the long axis length in the east-west direction of 212.20m, the short axis length in the north-south direction of143.64m, the building height of 46.285m, and the deepest part of the foundation of-32.5m. The ellipsoid roof is mainly decorated with titanium plates, and the glass curtain wall is gradually opened in the middle. Around the ellipsoid shell is an artificial lake with an area of 35,500 square meters, and all kinds of passages and entrances are located underwater.
The National Grand Theatre is 46.68 meters high, 3.32 meters lower than the Great Hall of the People. But its actual height is much higher than the Great Hall of the People, because the underground height of the National Grand Theatre is as high as 10 floor, and 60% of its buildings are underground.
Total investment: 2.7 billion yuan. Design completed in 2008: PaulAndreuandADP.
Architect Wuhan Qintai Cultural Art Center
Qintai Culture and Art Center has a total construction area of 60,000 square meters, mainly including 1.800-seat Grand Theatre, 1.600-seat Concert Hall and ancillary facilities. The cultural square across the lake from the Grand Theatre consists of a hydrophilic platform, a dance floor near the water and landscaping, which can accommodate 30,000 people at the same time. Upon completion, it will become a cultural and artistic center covering an area of 2. 15 square kilometers. Rare in the world!
Total investment: 560 million yuan.