The depth of soil covering at the top of the pipeline shall not be less than that specified in Table 7.7-7:
Nominal diameter: less than or equal to125150 ~ 200 250 ~ 300 350 ~ 400 450 ~ 500.
Lane (m): 0.81.01.01.21.2
Non-carriageway (m): 0.60.60.70.80.9
It can't be under the frozen soil.