Current location - Training Enrollment Network - Books and materials - What is the minimum width of the book information center in the museum?
What is the minimum width of the book information center in the museum?
The width of the corridor in a general museum needs to be determined according to the nature, scale and different indoor functional areas of the museum.

1. Collection warehouse (collection management area and warehouse area)

The collection management area consists of temporary storage room, turnover room, storage room, appreciation room and keeper's studio. The warehouse area consists of a warehouse and a treasure warehouse.

2. Collection and Protection Technology Zone

Generally, there are collection cleaning and disinfection rooms, photography rooms, repair and reproduction rooms and experimental rooms.

According to the draft of JGJ66 Code for Architectural Design of Museums, the collections are generally transported out of the museum by air or land. Specification of air transport outer packing box (length * width * height157 *105 *160cm/157 *105 * 80cm/79 *105 * 80cm) Specification of land transport carton (length * width * height)1190 * 220 * 225cm/590 *105 * 225cm.

Therefore, the corridor width in the above areas should be determined according to the museum's own needs. That is, the width of the walkway should not only solve the problem of pedestrian and fire evacuation, but also meet the needs of transportation and unloading of exhibits and collections, so the clear width of the main walkway should be greater than1.5m.

3. Business and scientific research areas

Generally, there are offices, books, audio-visual databases, information centers, tour guides, audio-visual production rooms, exhibition design, research and publishing rooms. The aisle width in this area can refer to the Code for Design of Office Buildings (JGJ).

67。 That is, the width of the office building walkway arranged on one side is1.30 ~1.50m; The width of the walkway of double-sided cloth public houses is1.50 ~1.80m .. and it should meet the requirements of the current fire code.