A project has been designed twice. How do you charge for the design?
I. Engineering design fee standard The engineering design unit signs a contract with the entrusted task unit, and the design fee is charged for performing the contract.

Two, this fee standard is compiled by the competent department of survey and design in the State Council, approved by the State Price Bureau and the competent department of survey and design in the State Council, and issued by the engineering design unit that undertakes the task. Construction units, engineering design units, design review departments, China Construction Bank and other units should master and supervise the implementation.

3. The first volume of the third volume of this charging standard includes: petroleum, steel, gold, nonferrous metallurgy, building materials, machinery, chemicals and petrochemicals, medicine, textile, light industry, transportation, radio and television, commerce, grain, forestry, civil construction, municipal administration, water conservancy and hydropower, national defense, railway and other 20 industries; The second volume includes six industries (84 volumes): nuclear industry, aviation, electric power, weapons, ships and aviation; The third volume, Quota of Charged Workers for Engineering Survey and Engineering Design, includes three industries: coal, electric power and post and telecommunications.

Four. This charging standard was issued by the former Family Planning Commission in 1984 and 1985. The basis of the charging standard is fixed, and the revised version still embodies the principle of low charging, that is, this charging standard is calculated according to the comprehensive design ability of engineering design units in various industries, taking into account the necessary expenses such as technology development, business construction and personnel training, and must be paid to industrial and commercial tax.

V. Charging standards The main and auxiliary charging offices are calculated according to the budget of individual projects. The basic charging offices are in addition to the pilot charging offices in the coal, electric power and post and telecommunications industries.

The main contents of the charging standard for intransitive verbs:

1. Engineering design fee: generally including preliminary design budget, construction drawing design, cooperative construction stipulated in the contract, technical disclosure of design, participation in trial operation, project completion acceptance, etc. This cost standard does not include the cost of making the construction drawing budget.

2. Pre-preliminary design cost: the cost of preparing feasibility study report, designing task book, participating in site selection planning and conducting environmental pre-assessment.

3. Design fee for non-standard equipment: refers to the design fee for non-standard equipment. Engineering design itself includes equipment design, and the design fee for non-standard equipment shall be charged separately. Due to the characteristics of the industry and the design scope of non-standard equipment, it is stipulated by each industry.

4. Software compilation fee: refers to the compilation fee of computer control programs in the production process of the factory, and the software compilation fee is subject to industry standards; There are no standards in the industry. According to the use value and advanced degree of the software, and considering the actual workload of compiling the software, both parties agree to provide technical materials, drawings, translations, computer calculations, etc. Except for work. The charging standard shall be formulated separately by the competent department or the engineering design unit.

Seven. Entrusted process design or civil engineering and public engineering design shall be calculated according to the proportion of industrial design workload. Entrusted preliminary design or construction drawing design is calculated by multiplying the industrial design workload by the coefficient 1. 1. The construction drawing budget is calculated by multiplying the engineering design charging standard by the coefficient 1. 1. The charging standard for engineering design is calculated according to the design of new projects, and the expansion projects are multiplied by 65438+ according to similar new projects, unless there are clear regulations in the industry. Technical transformation projects are calculated by multiplying the design technical complexity by the coefficient 1.2- 1.4. Seismic fortification works need to be calculated according to the quota, and multiplied by the coefficient 1.2 according to the increase of design workload.

Eight, the design documents provided by the engineering design unit must meet the depth and quality standards stipulated by the competent department, and according to the regulations of various industries, according to the requirements of the entrusting unit, increase the number of copies provided, and charge the printing fee separately.

Nine, engineering design adopts standard design (except standard drawings), reuse design according to 20% of similar new design projects, need to be equipped with foundation or local modification according to 30% of similar new design projects. Since the design is completed, the reuse of non-standard equipment design has been reduced by 20% every time. The drawing data fee is charged according to the drawing data standard.

Ten, engineering consulting services involved in planning and investigation, inquiry, quotation, foreign negotiations and other technical services, and did not formulate specific charging standards. The charging standard is calculated according to the direct production personnel, and the labor quota is calculated according to the 85 yuan of each worker, or the design commission signs a contract according to the task situation to determine that the task needs to go out within 60 years, and its travel expenses shall be borne by the entrusting unit.

Ten, according to undertake the design task of single project budget foundation fee, the calculation base should be deducted from the temporary project cost, construction technology and equipment costs, construction machinery purchase fee to join the joint debugging fee, single project budget should be based on the preliminary design budget approved by the competent department.

12. The imported equipment projects are charged according to the estimated budget of individual projects, and all the design fees are borne by me. The equipment price is calculated according to the price of similar equipment in China, the internal reference price is calculated according to the original price of the equipment, the imported equipment is charged according to the budgetary estimate of a single project, and the process design of the project is undertaken by the outside. The calculation base should include the price of process equipment; The fees charged according to the physical quota are deducted from the corresponding design fees according to the proportion of industrial design workload, and the corresponding process design coordination fees are determined by the design committee through consultation according to the actual workload.

Thirteen, the design should be carried out in accordance with the depth of the international general design procedures, and the design fee should be increased for projects exceeding the current design depth. The specific increased workload shall be determined by the design committee through consultation.

Fourteen, to undertake the design tasks in remote areas such as Xinjiang, the expenses shall be calculated according to the quota, and the tasks in Tibet shall be calculated according to the original quota multiplied by the coefficient 1. 1.2.

Fifteen, due to the task undertaken by the engineering design unit, its expenses (including foreign exchange quota) are paid by the entrusting unit, and its expenses are paid by the design unit itself, in order to improve its level and other original habits.

The engineering design unit undertakes the task, and the project needs to be tested. The entrusting unit is responsible for the equipment and materials.

Sixteen, this fee standard takes into account various factors that affect the design workload. The adjustment coefficient of each factor exists at the same time as the two elements of the project. The total adjustment factor of the project shall be calculated and the high value of each individual adjustment factor shall be added to 1. The design fee is calculated according to the physical object or labor quota. The project cost with an investment of 300 million yuan is higher than the estimated proportion 1.5%.

Seventeen, the design of the engineering design unit adopts advanced technology and the economic benefits are confirmed by the design review. The examination department at the next higher level decided to increase the design fee. If the design quality and technical level meet the contract requirements within 65,438+00%, the design fee will be deducted according to the contract.

Eighteen, design fees should be paid according to the design progress, and according to the design contract in advance to the design unit as a deposit; After the preliminary design, it was handed over to 130 yuan; Pay after the construction drawing is completed 150 yuan. According to the Regulations on Construction Engineering Survey and Design Contracts, the design fee shall be offset by the security deposit when performing the design contract, and the design task undertaken by the design unit shall be paid off. Construction projects shall cooperate with the construction, participate in the trial operation assessment and project completion acceptance, and other technical service fees and travel expenses shall be charged separately.

19. This charging standard is applicable to the design fees of domestic investment construction projects undertaken by design units affiliated to the city, and the design tasks undertaken by design units affiliated to the county are charged by multiplying this charging standard by the coefficient of 0.85-0.9. The design fees of special economic zones (except for investment projects within the budget of key construction projects) shall be subject to market adjustment prices, and the design fees of foreign-funded joint venture construction projects shall be determined by the design unit and the entrusting unit through consultation with reference to foreign design fees, and shall be determined through consultation with the design committee.

Twenty, this fee standard does not include the design fee of the project, which is determined by the design unit and the entrusting unit through consultation with reference to this fee standard.

Contents of survey and design work

Investigation:

Fast-growing and high-yield timber forest base: classification and mapping, forest type and specialty survey, social and economic survey, road and its affiliated projects survey.

Nursery plantation: site selection, surveying and mapping, professional investigation and building site selection.

Afforestation by aerial seeding: investigate the seeding area, investigate the types and characteristics of the seeding area, and investigate the route and navigation points of the seeding area.

Design:

Fast-growing and high-yield timber forest base: management division, determination of afforestation type, tree species planning and design, afforestation technology design, road fire line and other auxiliary engineering planning and design, design instructions and planning drawings preparation, design budget.

Nursery: general layout design, technical design, road irrigation and drainage engineering and ancillary engineering design, manuals and budget estimates, etc.

Aerial seeding afforestation: afforestation tree species, sowing quantity calculation, design, route, waypoint design specification, sowing area estimation, etc.

Description of charging standard for civil building design

This charging standard includes the fixed charging standard for all kinds of civil construction engineering design.

Second, the main characteristics and scope of application of civil buildings are divided into six levels according to their complexity:

Main characteristics of engineering grade engineering Example of engineering scope

Special key projects or international high-grade public buildings

Public buildings with full historical significance or particularly complicated technical requirements.

30-story building

Buildings with special requirements for sound and light in high space.

Hotels, family clubs, international conferences, international sports, international trade, international airports, international comprehensive clubs, important historical memorial buildings, family-level libraries, museums, art galleries, theaters, concert halls, and three-level defense.

1 advanced public buildings

Buildings with complex regional historical significance or technical requirements.

16, 29-storey or 50m-high public building

Advanced hotels, tourist hotels, advanced guest houses, villas, provincial exhibition halls, museums, libraries, scientific experimental research buildings (including institutions of higher learning), advanced halls, advanced clubs, hospitals with beds of 300 or more, sanatoriums, medical technology buildings, outpatient clinics, gymnasiums, indoor swimming pools, indoor skating rinks, urban railway stations, shipping stations, terminal buildings, studios, post and telecommunications buildings, and comprehensive facilities.

High-grade and large-scale public buildings

Buildings with high technical requirements

16th floor, 29th floor residence

College teaching building, archives building, auditorium, cinema, department, provincial office building, 300-bed (including 300-bed) hospital, sanatorium, city library, cultural center, young workers' club, rehearsal hall, lecture hall, wind and rain playground, urban bus station, railway station, post office, comprehensive shopping mall, flavor restaurant, elderly residence, etc.

Class III and Class III public buildings

7-storey (including 7 floors) 15-storey elevator residence or frame structure building

Key and other professional schools, teaching and experimental buildings, audio-visual education buildings, social hotels, restaurants, guest houses, bathrooms, post offices, outpatient clinics, department stores, nurseries, comprehensive service buildings, shopping malls on the second floor, canteens on the second floor and railway stations.

4 General public buildings

7-story elevator residence, dormitory and brick-concrete building

General office building, teaching building, single-story canteen, single-story garage, fire garage, fire station, vegetable shop, grain depot, grocery store, reading room, barber shop, flush toilet, etc.

The two-story single-function and general-span structural buildings have the same characteristics.

Third, the architectural design case needs to be mentioned separately, and the design fee is charged for the architectural design case of super-class and class engineering10%; In the case of second-class engineering architectural design, the project design fee increased by 6%; 3% of the project design fee is charged for the architectural design case of the third-level project; Four-level (including four-level) projects charge architectural design case fees.

Four. This charging standard has included the special requirements for architectural decoration design of fire protection system. The problem of special decoration for existing buildings is also discussed. According to the complexity of decoration design, 3-5% decoration fee is charged.

Five, the basic units of the single project of this charging standard include gas, water intake, purification, sewage treatment, roads and bridges, boiler rooms, gas stations, power distribution stations, water pump rooms, cooling towers, chimneys and other single buildings and structures, and the charging should be carried out according to the municipal industry standards.

6. For the planning and layout of the undertaking area, 700 yuan is charged for 3 hectares per hectare, and the pipeline, greening and soil design theory in the charging area are charged at 65438+ 0.5% of the estimated budget.

Seven, according to the main function of the building to undertake the building function, more complicated than the main function. Eight, civil construction engineering grade table refers to 1 10,000 square meters of buildings; Type-I refers to buildings with a size of 3000 to 10000 square meters; Type refers to a building of 3000 square meters. This category is only used in this table.

Nine, only do the preliminary design or construction drawing stage design of civil buildings, and the workload ratio is 40% to 60%.

Ten, according to the fee standard to provide documents preliminary design drawings 6 copies, 8 copies of construction drawing reference materials:

[1992] jiafeizi No.375