Subway type
Auxiliary system of Beijing subway
Start and end Wu Futang station
zhuxinzhuang station
Number of sites 33
run quickly
At present, it has been shut down and is in trial operation.
Opening date: July 2008 18 (Beitucheng-South Gate of Forest Park)
20 1 1 year 65438+February 28th (Beitucheng-Huilongguan East Street)
20 12 ends (Gulou Street-Beitucheng)
Zhong 20 13 (Huilongguan East Street-Zhuxinzhuang)
20 13 ends (China Art Museum-Gulou Street)
20 15 ends (Five Blessingg Pavilion-China Art Museum)
Operator Beijing Subway Operation Co., Ltd. (Yunsan Branch)
parameter
The length is 45.7 kilometers.
Line 9
Subway type
Auxiliary system of Beijing subway
Originating station: Guogongzhuang Station [1]
National Library Station [1]
Number of sites 13[ 1]
run quickly
Opening date: 20 1 1 year: 65438+February (Guogongzhuang-Beijing West Railway Station) [2]
September 20 12 (all lines) [2]
Operator Beijing Subway Operation Co., Ltd. (Operation No.2 Branch)
technology
Total length 16.5km (all underground sections) [1]
Line 15
Rail transit subway
Auxiliary system of Beijing subway
Starting station and terminal station
qinghua east station
Fengbo station
Number of sites 20
run quickly
Opening time: 20 10 12.30 (Wangjing West-Houshayu)
20 1 1 year 65438+February (Houshayu-Fengbo) 20 14 year 65438+February (full line)
Operation Company Beijing Subway Operation Co., Ltd. (Operation No.4 Branch)
technology
The total length is 40.8km [1]