Taiyuan 1 65438+1 October1official heating lasts for five months from 2019 65438+1October/to March 3, 20201.
The heating price is the same as last year: the building area is 3.6 yuan/m2, the usable area is 4.8 yuan/m2, and the indoor temperature of heating users is 18℃.
The heating period in Shuozhou is from 20 19 10 to April 25, 2020. The charging standards are: residential 3.6 yuan/month, public buildings and commercial 4.8 yuan/month. If the height of a single floor of a house exceeds 3m, the high-temperature fee of the floor shall be charged according to regulations.
Xinzhou City, Xinzhou City, is ready to enter the countdown of cogeneration central heating, and the reconstruction project of new road backbone network has been stepped up. It is expected that the whole line will be completed in the middle of June 5438+ 10, and the major inspection and overhaul of the safe and stable operation of the first-class pipe network will enter the final stage.
1The equipment, pipelines and maintenance of more than 80 thermal power stations have been basically completed, and Xinzhou Thermal Power will ensure timely heating in the urban area on 1 1.
Payment time: 2065438+September 20, 2009-2065438+June 30, 2009.
Charging standard: residents 16.5 yuan/square meter; Non-resident 35 yuan/m2
Toll outlets:
Chengnan commerce charge service hall
Address: south of Jinyuan Hotel, Yunzhong South Road 100 meters
Tel: 0350-850 1933
Service area: Hot users in the area south of Jiankang Street.
Urban area business charge service hall
Address: North of Qiyi North Road Police Station, Limin West Street
Tel: 0350-850 19 17.
Service area: north of Jiankang Street to south of Heping Street.
Chengbei business charge service hall
Address: the courtyard of Xinjing Community, north of Tonggang Road intersection, Xinglin Street.
Tel: 0350-850 1903
Service area: from the north of Heping Street to the south bank of Yunzhong River.
Duncun business charge service hall
Address: Duncun Management Committee Courtyard
Tel: 0350-850 1932
Service area: north of Yunzhong River.
Yangquan According to Yangquan Thermal Power Company, during the heating period this year, everyone can pay the heating fee online and enjoy free on-site inspection and maintenance services.
Yangquan Thermal Power Company tried out the online payment function. You can go to the service outlets or call the customer service hotline at 2022995 to consult the hot code.
Charge standard:
Residential heating: 4.2 yuan/_ _ month (calculated according to the usable area).
Non-residential heating: 7 yuan/_ _ month (calculated by construction area).
Lvliang central heating service center1October 10 to 10 began to inject water into the heating system, and the central heating period was from1October 10 to March 3 1 the following year.
, the centralized charging period is from September 2 to 165438+ 10/,and the telephone number is 0358-37 1 3073.
The heating period in Yuci, Jinzhong starts from 20 19, 1 1, and ends on March 3, 2020, which is * * * five months. At present, Jinzhong Ruiyang Heating Company has started the water injection and suppression of the secondary pipe network in each district. In order to ensure the normal use of heat this winter, please open the intelligent locking valve as soon as possible.
Telephone numbers for problem consultation and troubleshooting: 0354-3 106409, 3 1064 10.
Payment time: 2065438+from September 6, 2009.
Charge standard:
The residence is charged at 4.30 yuan/square meter per month; (The area is calculated according to the usable area)
6.80 yuan/square meter per month for government organizations; (The area is calculated according to the folding height coefficient of the construction area)
Business users charge 7.30 yuan/square meter per month. (The area is calculated according to the folding height coefficient of the construction area)
Changzhi Shangdang District Chengtou Heating Co., Ltd. 20 19-2020
The heating price is as follows:
Residential buildings are charged 2.55 yuan per square meter per month according to the construction area.
Commercial users charge 4.7 yuan per square meter per month according to the construction area.
The heating period starts from 20 19, 1 1 and ends on 3 1 in March, 2020, ***5 months.
Payment address:
Heating service window on the first floor of Minsheng Building in Changzhi County1;
2. Xiangyang Office (200 meters west of Xiangyang Kindergarten intersection)
3. The outlet address of Lidu Rural Commercial Bank is as follows:
Working hours: 08: 00 a.m.-12: 00 a.m. and14: 30-18: 00 p.m.; Pay fees normally on Saturdays, Sundays and holidays.
Service hotlines: 0355-8 106636, 0355-810188.
In order to ensure the normal heating and coverage of residents in Jincheng this winter, Jincheng is scheduled to build the heating pipe network of the North Ring Road from September 29th to1October 30th 10. During the construction period, the section of Situ Town in the North Ring Road will be closed in stages.
Charge standard of Gaoping City, Jincheng City:
Resident: 3.2 yuan/month/square meter.
Non-resident: 7 yuan/month/square meter.
Linfen Thermal Power Company officially opened the floodgates for water injection on September/KOOC-0/day, and the water injection time of the whole pipe network lasted for two months, namely, September/KOOC-0/day-September/KOOC-0/5, with primary water injection in the heating area and secondary water injection in the heating area on September/KOOC-0/6-June/KOOC-0/0. 16 September to 65438 10 October 30, water injection was carried out in external pipelines and other areas. After the completion of water injection in the whole urban pipe network, the urban heating mode was fully started around June 65438+1October1May.
Payment time of Linfen huozhou city: 2065438+August 2 1, 2065438+June 5, 2009.
Charge standard:
Resident: 15.2 yuan/m2/heating season.
Business: 27.6 yuan/square meter/heating season.
Water and electricity fee: 23.6 yuan/m2/heating season
Yuncheng Yuncheng implements "two-part heating price" for users who charge by heat metering. The total heating price is equal to the sum of the basic heating price and the metered heating price. The basic heating price for residents is 4.8 yuan per square meter, the metered heating price is 0.204 yuan per kWh, the basic heating price for non-resident users is 7.2 yuan per square meter, and the metered heating price is 0.306 yuan per kWh.
Payment time: 20 19 September 1 -20 19 June 10 October 3 1
Charging standard: residents 16 yuan/square meter; Non-resident 24 yuan/m2
Payment outlets:
Yuxiangyuan customer service central business office
Address: Floor 1, Yuncheng Thermal Power Co., Ltd., 50m east of South Gate of Yuxiangyuan Community, East Street, Du Yu.
Toll hotline: 0359-258 1526
Jiefang road customer service central business office
Address: East Gate of Zhonglou Community, Jiefang South Road (opposite to Li Xing Middle School)
Toll hotline: 0359-2270 198
Business hours:
Monday to Friday 8: 00 am-65438+2: 00 pm-3: 00 pm
Tips on heating 1, paying heating fee in advance and stopping supply and resuming business.
Only by paying the heating fee in time, stopping supply and resuming business, and paying the heating fee in full and on time can we enjoy the warmth of heating in winter. In order to avoid congestion, long queues and long waiting time during peak hours, users should pay attention to the payment notice and pay the heating fee in advance to avoid inconvenience.
Make sure there is someone at home during the exam.
Before heating, the heating enterprises will suppress the test water on the pipe network in advance, and post notices on the corridor doors before the pipe network suppresses the test water to inform residents of the time to suppress the test water in advance. On the day of suppressing the test, the user should leave someone at home. Pay attention to whether the radiator, the joint of the heating pipe and the valve of the heating pipe are leaking due to aging and looseness when testing the water.
3. Remove the covering from the heating equipment.
Most heating users will decorate indoor radiators when decorating their houses. Decoration covers pipes and facilities, which affects the maintenance of heating and the effect of indoor convection heat transfer, and reduces the quality of heating.
4. Specially remind users that the water in the heating system can't be used.
Users use water privately, which will cause serious water shortage in the heating pipeline, make the pressure of the heating pipe network unbalanced, lead to unstable heating in part or all of the heating system, and affect the normal heating of other users.
5. Precautions for users who apply for downtime.
Users who apply for stopping heating shall promptly notify the heating enterprises to close the valves, and shall not hold back the pressure to test the water. Otherwise, the water stored in the heating pipes and radiators will easily freeze and crack the heating pipes and radiators after freezing, which will bring unnecessary losses to you and others.