Description of school project construction
Improve school infrastructure construction and apply for school project construction. About how to write the school project construction instructions, the following is my collection of school project construction instructions, welcome to read!

Request for instructions on school project construction

Provincial Development and Reform Commission:

Jiangxi Vocational College of Judicial Police Officers affiliated to our bureau is a full-time public university approved by the provincial government. In recent years, with everyone's concern and strong support, Jiangxi Vocational College of Judicial Police Officers has developed rapidly, especially the infrastructure construction of the college has been significantly strengthened and the teaching environment has been significantly improved, which has greatly mobilized the teaching enthusiasm of the faculty and students of the college and effectively promoted the sound and rapid development of legal vocational education in our province. Here, our bureau expresses its heartfelt thanks!

At present, Jiangxi Vocational College of Judicial Police Officers is in a period of rapid development. The campus covers an area of 184.37 mu, with a building area of 588,068,600 square meters, 5 16 teaching staff and 7,000 students. The existing library was built in 1987, but the construction area is only 1883 square meters, which is far from meeting the needs of modern teaching development and students' learning needs. In order to solve this problem, the college revised the campus construction plan with the approval of the resident construction planning management department in 2006. According to the relevant requirements of the education department for library construction (per capita construction area1.77m2), combined with the needs of its own development, it is planned to build a multifunctional library with a construction area of1.23m2, integrating cultural exchange, information exchange and academic exchange. The planned budget for the new building is 1.200 yuan per square meter, with a total investment of 1.476 million yuan. The required funds will be raised by the college itself. To this end, I sincerely ask you to plan and build a library for Jiangxi Judicial Police Vocational College.

If not, ask for instructions.

Description of school project construction II

Your Bureau's Request for Instructions on Approving the Feasibility Study Report of Nanchang Nangang Middle School Teaching Building Construction Project (No.201142, Shanghai Education Institute) has been received. After study, the reply is as follows:

1. In order to improve the school infrastructure construction, solve the tension problem of middle school classrooms in Nangang School, and ensure that students go to school normally, we agree in principle to the construction project of middle school teaching building in Nangang School.

2. Construction site: in the campus of Nangang School (near the school wall in the east, the garden and volleyball court in the south, the school road in the west and the school wall in the north).

Three. Construction scale and content: the project covers an area of about 6000 square meters, with a building area of about 17620 square meters and a total building height of 28.5 meters. The contents of this construction are: 48 ordinary classrooms, academic lecture hall 1 room, library 1 room, 2 reading rooms, 4 multimedia classrooms, 3 physical and chemical laboratories, 4 language laboratories, 4 information technology classrooms, 3 music and body function classrooms, 2 dance rooms and 6 teachers' offices1room, totaling 6,500. Men's and women's toilets and toilets are set on each floor, and parking lots are set on the ground. In addition, the main road and its pipeline laying in the school campus are attached.

Four. Total investment and source of funds: the total investment of the project is about 25 million yuan; Source of funds: higher-level funding and district financial support.

Five, after receiving the article, please strictly in accordance with the relevant laws and regulations and the spirit of the document, pay close attention to the implementation of the project construction conditions, carefully organize the project implementation, to ensure the smooth progress of the project.

Description of School Project Construction III

Xining Education Bureau:

Your request for instructions on the preliminary design review of the standardized school project in Xining No.10 Middle School (Ning Zi [20 15] No.4) has been received. According to the Reply of Xining Development and Reform Commission on the Feasibility Study Report of the Tenth Standardized School Project in Xining (Ningfa Gaishe Zi [2014] No.244), March 20 15, Our office, together with relevant departments of the province and Xining City and engineering and technical experts, reviewed the geotechnical investigation report submitted by Qinghai Geotechnical Investigation and Consulting Company and the preliminary design compiled by Shenzhen Tongji Architectural Design Co., Ltd., and issued the Notice on Issuing the Examination Opinions on the Preliminary Design of Construction Project after the meeting. According to the examination opinions on the preliminary design, the engineering investigation and design unit revised and improved the preliminary design of this project, and agreed to supplement the revised preliminary design after the examination principle. The answer is as follows:

I. Construction Scale and Content

Xining No.10 Middle School Standardization Project was newly built at the intersection of Yunjiakou Road and Fujiazhai Road in Chengdong District, Xining City, Qinghai Province. The project land is adjacent to Fujiazhai Road in the south, and there are planned roads on the east and north sides. The total land area of the project is 3383 1 m2, and the total construction area of new buildings is 40507 m2. Among them, the total construction area of the wind and rain playground is 1.086 square meters (ground floor, reinforced concrete structure), the total construction area of the comprehensive teaching building is 29,974 square meters, and the frame structure (including: the total construction area of the underground garage is 2,307 square meters, with the first floor underground; The Science and Technology Building has a total construction area of 4056 square meters, with six floors above ground and one underground. The science laboratory building has a total construction area of 5650 square meters and five floors above ground. Total construction area of teaching and auxiliary rooms 1297 1 m2, with five floors above ground; The library has a total construction area of 3935 square meters and four floors above ground. The total construction area of the overhead floor is 765 square meters; Roof stairs, water pump room with a total construction area of 290 square meters); The construction area of the boiler room is 335 square meters (two floors above ground and underground, frame structure); Canteen and student dormitory. The total construction area is 58,665,438+0 square meters (five floors above ground, one underground, frame structure); The total construction area of the staff dormitory is 32,565,438+0 square meters (five floors above ground, frame structure).

This project mainly constructs indoor basketball court and electronic classroom, junior high school ordinary classroom, senior high school ordinary classroom, combined classroom, multimedia network classroom, psychological consultation room, teachers' office, junior high school dance classroom, senior high school dance classroom, stacks, classroom reading room, periodical reading room, junior high school electronic reading room, senior high school electronic reading room, chemistry laboratory, biology laboratory, biological specimen room, physics laboratory, physical inquiry room, comprehensive laboratory, music classroom and art classroom. Medical room, broadcasting room, recording and broadcasting room, community activity room, administrative office, director's office, conference room, archives room, reception room, fire control room, student dormitory, barrier-free dormitory, staff dormitory, public activity room, boiling water room, student canteen, teacher canteen, staple food warehouse, non-staple food warehouse, operating room, dishwashing room, kitchen processing room, men's locker room and women's locker room. Auxiliary facilities such as boiler room, gas room, weak current machine room, high-voltage distribution room, fire pump room, low-voltage distribution room, smoke exhaust room, diesel generator room, oil storage room, underground garage (34 parking spaces), heat exchange station, 250m standard sports ground and outdoor general layout project.

Second, the project budget

After preliminary examination, the total estimated budget of this project is 223.52 million yuan, which is subject to the final approval of the estimated budget countersigned by Xining Development and Reform Commission and our office.

Third, the construction cycle

The construction period of this project is two years.

Four. Main technical measures

(1) In the construction drawing design stage, the design unit should further refine and improve the relevant contents of green building design according to the Implementation Plan of Green Building Action in Qinghai Province, the Design Standard of Green Building in Qinghai Province and the Evaluation Standard of Green Building in Qinghai Province, so as to meet the requirements of one-star evaluation mark in the green building design stage.

(two) the junior high school teaching building is less than 25 meters away from the urban secondary roads, and corresponding sound insulation measures should be taken.

(3) The value of floor (house) live load should be supplemented and refined according to the use function of different rooms and the current relevant codes.

(4) In the construction drawing design stage, further optimize the foundation pit supporting measures and foundation drainage measures.

Verb (short for verb) others

(1) Please inform the design unit to pay close attention to the construction drawing design according to the requirements of the overall urban planning of Xining City and the current relevant national standards, norms and regulations, combined with the actual situation on site and preliminary design review opinions. Once the preliminary design is approved, it shall not be changed at will; If major changes are needed, they should be reported to our bureau for re-examination.

(two) building energy conservation, building materials selection, water supply, power supply, rain pollution reduction and comprehensive utilization, land resources utilization, etc. should be designed and constructed in line with the principles of high efficiency, energy saving, environmental protection and economic application.

(3) Please carefully supervise and implement the modification and improvement suggestions put forward in the preliminary design review in the construction drawing design stage to ensure the engineering design quality and the implementation of various external conditions.

(4) Your unit shall earnestly fulfill the responsibilities and obligations of the construction unit, strictly control the scale and investment of the project construction, strengthen safety management, ensure the quality of the project, and complete the project construction. After the construction drawing design documents have passed the examination and been reported for the record, the construction should be started quickly.

Guess you are interested in:

1. School expansion request

2. Model essay on construction instructions of building engineering

3. Take the construction of campus culture as an example.

4. Ask for instructions from the new dormitory of the school.

5. The school applied for the construction of a sports ground for instructions.