The profile of Lu Zhiyuan is as follows:

Lu Zhiyuan graduated from Beihang University with a bachelor's degree in mechanical and electrical engineering, and graduated from Lanzhou University with a master's degree in business administration. Lu Zhiyuan used to be the Minister of Manufacturing and Human Resources and the Project Manager of Industrial Internet in iPEG Division of Foxconn Technology Group. Deputy general manager of DHD Group, responsible for the overall management of KD Company.

Lu Zhiyuan was mainly engaged in enterprise consulting, senior management consultant, project manager and senior management consultant of Hejun Consulting Group. Good at enterprise top-level design, including business model design and strategic planning; Annual business plan and implementation guidance; Quick delivery and supply chain system construction and implementation consulting; Lean production management system construction and implementation consultation.

Introduction to Lu Zhiyuan's main achievements

1, Dehuida Technology

Lu Zhiyuan helped Dehuida Technology reduce indirect labor by 3 1%, and the corresponding indirect labor cost decreased by 26%. Optimize and reorganize the talent team of middle and senior management team, business team and R&D team. Within two years, the turnover rate will be reduced to below 5%, and the procurement cost will be reduced by 13%.

2. Cody Technology

The inventory turnover days are reduced from 67 days to less than 2 1 day; The material loss rate decreased from 6‰ to below 2‰; Reduce the logistics cost by 20%; Warehouse staff reduced by 35%; The order delivery rate increased from 83% to 96%; The production efficiency has increased by 37%.

3. Foxconn

At Foxconn, Lu Zhiyuan was responsible for developing an evaluation system for engineers, with a satisfaction rate of 965,438+0%. On-site training of more than 7000 middle and junior management talents; Cultivate and build 600 sales elites. ?

4. Anteko

UPPH increased from 43PCS/H to 70PCS/H, and the production efficiency increased by 64%. The material loss of stamping parts is reduced from 3.7% to below 1%; The accurate delivery rate of orders increased from 79% to 95.4%, an increase of 20%.