The time to fill a pool of water, b is 2 hours, so b is the water injection pipe.
B and c are 15 hours, so c is a drain pipe.
C and d are 6 hours, so d is the water injection pipe.
D and e are 3 hours, so e is a drain.
E and a are 10 hour, so a is the water injection pipe.
work efficiency
B is 2 hours, and C is 15 hours.
1/2-1/c =1151/c =13/30 c It takes 30/ 13 hours to drain.
Maximum water injection rate
C and d are six hours.
1/d-13/30 =1/61/d =18/30 days. Water injection takes 30/ 18 hours.
In the same way; In a similar way
D and e are 3 hours, 1/E=8/30 E, and drainage takes 30/8 hours.
E and a are 10 hour 1/A= 1 1/30.
therefore
The maximum water injection speed of d D water injection is 30/ 18 hours.
E, which has the highest drainage efficiency, needs 30/8 hours for drainage.