2. The hourly displacement is 1/( 1/6)=6.
3. The water injection per hour is water injection-waterproofing = 10-6=4. So it needs to be filled with 1/4 hours.
PS: A pipe is filled with water and B pipe is drained. So subtraction is used instead of addition.