(1) Let Part A be x cubic meters and Part B be (6-X) cubic meters.
40X =(6 X)240÷3
120X = 1440-240X
360X= 1440
X=4
Therefore, 40×4= 160 (pieces) is the number of a pieces.
240×(6-4)=480 (pieces) is the number of part B.
Therefore, (240+ 160)÷4= 160 (set)
A: It takes 160 A pieces and 480 B pieces to make 160 sets of such instruments.
(2) Because the working efficiency of A is112, the working efficiency of B is 1/24.
And because the total project ÷ working efficiency = working time.
Therefore, the unit "1" is taken as the general project of this problem.
So there are two problems that can be solved by equations:
Solution: Let the required number of days be X days.
X/ 12+X/24= 1
1/8X= 1
X=8 A: It will take 8 days to complete. ,1÷ (112+1/24) = 8 (days)
A: It takes 8 days. This problem is too simple to be solved by equations. )
(3) Let the purchase price of a big schoolbag be X yuan and that of a small schoolbag be (X- 10) yuan.
0.2X=(X- 10)0.3
-0. 1X=-3 30- 10=20 (yuan)
X=30
Answer: The purchase price of big schoolbag is 30 yuan, and that of small schoolbag is 20 yuan.
(4) set the number of copies as x.
0. 1X =(X-20)×0.09+20×0. 12
0. 1X=0.09X- 1.8+2.4
0.0 1X=0.6
X=60 A: the number of copies should be 60, and the charge is equal.