2/5x+2/3(x-2/5x)+(2/5x- 1/3x)= x-30
You should be able to solve the equation, right? )
Finally x=225
The canal is 225 meters long.
(2)
First month: 2/5 × 225=90 (m)
Second month: 2/3 × (225- 2/5 × 225)=90 (m)
Third month: 2/5× 225-1/3× 225 =15 (m)
Answer: 90m was dug in the first month, 90m in the second month and15m in the third month.
Honey, I hope to adopt. I played it myself. )