4320 divided by 40%= 10800 (m) This is the total workload.
10800-4320=6480 (m) This is the remaining workload.
432 times (1+25%)=540 (meters), which is the current working efficiency.
6480 divided by 540= 12 (days) means that the rest will be completed in 12 days.