It takes 10 hours for the master to do it alone, and there are 36* 10=360 parts in this batch.
6. Let the original first bundle of wires be x meters long and the original second bundle of wires be (4/7)x meters long.
x- 18=(4/7)x-6
(3/7)x= 12
x=28
It turns out that the first bundle of wires is 28 meters long.