The required materials for scheme (2) are: 2π r+2π× r/2+2π× r/3+2π× r/6 = 4π r.
The two schemes need the same amount of materials.
10. 1.22a, 1.037a,0.037a
1 1. 10a+b, (10b+a)+(10a+b) =11(a+b), and this sum is.
12.⑴ 5a+5b,⑵ 1 1(x+y)? -(x+y).