Evaluation standard and calculation method of prefabricated buildings
This paper will introduce the evaluation criteria of prefabricated buildings, including how to calculate the assembly rate and how to evaluate the grade of prefabricated buildings. If you want to know more, please continue reading!

Single building is the key

Single building is the key to evaluate prefabricated buildings. According to the project planning approval document, confirm the building number; The main building and the podium are counted separately, and they are counted separately; Buildings within 500 square meters of three floors can be calculated in groups.

Evaluation of prefabricated buildings

When evaluating prefabricated buildings, we should pay attention to the following points: 1. Pre-evaluation is carried out in the design stage, and the assembly rate is calculated according to the design documents; 2. Comprehensive evaluation after completion, combined with the completion acceptance data; 3. The main structure is not less than 20 points, and the retaining structure and internal partition wall are not less than 10 points; 4. Fully renovated, with an assembly rate of at least 50%.

Decoration suggestion

For prefabricated buildings, we recommend prefabricated decoration. This can better improve the assembly rate and improve the overall quality of the building.

How to calculate the assembly rate?

The calculation method of assembly rate is: actual score/total score = assembly rate. Among them, the total score includes main structure (50 points), enclosure and internal partition wall (20 points), decoration and equipment pipeline (30 points).