1, qualification and reputation
(1) has the qualification of enterprise legal person.
(2) The social reputation is good, and the registered capital is not less than 6,543,800 yuan.
2. Technical conditions
(1) The equipment is complete and reasonable, and the main technical personnel and quantity meet the provisions of the "Equipment List of Main Technical Personnel" in the special application.
(2) The main technical person in charge of the enterprise should have a bachelor degree or above, have more than 5 years of experience in environmental engineering design, have presided over at least 2 medium-sized environmental engineering design projects, and have the qualification of practicing registration (limited to Grade I) or technical titles.
(3) Among the personnel specified in the main technical personnel staffing table, the unregistered personnel shall be the technical leaders who have at least presided over the special category medium-sized environmental engineering design projects applied for in item 1, and have intermediate or above technical titles.
3, technical equipment and management level
(1) It has a fixed workplace and necessary engineering computer-aided design system.
(2) The enterprise management organization and archives management system are sound, and the quality assurance system has been established and operated effectively.
Solid waste treatment, the full name of solid waste treatment, usually refers to the process of transforming solid waste into transportation, storage, utilization or disposal by physical, chemical, biological, physicochemical and biochemical methods, and the goal of solid waste treatment is harmlessness, reduction and resource utilization.
legal ground
Article 4 of the Measures for the Administration of Operation Qualification License of Environmental Pollution Control Facilities must apply for the Operation Qualification Certificate of Environmental Pollution Control Facilities (hereinafter referred to as the Qualification Certificate) in accordance with the provisions of these Measures, and engage in the operation activities of environmental pollution control facilities in accordance with the provisions of the Qualification Certificate.
Article 7 No qualification certificate is required for the treatment and disposal of pollutants generated by the unit or the operation of environmental pollution control facilities of the unit, but the following technical conditions shall be met to maintain the normal operation of the facilities:
(a) full-time operators (environmental protection technology, environmental protection machinery, management, testing, etc.). ) reasonable configuration, complete auxiliary jobs. On-site management and operation personnel of facility operation shall obtain the post training certificate of pollution control facility operation;
(two) a fixed laboratory, equipped with monitoring and testing equipment that can meet the needs of daily monitoring;
(three) to establish a standardized operation quality management system, with a sound operation management system and a plan to prevent and deal with pollution accidents.
If the above conditions are not met, it is impossible to ensure the stable and up-to-standard operation of the facilities, the unit with qualification certificate shall be entrusted to treat and dispose the pollutants generated by the unit or operate the environmental pollution control facilities of the unit.