1. Safety signs: divide safety areas, use safety signs fully and correctly, arrange appropriate safety slogans and signs, and hang safety operation regulations for all kinds of construction machinery.
2, safety protection:
(1), safety protection shed: around buildings, above personnel passages, above mechanical equipment, roads near residential areas, etc., steel pipes should be used to build safety protection sheds. The safety protection shed should be covered with a layer of formwork and a layer of safety net, and the side should be made of steel mesh as protective railings. Bamboo poles and templates are used to build separation walls and protective sheds on both sides and above high-voltage power lines.
(2) Protect the "three treasures, four mouths and five limbs"
On-site personnel insist on using the "three treasures". The personnel entering the site must wear safety helmet and tie the hat belt, wear rubber-soled shoes, and shall not wear hard-soled shoes, high heels and slippers, and shall not wear a seat belt when working barefoot or aloft.
Do a good job of "four ports" protection. Stairs, elevators and reserved holes shall be provided with fences, cover plates and scaffolding. The entrances and exits of buildings under construction, TIC-tac-toe frames and portal frames must be provided with protective sheds that meet the requirements and eye-catching signs.
Do a good job of "five sides" protection. Five sides refer to the periphery of the balcony, roof and floor, the two sides of the runway and chute, and the outside of the unloading platform of the frame project. A double fence or safety net of 1.0M must be set for the "five borders".
3. Construction at night
Sufficient lighting equipment shall be provided for night operation, and 36V low-voltage explosion-proof working lights shall be used for direct operation.
Second, the construction site safety production management regulations
Establish a three-level safety management system. The company manager signs a safety contract with the project manager (level 1), the project manager signs a safety contract with the foreman (level 2), and the foreman signs a safety contract with the construction team (level 3) for safety management.
Under the leadership of the project manager, a safety construction leading group is set up, and two full-time personnel are responsible for the daily safety construction inspection. When problems are found, they should be rectified in time to eliminate hidden dangers, and illegal operation is strictly prohibited. According to the specific conditions of the project, all construction personnel shall be given safety education and safety technical training before entering the site.
At the construction site, do a good job in the safety protection of "Three Treasures" and "Four Doors", and set up safety fences on site to prevent accidents such as stabbing, falling, object hitting, electromechanical injury and falling from high altitude. Without the consent of the project department, it shall not be dismantled, moved or revoked. Strengthen safety production education and strictly abide by safety operation rules and regulations. Do a good job of safety disclosure for operators.
Professional foreman in the technical disclosure of partial project construction, must be written safety technical disclosure at the same time, the implementation of safety operation procedures, predict the possible safety problems in the construction, put forward preventive measures.
Safety in production must be talked about every day, with everyone in charge, everyone in mind, mutual supervision, strict discipline and clear rewards and punishments.
Third, the safety technical disclosure system
1, before the project starts, the safety technical measures should be carefully disclosed to the employees involved in the construction along with the construction organization design, so that the employees can know what measures should be taken at what time and operation, and explain its importance.
2. Before each single project starts, the safety technical measures of the single project must be repeated, and the phenomenon that only the compilers know but the builders don't know must be resolutely corrected.
3. The safety technical disclosure system should be implemented step by step. Before construction, the technical director shall make disclosure to all employees. When two or more construction teams or types of work cooperate with the construction, safety disclosure shall be made according to the progress and crossover operation. The team leader shall make safety disclosure to the workers on construction requirements and working environment every day. When the construction task is issued, the safety technical disclosure record must be filled in.
Four, the construction of temporary electricity safety management measures
Site temporary electricity safety should be strictly in accordance with the Technical Specification for Temporary Electricity Safety on Construction Site (JGJ46-88). The project department shall formulate a management system for safe electricity use. The operation of temporary electricity use on site shall be undertaken by an electrician who has obtained a work license, and the electrician's level shall be adapted to the technical complexity of the project difficulty. It must be operated strictly, without special reasons and protective measures, and live working is not allowed. Personal protective equipment should be used correctly during operation.
All electrical boxes are standard boxes, and the hanging height is1.4m. sundries are not allowed to be placed in front of and on both sides of the box1m. The door lock should be effective, the distribution box should be numbered uniformly, and there should be inspection and maintenance record cards, and repeated protection grounding should be done according to regulations.
The distance between mobile electrical boxes on each floor shall not be more than 30m, and one machine, one brake and one leakage protection shall be provided.
Single-phase electrical equipment is equipped with lighting switch box, which adopts single-phase three-wire system and is equipped with leakage protection switch. Mobile electrical appliances and lamps are made of wires with good insulation, without joints, damage and rolling.
Lighting with high light efficiency and long service life shall be used for on-site lighting, and high-pressure mercury lamp, high-pressure sodium lamp or mixed tungsten halogen lamp shall be used where large-area lighting is needed.
"Power supply", "lighting", "single-phase electrical appliances" and "welding" in each box should be clearly separated, and socket fuses should be used.
Pay attention to strengthen the inspection of electrical equipment in rainy season to prevent leakage accidents.
The project department shall conduct temporary electricity safety inspection at least once a week, and rectify the problems found in the inspection in time.
Summary of Safety and Civilized Construction Supervision 2 In the recent stage, the construction activities we are facing mainly include the installation of wallboard of absorption tower and the hoisting of box girder in the tower. The characteristics of safety management are: first, it is still in the flood season, and various preventive measures must be taken effectively; Second, with the progress of the project, aerial work is becoming more and more frequent, such as construction scaffolding, box girder hoisting and so on. At the same time, with the construction of adjacent areas, the situation of up-and-down cross operation has been formed on site. How to strengthen on-site coordination and effective isolation and protection is also a big challenge for daily management.
In view of the actual situation we are facing, we always regard safety as the top priority and weak link in all work, and insist on taking prevention as the focus and foothold of safety management. According to the overall requirements of the company's safe and civilized construction in the third quarter, in daily management, we further increased safety education and investment, and strengthened safety supervision and inspection and hidden danger investigation.
Summary of Safe and Civilized Construction in the First and Second Quarters
1. Adhere to people-oriented management and vigorously publicize the safety awareness of "paying attention to safety and caring for life"
We especially emphasized the concept of "safety is greater than the sky" and insisted that managers at all levels should further understand the extreme importance of doing a good job in safety production. In terms of staffing, there are two full-time safety supervisors and two part-time safety supervisors in our team, which effectively increases the intensity of on-site management.
At the weekly internal work meeting, carefully summarize and review the staged safety work, analyze and dissect the problems found in the rectification, learn and report the safety information obtained from the company and other interested parties, and make plans and arrangements for the next stage of work.
At the same time, in the daily supervision and inspection, we also pay great attention to the communication and communication with managers at all levels and team members in safety management, find incorrect understanding and unstable emotions in time, and take effective measures to correct and eliminate them.
2, adhere to the basic management work, and effectively improve the prevention and control ability.
In terms of safety education, safety education and written inspection were conducted for 12 new workers, certificates of 10 special operators were inspected, and four written safety technical disclosures were made. In terms of safety facilities, 2 differential self-locking devices, 26 fire extinguishers, 3 regional management signs and more than 30 safety signs were newly invested in the third quarter. At present, according to the actual configuration requirements, new fire-fighting equipment is being purchased again.
In terms of safety inspection, while accompanying the supervision company to carry out weekly special inspections, the daily supervision and inspection have been further strengthened. Among them, 4 written rectification notices were issued, and 2 work contact sheets were issued to make statistics on rectification matters. The completion rate of rectification is 100%.
In terms of heatstroke prevention and cooling, the absorption tower and the non-standard equipment production area are equipped with team lounges and sunshade measures, heatstroke prevention and cooling supplies are purchased and distributed in place, and there are special personnel responsible for the supply of pure water and mung bean soup on site.
3. Actively strengthen on-site coordination and management, and earnestly implement various safety management responsibilities.
In the on-site construction area, we have always adhered to the management requirements of fixed materials placement, creating conditions for closed management. However, with the development of civil engineering in the absorption tower area, the construction site presents a situation of cross-operation, which will inevitably continue in a short time. In view of this situation, we signed a written safety management agreement with the relevant construction units, which clarified the management responsibilities and obligations of both parties. At the same time, in order to further strengthen the self-management of the operation team and effectively eliminate the potential hidden dangers of vicious accidents such as falling objects and object strikes, we also signed a safety management agreement with our unit "Scaffolding Operation Team".
At the same time, with the progress of absorption tower construction, it is about to enter the internal anti-corrosion stage, and the safety management will face more significant challenges. In the next stage, we will continue to strictly follow the policy of "safety first, prevention first", further strengthen the connection and coordination of various processes on site, and earnestly implement various preventive measures to ensure that no safety accidents occur.
4, adhere to the safety management of mechanical equipment.
Adhere to the machinery and equipment as an important project of safety management, do a good job of self-examination and self-correction, effectively prevent the delay and completely eliminate all hidden dangers of accidents.
In the daily management, we have carried out inspection reports and relevant certificates for all special equipment used in the factory (including self-provided truck cranes, crawler cranes and other hoisting machinery temporarily rented on site), and timely repaired and maintained the defects in the use process. In terms of personnel certificates, all the special certificates of lifting, cables and commanders were strictly examined and sent for inspection as required when entering the site. During this period, the special personnel who re-examined the certificate also re-examined and sent for inspection as required. At the same time, we have also strengthened the daily inspection. For example, in the process of hoisting box beam of absorption tower, we mainly supervised and inspected the working environment and vehicle condition of crane, and discussed the construction scheme collectively with relevant personnel.
We have also taken various measures to prevent typhoons and prevent floods. For example, in view of the arrival of the No.8 super typhoon this year, the gantry crane in the non-standard equipment factory is reinforced with double cable wind ropes, and the absorption tower is reinforced with multi-cable wind ropes and 10t inverted chain. During the typhoon season, all personnel are evacuated, all electrical equipment is turned off, and the on-site duty personnel are in place to keep the information among emergency rescue personnel unblocked.
Second, the current main problems
At present, the main problems are as follows: first, some workers still have a weak sense of self-protection, and they are lucky and adventurous, such as climbing scaffolding without any protection; Second, the good work habit of doing things at any time and cleaning up at any time has not been fully developed, especially the construction waste left in the aerial work area, which has become a potential hidden danger for objects to strike accidents. At present, we are carrying out special rectification activities and continue to maintain the current good and stable construction situation.
Work plan for safe and civilized construction in the fourth quarter of 2003.
In the fourth quarter, we are not only in the critical period of construction operations such as wallboard installation, internal support beam installation and internal anti-corrosion, but also facing the situation of cross-operation with civil works, and the situation of safe and civilized construction is quite severe. In view of the above situation, we will focus on the following work:
1. Seriously organize the safety education, study and training of all employees, timely organize the study of the obtained company documents and safety information, and earnestly implement them. At the same time, we will continue to strengthen the inspection of the team's pre-shift meeting, urge the team's part-time safety officers to do a good job of pre-shift inspection and post-shift summary, and promote the transformation and consolidation of the "I want safety" consciousness.
2. Continue to do a good job in the monthly special safety inspection, especially focusing on the self-examination and self-correction of construction scaffolding, investment in safety facilities, crane maintenance and fire fighting equipment configuration. In strict accordance with the principle of "three decisions", the problems and deficiencies existing in the site are rectified and reviewed, effectively eliminating all hidden dangers of accidents.
3. Do a good job in reviewing the safety technical preventive measures for major and dangerous operation projects, strengthen the dynamic supervision and inspection before and during construction, and strictly implement the "safe construction work ticket" and other regulations in accordance with relevant requirements. Such as internal corrosion protection of absorption tower and hot work in dangerous areas.
4. Further strengthen fire safety management, especially the on-site storage and custody of curing agent and other materials used in anti-corrosion construction, actively communicate with relevant parties, delimit dangerous goods areas and conduct fixed-point management, and effectively strengthen the management of in-plant transportation and temporary storage.
5. Actively increase investment in safety facilities, such as differential self-locking devices and safety nets for aerial work, low-voltage isolators, exhaust devices and explosion-proof lamps for operation in containers, and delimit fire-forbidden areas for closed management. At the same time, in view of the cross-operation on site, increase the investment and daily maintenance of peripheral isolation and protection facilities, maintain daily communication with adjacent operation units, and ensure the smooth progress of various construction activities.
6. Actively cooperate with the daily management of the owner and the project supervisor, further strengthen the management of fixed materials and standardized behaviors in the construction area, create a safe working environment and construction conditions, and ensure the smooth progress of various construction activities.
Summary of Safety and Civilized Construction Supervision 3 With the increasingly fierce competition in the communication industry, China's communication construction enterprises are facing severe tests, and at the same time, it also welcomes new opportunities and challenges for China's engineering construction units to strengthen competition. Combined with the actual work of our company, we firmly grasp the idea of safety in production, take the Code of Safety in Production of Traffic Construction Engineering as the guide, conscientiously implement the Scientific Outlook on Development, adhere to the policy of "safety first, prevention first", and earnestly do a good job in safety in production of our company.
According to the work arrangement of Qingdao Telecom, our company held a safety production work meeting in time to convey and implement the spirit of Qingdao Telecom's safety production work meeting, conscientiously sum up and review our company's safety production work, deploy and formulate a new safety production work plan, take "safety first, prevention first" and "production must be safe and safe to promote production" as the guiding ideology, and earnestly do a good job in the company's safety production management. The work done by our company in safety production is summarized as follows.
First, improve the safety production rules and regulations and strengthen the safety production training for employees.
In order to make the awareness of safety in production deeply rooted in people's hearts and everyone establish the idea of "safety first, prevention first", our company has continuously established and improved the safety education system, carried out safety education regularly or irregularly, strengthened the safety training and education of employees, enhanced their safety awareness and safety protection ability, and effectively made employees establish safety awareness for a long time, gradually forming a good situation in which major issues are attached importance to safety, safety is considered everywhere in work, and safety is guaranteed everywhere. The details are as follows:
1, employees receive safety training and education on a regular basis, and adhere to the system of training before taking up their posts. The training contents include safety operation procedures, accident case analysis, labor discipline, etc.
2, rational use of labor insurance supplies, strengthen labor protection, in accordance with the provisions, timely purchase and distribution of various labor insurance supplies.
3, climbing and electrician and other special industries must hold relevant certificates.
4. Regularly inspect, repair and maintain all kinds of equipment and tools. When purchasing equipment, check and accept in strict accordance with relevant procedures to ensure that the equipment is in good condition.
Second, establish various emergency plans of the unit to ensure safety in production.
In order to ensure the smooth implementation of various emergency plans, our company has supplemented and improved various emergency plans, making the emergency plans closer to reality, more practical and more operable. A number of emergency plans, such as Emergency Plan for Fire Fighting (Extinguishing), Emergency Plan for Traffic Accidents, and Emergency Plan for On-the-spot Injury, have been formulated and communicated to each employee, and detailed plan drills have been made.
Third, establish a responsibility system for production safety
According to the principle of "managing production must manage safety", the responsibility system for safety in production is implemented, each employee is responsible for the safety in production of his post, and the system of commitment letter for safety in production for all employees is implemented to form an all-round and graded safety production responsibility management network. Strict implementation of safety production management regulations, so that the responsibility is clear and the assessment is carried out to people. In the daily safety production management, we should strive to organize, take responsibility, check, assess, reward and punishment. At work, our company attaches great importance to the management of safety production, and every time we organize the spirit of the document on strengthening safety production, we organize our employees to study and implement it in time. Unsafe factors should be discovered, reported and solved as soon as possible, and safety precautions should be done in a down-to-earth manner.
Four, to carry out safety inspection and self correction.
Combined with the actual situation of our company, our company regularly or irregularly carries out self-inspection and self-correction activities for safety production. According to different periods and seasons, we should conscientiously do a good job in self-examination and self-correction of production safety. Arrange supervisors at the construction site to supervise and inspect the construction quality, safety and fire control.
Verb (abbreviation of verb) Vehicle safety management.
In view of the huge number of vehicles, the company calls drivers for safety study at least once a month. Implement the system of three inspections a day, and regularly check the lights, steering, brakes, wipers and oil of all vehicles of the company. Strengthen vehicle management, strictly abide by vehicle management regulations, achieve three inspection systems before driving, during operation and after receiving the car, do not drive luxury cars, take taxis, and do not drink and drive, so as to prevent man-made accidents.
Six, office, warehouse, communication key area safety management.
Office, warehouse reasonable allocation of fire equipment, regular maintenance of fire equipment, strengthen the safety of key departments such as warehouse, put an end to fire hazards. Strengthen employee safety education, and prohibit drinking water, smoking and naked fire construction in key areas such as warehouses and communication rooms to prevent safety and communication accidents.
In a word, safety in production is very important. In the future work, the company will continue to take safety in production as the top priority while constantly improving the system and strengthening management, carefully find out the problems, earnestly implement them, resolutely put an end to all kinds of accidents, and earnestly achieve "safety in production, prevention first".
Summary of Safety and Civilized Construction Supervision 4 According to my one-year safety work and the characteristics of beijing subway changping line construction, talk about my own feelings. The highlights of Changping Line subway are as follows:
I. On-site safety production management
(A) safety supervision team building
During the peak period, a 35-person safety supervision brigade will be set up, with the project manager personally as the team leader. Team members will be equipped with walkie-talkies, armbands, logs, safety production standardization manuals, special safety helmets and numbers, 200 yuan safety allowance, site safety responsibility card (name, photo, number and telephone number of the responsible person), safety officer files and regular assessment training.
(2) Safety management of subcontracting teams
Labor subcontracting teams and professional subcontracting teams should be selected from qualified subcontracting units determined by enterprise evaluation. After entering the construction site, check the original business license, qualification certificate, safety production license, safety production assessment certificate of the person in charge, and operation certificate of special operations personnel of the subcontracting team and keep a copy; Sign subcontracts and safety production management agreements to clarify the safety responsibilities of both parties.
(3) Safety management of equipment leasing and use
1. One-time filing: collect the filing procedures of the property right unit.
2. Two files and two drawings: complete safety technical files.
The two documents refer to the technical documents (established by the property right unit) and the demolition documents (established by the demolition unit), and the specific contents are as follows:
Technical files shall include the following information:
(a) the purchase and sale contract, manufacturing license, product certificate, special equipment manufacturing supervision and inspection, installation instructions, property units in the industrial and commercial registration and other original materials;
(two) regular inspection reports, regular self-inspection records, regular maintenance records, maintenance and technical transformation records, operation failures and production safety accidents records, cumulative operation records and other operational data;
(3) Previous installation acceptance data.
The installation file shall include the following information:
(1) Installation and disassembly contract and safety agreement;
(2) Special construction of installation and disassembly works;
(3) Relevant information on technical disclosure of safety construction;
(4) Acceptance data of installation works;
(5) Emergency rescue plan for production safety accidents in installation and disassembly engineering.
This plan is in duplicate, which refers to the emergency rescue plan for production safety accidents of dismantling units and the emergency rescue plan for production safety accidents of using units.
Three tables:
The first is to check the form. After the installation of construction hoisting machinery is completed, the relevant units such as rental, installation and supervision shall be organized for acceptance, or inspection and testing institutions with corresponding qualifications shall be entrusted for acceptance. Before acceptance, inspection shall be conducted by an inspection agency with corresponding qualifications. After acceptance, fill in the corresponding records and sign them by the relevant person in charge.
2. Application Form: The demolition unit shall submit the special construction plan, the list of installation and demolition personnel, the installation and demolition time and other materials to the general construction contractor and the supervision unit for review two working days ago, and then notify the competent construction department of the local people's government at or above the county level where the project is located (at present, it mainly refers to tower cranes, construction elevators and material hoists).
III. Usage Form: Within 30 days from the date of acceptance of construction hoisting machinery installation, the acceptance data of construction hoisting machinery installation, the safety management system of construction hoisting machinery, the list of special operators, etc. , shall be registered with the construction administrative department of the local people's government at or above the county level where the project is located. The registration mark is placed or affixed to the prominent position of the equipment.
Second, production safety education and training
(a) Night schools for migrant workers
A "night school for migrant workers" was built on the construction site, with an area of 100 square meter. Night school has necessary teaching equipment, such as TV and video recorder. Organize the training and education of migrant workers in construction subcontractors and labor subcontractors regularly every month. Each migrant worker has no less than 2 training sessions per month (4 class hours).
The training contents mainly include: guidelines, policies, laws and regulations on safety production formulated by the state, provinces, cities and relevant departments; Standards and specifications related to construction site safety management of construction projects and documents related to standardization of construction safety management; Safety production management, safety production technology and occupational health knowledge; Typical accident and emergency rescue case analysis; Safety knowledge manual and fire safety knowledge of operators in Beijing construction site.
(2) Three-level education for new employees.
After the third-level education, after the examination, the District Construction Committee will sort out and summarize the relevant information (name, ID number, test scores) of the qualified persons, and report the electronic version and text information (stamped with the official seal of the security office and the station) to the Construction Safety Management Office of the Municipal Construction Committee, which will be handed over to the construction management service center after the examination, and the training and examination information will be recorded in the safety card.
(three) special operations personnel related certificates
1. Electrician, welder, scaffolder, lifting operator, etc. Special operations personnel must obtain the qualification certificate issued by the relevant competent department before taking up their posts. The certificate that has not been rechecked as required shall be invalid and submitted to the supervisor for review and filing, and the code and original storage location shall be indicated on the certificate.
2. Dynamically manage the list of special operators, identify the transferred personnel in time, and take back their special operation certificates in time to ensure consistency with the actual operators on site.
(four) adhere to the safety technical disclosure and other pre-shift safety activities and safety civilization construction publicity closely follow the operation surface.
Third, the safety special plan organization expert demonstration
For the special construction scheme involving deep foundation pit, underground excavation engineering and tall formwork engineering, it is necessary to organize experts to demonstrate and review before organizing construction.
Four, the construction site major hazard management and risk control
On-site publicity and dynamic management of existing hazard sources, emergency materials follow the operation surface, and insist on monitoring, measurement and inspection. Extremely high: as the key control object, make plans to implement control.
G: we can't start work until the risk is reduced. In order to reduce risks, it is sometimes necessary to allocate a lot of resources. Take emergency measures when risks involve ongoing work. Formulate control measures in plans and rules and regulations, and implement control over them.
China people: Try to reduce risks, but carefully measure and limit the cost of prevention, and carry out prevention and control within the scope of rules and regulations.
Low: it means that the risk is reduced to a reasonable and feasible level, and no additional control measures are needed at the lowest level. Considering the solution with better investment effect or the improvement measures without increasing the cost, monitoring is needed to ensure that the control measures are maintained.
Verb (abbreviation for verb) security check
Mainly check the following contents: check ideas, check systems, check management, check leaders, check violations, check hidden dangers and check records. During the dry season, the leadership night patrol system is implemented.
Forms of safety inspection: regular safety inspection, seasonal safety inspection, temporary safety inspection, holiday safety inspection, special safety inspection, mass safety inspection, etc.
The contents of inspection records include: on-site safety production evaluation, problems found, hidden dangers of accidents, etc. ; Hidden dangers found in the inspection can be rectified immediately; If it cannot be rectified immediately, a notice of rectification of hidden dangers can be issued in time; Establish an account of registration, rectification and review records; Formulate rectification plans; The rectification shall be carried out in accordance with the principles of fixed personnel, fixed time, fixed measures and fixed funds; Before the hidden dangers are eliminated, the responsible person and the supervisor must carry out rectification.
Summary of safety and civilized construction supervision 5 1. Establish emergency management leading institutions and strengthen work responsibilities.
A special agency was set up to take charge of emergency work, formulate emergency plans, and gradually formed an emergency management system with hierarchical responsibility and compartmentalization.
Two, gradually improve the emergency plan system, clear work measures.
Focusing on the characteristics of emergencies, carefully study the occurrence and development law of emergencies, strengthen the preparation, revision and improvement of emergency plans, continuously improve the rationality and operability of plans, and clarify work measures. From emergency command, emergency response, the specific division of labor of each department to the specific handling of the operation team, we have formulated detailed and specific work measures and defined the specific tasks and working methods of each department. The emergency work of this project has also been carefully arranged, and the masses have been mobilized to promote the standardization, institutionalization and proceduralization of emergency management. Do a good job in information reporting of emergencies. Adhere to the 24-hour duty system on holidays, conscientiously do a good job in daily duty, further improve the efficiency and quality of information submission, and strictly implement the reporting system.
The third is to strengthen the construction of emergency rescue teams and organize emergency rescue drills.
At present, the project department has formulated corresponding plans and emergency teams. Carry out regular assessment and analysis to improve emergency work ability. In order to improve the ability to deal with emergencies and sum up work experience, the safety accidents in production are carefully analyzed and summarized, the safety in production in construction is generally evaluated, and practical work measures are put forward for future work.
Four, the preparation and implementation of emergency rescue plan, organize accident rescue drills.
According to the safety production work plan of this project, the safety production management on the construction site will be carried out in an orderly manner, and the emergency rescue plan for safety accidents, accident reporting system and safety work inspection system will be further compiled and implemented. According to the emergency rescue plan, emergency rescue simulation drills are carried out regularly, and the problems existing in each drill are tracked, rectified and implemented, which lays a good foundation for the start of emergency plan and emergency treatment.
Five, pay special attention to safety in production, and earnestly carry out special activities for the investigation of engineering safety hazards.
In the investigation of potential safety hazards, the outstanding problems should be rectified within a time limit. Regular inspection of the construction site has eliminated hidden dangers in time and received good publicity and warning effects.
Six, the problems existing in emergency rescue management.
First, individual departments lack actual combat experience and delay the opportunity.
Second, the non-specialization of the emergency rescue team affects the rescue work.
Seven. 20XX work plan
1, further improve the preparation of emergency rescue plan, and gradually form a standardized standard system for accident prevention and emergency rescue in production safety.
2. Further strengthen the self-construction of the emergency rescue team, strengthen the quality education of the team and improve the actual combat capability of the team.
3, through various effective ways, increase publicity, popularize the knowledge of production safety accident prevention and emergency rescue, improve the rescue ability of employees, and enhance the awareness of safety prevention and the ability to deal with safety accidents.
4. Strengthen the construction of emergency rescue teams, organize emergency rescue drills on a regular basis, and constantly improve the emergency handling capacity of emergency rescue teams.