Current location - Training Enrollment Network - Education and training - Exterior wall design filing process Exterior wall design filing
Exterior wall design filing process Exterior wall design filing
What information do you need for building energy conservation filing?

1, building energy-saving special acceptance record in triplicate;

2, building energy-saving design review record;

3, roofing, exterior wall insulation materials for the record, in sampling test report;

4, doors and windows for the record, in sampling inspection report;

5, exterior wall, partition, partition material registration certificate, in sampling test report;

6, building energy-saving products (materials) witness sampling list and supervision engineer on-site supervision records and engineering site supervision records.

Science engineer building energy saving training certificate;

7. Public buildings need to provide registration certificates for heating, air conditioning systems and other equipment;

8, the unit project site inspection report.

External wall insulation filing process?

To go to ministry of materials and equipment, the Provincial Construction Department, you need the following information:

1, business license;

2, product implementation standards and provincial and above type inspection report;

3, product identification (identification of scientific and technological achievements, technical evaluation) certificate;

4, product description, construction methods, inspection or acceptance methods, etc.

To apply for the use of building materials and equipment for the record, the following products need to provide special certificates or inspection reports.

1. Production license is required: building external windows, aluminum alloy profiles, waterproof coiled materials.

2. Need to provide special equipment manufacturing license: construction hoisting machinery and equipment (tower crane, construction elevator).

3. Need to provide hygiene license: building water supply pipes and fittings.

4. Need to provide 3C certification: building low-voltage distribution box, wire and cable, building water supply equipment (including water pump) and concrete antifreeze.

5. Need to provide metrological verification certificates: heat meter and temperature control valve.

6. Need to provide sanitary performance test report: building water supply pipeline and fittings.

7. Need to provide indoor toxic and harmful substances limit test report: building interior wall paint and building adhesive.

8. Inspection report on ammonia release: concrete admixture.

9. External wall thermal insulation system: it is mainly the interface agent (mortar) manufacturer, which provides the weather resistance test of the system.

Is it necessary to declare for the record the construction of external wall curtain wall?

First of all, the construction blueprint of curtain wall needs to be submitted to the drawing center for drawing review and obtain the drawing review certificate; Curtain wall construction contract needs to be filed in the bidding office of the Construction Bureau; Then go to the quality and safety supervision station of the Construction Bureau to handle the quality and safety supervision procedures for curtain wall projects; Finally, go to the Construction Bureau to handle the curtain wall project construction permit. Materials required for handling the construction permit:

1, construction permit application form (one original);

2, the power of attorney of the construction unit (original);

3, the construction unit business license and organization code certificate (copy);

4, project approval (copy);

5. Land use certificate (for projects that do not need to be provided, the project legal person property right certificate or valid house lease contract should be provided) (copy);

6, the construction project planning permit (copy);

7, the general plan of the construction project (original);

8, construction drawing design review certificate (copy);

9, according to the law shall be subject to the fire control institutions of public security organs for fire design audit of construction projects, submit the "building fire design audit opinion" (copy); For other construction projects, submit the Contact Sheet for Fire Protection Design of Construction Projects issued by the fire control institutions of public security organs (original);

10, bid-winning notice (copy) and bidding contract data filing form (original) or direct contract filing book (copy);

1 1, registered construction contract (original);

12, Notice on Quality and Safety Supervision of Construction Project (original);

13, registered construction project entrusted supervision contract (original);

14, proof of funds provided: (1), the construction unit has no commitment to default on the project payment; (2) Proof of funds: the construction unit shall issue a bank statement (for one-year projects, it is required to prove that the funds have reached 50% of the contract cost, and for projects over one year, it is required to prove that the funds have reached 30% of the contract cost).

Should the exterior wall paint on the construction site be put on record?

First, report in advance.

All construction units shall report to the Security Affairs Center of the District Housing and Urban-Rural Construction Committee 3 days before the construction of exterior wall coatings.

Second, clear the construction standard of volatile organic compounds emission on the construction site.

(1) All exterior wall decoration and painting materials of the projects under construction must use water-based coatings that meet the Technical Requirements for Environmental Labeling Products (HJ/T20 1-2005);

(two) the construction site must be equipped with a closed building paint storage and deployment places; Adhesives and architectural coating solvents must be sealed and stored, and abandoned containers shall not be piled up in the open air.

(three) prohibit all kinds of construction site pipelines and facilities in the open air and open-air spraying and painting operations.

What information do you need for the construction permit for external wall reconstruction?

First, what information is needed to apply for a construction permit?

Submit:

1, housing construction projects, the applicant shall submit the following application materials:

(1) Completed and stamped building construction permits Application Form in triplicate;

2) The original construction project planning permit and a copy of its attachments;

(3) a copy of the approval procedures for land use (state-owned land use certificate or relevant approval documents);

(4) The original notice of review of construction drawing design documents;

(5) Construction contract filing form issued by the bidding management department;

(6) Supervision contract filing form issued by the bidding management department (submitted for projects that should be entrusted to supervision according to law);

(7) The safety production assessment certificate of the safety production management personnel of the construction enterprise (Grade B and C) and the original of the Data Handover Form for Underground Pipelines and Buildings (Form AQ-A-2) (for the record of construction safety supervision);

(8) the original proof of the implementation of the project construction funds;

(9) the civil air defense construction drawing filing receipt issued by the civil air defense department;

(10) power of attorney of legal person;

(1 1) Classification Registration Form of Beijing Building Energy Efficiency Design Review (in triplicate).

2 to apply for municipal infrastructure projects, the applicant shall submit the following application materials:

(1) Completed and stamped building construction permits Application Form in triplicate;

(2) A copy of the original construction project planning permit and its attachments;

(3) The original notice of review of construction drawing design documents;

(4) Construction contract filing form issued by the bidding management department;

(5) Supervision contract filing form issued by the bidding management department (submitted for projects that should be entrusted with supervision according to law);

(6) The safety production assessment certificate of the safety production management personnel of the construction enterprise (Grade B and C) and the original of the Data Handover Form for Underground Pipelines and Buildings (Form AQ-A-2) (for the record of construction safety supervision);

(7) Original certificate of implementation of project construction funds;

(8) Permission procedures for digging and occupying roads (digging and occupying roads need to be handled);

(9) Power of attorney of legal person.

3, decoration engineering applicants should submit the following application materials:

(1) Completed and stamped building construction permits Application Form in triplicate;

(2) The original construction project planning permit and a copy of its annex (submitted only when the facade is renovated);

(3) a copy of the property right certificate (a copy of the lease agreement and a certificate of consent to decoration issued by the property owner are required for renting the house);

(4) Construction contract filing form issued by the bidding management department;

(5) Supervision contract filing form issued by the bidding management department (submitted for projects that should be entrusted with supervision according to law);

(6) The original (copies B and C) of the safety production assessment certificate of the safety production management personnel of the construction enterprise (the construction safety supervision shall be filed and returned to the applicant after verification);

(7) Original certificate of implementation of project construction funds;

(8) Power of attorney of legal person.