Current location - Training Enrollment Network - Education and training - Monthly safety production activity plan of mechanical maintenance workshop
Monthly safety production activity plan of mechanical maintenance workshop
In order to ensure the effective implementation of activities, it is often necessary to make an excellent activity plan in advance, which is a written plan for specific activities to be carried out. So what problems should we pay attention to when making an activity plan? The following is the monthly workshop activity plan for safe production (5 general articles) I compiled for you, hoping to help you.

Monthly activity plan of machine maintenance workshop for safety production 1 In order to further implement the company's main responsibility of environmental protection in safety production, strengthen safety and environmental protection management, improve the safety and environmental protection awareness of all employees, and achieve safe and stable development, the electric instrument workshop continues to take "anti-violation, hidden danger detection, management and skill improvement" as the main line of safety work throughout the year, pay close attention to improving employees' skills, strictly control all kinds of safety production accidents, and ensure the smooth completion of various safety work objectives in the workshop in 20XX.

First, the purpose of training:

According to the company's safety and environmental protection education and training needs, combined with the company's safety production situation, strengthen the concept of "safety first", carry out safety and environmental protection training and education around 20XX safety work, further improve the safety production prevention awareness of all employees, enhance the risk prevention and control ability, reduce unsafe behaviors of people, unsafe conditions of materials and management defects, promote the improvement of environmental protection management level of safety production in the whole workshop, enhance the ability of accident prevention, occupational hazard prevention and emergency treatment, and reduce environmental accidents in safety production.

Second, the organization and leadership:

A leading group was set up in the electrical instrument workshop to carry out in-depth safety training activities and comprehensively organize, coordinate and guide the comprehensive development of safety training.

Team leader:

Deputy team leader:

Members:

Third, the basic idea:

(a) to strengthen the safety awareness education of "safety first, prevention first". Safety awareness education is to help employees correct matters and improve their understanding of the importance of safety production through in-depth and meticulous ideological work. On the basis of improving ideological understanding, correctly understand and actively implement relevant safety production rules and regulations, strengthen self-protection awareness, do not violate rules and regulations, do not violate labor discipline, and achieve "four no injuries": do not hurt yourself, others, and others.

At the same time, managers at all levels should also strengthen safety education, ensure that they play a leading role in their work, attach importance to safety production from the perspective of caring for people and life and health, and do not command in violation of regulations.

(two) the safety education throughout the whole process of production, enhance the enthusiasm of all staff to participate and the long-term safety education. Realize "all-round, all-round and whole process" safety education. Because production and safety are inseparable unity, where there is production, safety education is needed.

(three) to carry out various channels and forms of safety education. The forms of safety education should be adapted to local conditions, different from person to person, flexible and diverse, and try to adopt interesting, cognitive and acceptable ways. According to the specific situation of our company, the forms of safety education mainly include the following aspects:

(1) Meeting format. It mainly includes: safety knowledge lectures, safety group activities, reports, pre-shift and post-shift meetings, and on-site meetings on accident lessons.

(2) suspension form. It mainly includes: safety publicity banners, slogans, signs, pictures, safety publicity boards and newspapers.

(3) Audio-visual products. Mainly includes: safety education CD, safety lecture video, etc.

(4) Field observation and demonstration. It mainly includes: demonstration of safe operation method, fire drill, demonstration of electric shock first aid method, etc.

(4) Strictly implement the company's three-level safety education system, and put an end to the phenomenon of directly taking posts without three-level safety education. For new employees and new workers entering the factory, we should strictly require three-level safety education (including factory-level, workshop-level and team-level safety education). The study contents include safety technical knowledge, equipment performance, operating rules, safety system and prohibited items, and only after passing the examination can they enter the operating post. The examination situation should be recorded, and the time of level 3 safety education should be no less than 24 hours.

Fourth, the job requirements

1. The specific training plan shall be worked out one month before the training, submitted to the leaders for approval, and the relevant personnel involved in the training shall be informed to make timely preparations.

2. After the training, make a comprehensive summary of the training effect.

3, can't hold safety training and education activities on schedule, to timely report to the superior, explain the specific time and reason.

4. At the end of the year, write a summary report on the annual training and education activities, put forward the shortcomings of this year's training and the aspects that should be paid attention to in future education, and make a safety training and education plan for next year.

The safety production activity plan of the monthly machine maintenance workshop is to further strengthen safety management and ensure safety production in the fourth quarter. This plan is specially formulated according to the document spirit of the company's safety and environmental protection department and the actual situation of this workshop:

I. Organization:

Group length:

Members:

Second, the schedule:

1, Phase I: (101October 28th -3 1)

The first stage is the detailed plan and mobilization deployment stage. Each team should do a good job of mobilization and deployment according to the actual situation of the team and the implementation plan of internal safety inspection.

2. Phase II: (165438+1October1-165438+1October 25th)

The second stage is the stage of introspection, self-improvement and key promotion. Each team should conduct a comprehensive and meticulous hidden danger investigation one by one. Workshop safety management personnel should manage the safety of each team, carefully record the investigation process, register the hidden dangers found, and clearly implement the time limit, specific person in charge and safety precautions one by one. Major hidden dangers should be reported to HSE department immediately and emergency plans should be made.

Check content:

(1) Implement responsibilities at different levels and increase the control of hidden dangers.

In accordance with the principle of "taking overall responsibility, whoever is in charge is responsible", we will implement management responsibilities at all levels, refine post personnel, increase the management and control of hidden dangers, follow up and rectify, and grasp it to the end.

2. Safety inspection of production boilers and small boilers.

(1) Workshop personnel should regularly check the production boilers and small boilers, and rectify the problems found as soon as possible to ensure their safe operation.

(2) The operator shall carefully check the safety accessories every day and make records.

(3) Strengthen the safety management of limited space.

Boiler and water treatment team should strictly implement the limited space operation system.

(4) Strengthen fire prevention management in winter.

(1) Strictly implement the regulations on hot work management. All operations involving fire and explosion places must strictly implement the hot work approval system, and safety management personnel should strengthen the on-site supervision of hot work safety measures.

(2) Seriously implement the fire ban system. Flammable and explosive areas should implement the fire ban system, strengthen management, and deal with violations seriously.

(3) Check the fire control management system, configure fire control facilities and equipment according to the standard, and make them complete and easy to use. Workers in posts should be able to use fire control equipment.

5] Strengthen the safe driving management of transport vehicles.

① Carry out winter driving safety education extensively, strictly implement the company's traffic system, control the motorcycle speed (20Km/h), and prohibit driving with people.

② When driving on icy roads, be sure to control the speed.

[6] Strengthen the safety management of electrical facilities.

Check the electrical wiring in the workshop and the wiring within the jurisdiction, which must meet the standard requirements. It is forbidden to overload electrical equipment and lines, and it is forbidden to use electric furnaces and electric heating pipes to heat and cook.

(7) Strengthen training management and guide practice with theory.

Check the safety education of employees, analyze the accident cases of this position and related positions through safety training, accident discussion and on-site explanation, draw lessons from accidents, and improve safety skills, operation skills and self-prevention ability.

Being to strengthen the control of special equipment, to ensure safe operation.

Special operations personnel must hold relevant certificates.

(9) Do a good job in environmental management and water pollution control.

Each team should manage all kinds of oils and wastes to prevent pollution accidents. Relevant departments should keep abreast of the pollution situation in water treatment.

3. Stage III: (165438+1October 26th-65438+February 5th)

At this stage, in order to consolidate the improvement, rectification and acceptance stages, the hidden dangers identified should be rectified and cancelled one by one, and the management loopholes and equipment defects found and exposed should be revised and improved one by one, and safety measures should be formulated. During this period, the HSE Department is responsible for organizing and inspecting the implementation of this activity, summing up experiences and lessons, and forming written materials to report to the Group Company.

Third, the requirements:

1, strengthen organization and leadership, and set up special inspection leading institutions. This inspection is conducted in the form of self-inspection first and supervision and inspection by the HSE department.

2. The problems identified by each team will not be evaluated after rectification within a time limit; Problems found in professional inspection teams and company inspections should be evaluated; If the rectification is not completed within the time limit, the assessment will be doubled.

Safety production monthly mechanical maintenance workshop activity plan. For the next step of safety management, the factory revised the relevant management system, and the requirements will become more and more strict. The workshop will also be managed in strict accordance with the relevant requirements. In order to promote the overall management of the workshop and the relevant management regulations of the factory in an efficient and orderly manner, this scheme is specially formulated. This scheme is suitable for titanium tetrachloride production workshop.

I. Purpose

In order to prevent and reduce accidents in our workshop, ensure the orderly progress of workshop safety work and the safety of employees' lives and property, strengthen and implement the main responsibility of safety, establish and improve the long-term mechanism of workshop safety management, and realize the safety management work with the safety work policy of "people-oriented, insisting on safety development, insisting on safety first, prevention first and comprehensive management".

Second, team members

Aston Casadin Audi Adi Lose Weight Audi La Express Fee

Third, job responsibilities and implementation

Each member shall supervise the safety of the workshop staff, record the three violations of the workshop staff, report to angel lee at the end of each month, and make statistics on the violators and violations. The workshop will punish the number of violations in turn according to the workshop safety management regulations and the factory department's anti-three violations assessment method.

Fourth, the assessment of team members.

Workshop staff not only supervise employees, but also supervise workshop managers, and make records and report to workshop director Chen Liangfu. After verification, the punishment will be doubled on the basis of the employees, and the amount of punishment will be rewarded to the whistleblower.

Activity Plan for Safety in Production of Monthly Machine Repair Workshop 4 In order to fully implement the Law on Safety in Production and the Regulations on Safety in Production in Bole City, and effectively strengthen the safety in production in our workshop for 20XX years, this implementation plan is specially formulated according to the Assessment Method of One-vote Rejection System for Safety in Production in Xingguo County.

I. Guiding ideology and general requirements

Adhere to scientific and safe development, adhere to safety first, prevention first, comprehensive management, fully implement the safety production law, fully implement the responsibility system for safety production, strengthen the main responsibility of enterprises for safety production, improve the safety production supervision system, increase investment, lay a solid foundation, deepen rectification, strengthen supervision, and strictly enforce the law, so that safety production will gradually move towards the track of legalization, standardization and institutionalization, and resolutely put an end to serious accidents. Curb the general accidents from the secretary desk in this paper, strive to achieve the safety production control index issued by the superior, promote the further stable improvement of the safety production situation in the industrial silk workshop, and constantly create a new situation of safety production.

II. Objectives and tasks

1, resolutely put an end to all kinds of serious accidents and fatal accidents caused by potential safety hazards in the workshop. Fully realize the safety production control index of our county issued by the superior.

2. Further implement the responsibility system for production safety, ensure the workshop's investment in production safety, establish and improve the production supervision and management institutions in the safety team, and resolutely put an end to the phenomenon of pipe leakage in various positions and high-risk places.

3, strictly implement the main responsibility of enterprise safety production management. Steadily promote the construction of occupational safety and health management system, prevent and control occupational diseases, and ensure the health and safety of employees.

4. Strengthen the training of safety production management personnel, special operators (part-time) and employees in various positions to ensure that the training rate reaches 100.

5, continue to deepen the high temperature and high pressure dangerous chemicals biphenyl, nitrogen; Special equipment drafting winding machine, electric wire cutting machine, traveling crane, electric hoist; Fire prevention and other safety special rectification. There is no illegal operation equipment, illegal operation, unlicensed operation and unlicensed temporary construction in the workshop.

6. Do a good job in fire prevention of SSP spinning building to avoid fire accidents.

7. Further improve the county's emergency rescue system for serious accidents, standardize the management of safety production information, and timely and accurately report safety production information, and shall not conceal, omit, falsely report or delay reporting.

Third, the main measures

(A) to strengthen work leadership, the implementation of work responsibilities.

1, comprehensively strengthen the leadership of work safety. Safety production should be included in the development planning of workshops and teams. All effective measures should be taken to ensure the investment in safety production and ensure the normal development of various safety production work. The main leaders should preside over a special meeting on safety production, personally study and deploy safety production work, solve outstanding problems in safety production work, and earnestly strengthen leadership over various safety production work.

2. Implement the dual responsibility system of "territorial management" and "post management". Fully implement the responsibility system for production safety, and implement the responsibility for production safety to teams and individuals. Safety production should be regarded as an important part of team assessment, and the assessment results should be included in the ten-star team assessment.

3, strict production safety work annual target management system. Conduct double assessment according to the double responsibility system, commend and reward the advanced teams that have achieved the annual safety work goals, and implement one-vote veto and economic punishment for the teams that fail to meet the assessment standards.

At the beginning of the year, each team must sign a responsibility letter for safety production with the workshop; And decompose the safety production indicators layer by layer, sign the responsibility book for safety work layer by layer, carefully organize the assessment, and strictly honor the rewards and punishments.

4. Comprehensively strengthen the construction of safety supervision institutions. Each team should be equipped with more than one full-time safety supervisor, establish a set of perfect daily work system and work files, and allocate certain special funds for safety supervision to ensure normal operation and strong supervision.

(2) Strengthen daily supervision and pay close attention to the investigation of hidden dangers.

1, strictly abide by the safety licensing system for high-risk industries, and strictly control the source and access. Ensure that the registration rate reaches 100.

2. Strictly implement the "daily inspection" system. Each team must conduct a safety inspection once a day. For all kinds of problems and hidden dangers found in safety inspection, the secretary desk should make on-site inspection records, and issue rectification notices on the spot, and urge those responsible for rectification to seriously implement rectification measures and make rectification in place within a time limit. Once the hidden danger of serious accidents is found, it should be reported immediately, and measures should be taken immediately, and the company should be informed in writing within 24 hours. At the same time, we will strictly implement the monitoring system of "keeping people on duty and meeting each other every day". Before every Tuesday, each team will report the safety inspection of the team and the major hidden dangers and treatment measures to the workshop safety officer in writing.

3. Further deepen the special rectification of safety production and strengthen the rectification of hidden dangers. Adhere to the provisions of no smoking and no fatigue in the workshop, fulfill the obligations of wearing labor protection articles and fire safety, and take the special rectification of safety production as an important task to rectify and standardize the quality management of the workshop, and make unremitting efforts to do a good job. It is necessary to effectively strengthen the rectification of hidden dangers in special rectification, establish a responsibility mechanism for rectification of hidden dangers, and ensure that the rectification work is effective.

(3) Strengthen the foundation and fully implement the team's main responsibility.

1. Gradually promote the credit rating management system of the security team and establish the production assessment management mechanism of the security team. Gradually promote safety and quality standardization activities in winding, spinning, feeding and packaging, and bring safety and quality behaviors in all aspects, links and processes into institutionalized management. Effectively increase the safety supervision of low-level safety reputation responsibility teams and individuals.

2. Vigorously promote the construction of occupational safety and health management system, effectively prevent and control occupational diseases, and ensure the health and safety of employees. Every team and individual has the obligation to wear labor protection articles according to regulations, take practical and effective measures to prevent and control occupational diseases, and gradually eliminate occupational hazards by paying attention to their own behaviors in their daily work.

(four) to increase publicity and education and training, and create a strong atmosphere of safety in production.

1, to further strengthen the publicity and education of production safety. Enhance employees' safety awareness, self-protection and escape ability, and strive to create a good atmosphere of law-abiding and safe production.

2, strengthen the supervision of special operations personnel. Ensure that the certificate-holding rate of special operations personnel reaches 100.

Monthly Safety Production Activity Plan of Machine Maintenance Workshop 5 I. Purpose

With the arrival of summer, the weather temperature rises gradually. In order to do a good job of safe production in summer, combined with the production characteristics of the workshop, the work plan is formulated to effectively implement the four prevention work in summer, with the focus on "lightning protection, flood control, explosion prevention and heatstroke prevention" to ensure the safe, stable and efficient operation of the production device in high temperature weather in summer.

Two, the chemical workshop in summer "four prevention" leading group:

Group length:

Deputy team leader:

Members: team leaders and safety officers of each team.

Third, the job requirements:

1. The workshop is led by the workshop director every month, with the participation of management personnel above the workshop leader. In summer, each working procedure and each team shall be inspected twice for "Four Preventions" safety, in strict accordance with the contents of the workshop checklist, and the inspection records shall be kept.

2. Each working procedure and team in the workshop shall be carried out in strict accordance with the plan and measures of four prevention in summer, and the inspection contents of four prevention in summer shall be included in the daily patrol inspection of the team, and relevant records shall be made.

3, each shift post operators in the daily production process found hidden dangers and production process index deviation, should immediately notify the workshop management and monitor, management and monitor immediately organize personnel to deal with, at the same time notify the company scheduling, workshop director and request coordination.

4. Workshop safety personnel should strengthen the training of summer four prevention knowledge for personnel. The workshop shall organize workshop-level emergency drill safety activities at least once a month, and the team shall organize emergency drill safety activities at least once a month.

Four, chemical workshop four prevention measures in summer:

(1) Lightning protection measures:

1. Workshop equipment personnel should contact the operation and maintenance workshop to test the lightning protection grounding and electrostatic grounding devices of relevant production devices, to ensure that the lightning protection grounding and electrostatic grounding devices are in good condition, and to ensure that the production devices, equipment and buildings in the workshop can cope with abnormal weather such as lightning. Especially for buildings (structures) with high height within the battery limit (such as benzene washing tower, ammonia washing tower, desulfurization tower, ammonia steaming tower, benzene removing tower, lime furnace, etc.), corresponding test accounts must be established.

2, workshop safety personnel according to the demand of lightning protection knowledge, organize the workshop personnel to carry out relevant knowledge training, strengthen their own lightning protection theory knowledge and lightning protection skills, to ensure self-protection in lightning weather.

3. The staff of each shift in the workshop should strictly check the electrostatic grounding of each pump and motor and the grounding device of each tower according to the four prevention inspection records formulated by the workshop, and make records carefully to be serious, timely and accurate.

4. Ask each team to hold a billboard activity with the theme of "Four Preventions in Summer" in the "Workers' Home" in June, and publicize the blackboard newspaper.

(2) Flood control measures:

1. All team members in the workshop should check the south slope of chemical production and the drainage ditch on the west side of chemical production workshop in time. When problems and hidden dangers are found, it is necessary to report to the workshop four prevention leading group in time. At the same time, the workshop four prevention leading group should conduct hidden dangers investigation and management twice a month.

2. In the process of chemical production, the drainage ditch in the area shall be cleaned twice a month to ensure its smoothness, and the main sewage pipes in chemical production shall be tested in shifts to ensure its smoothness; Each team of lime kiln technology should check the surrounding drainage system in time to ensure the smooth drainage system.

3. Before the rainy day comes, the management personnel above the workshop supervisor should check the waterproof work around the benzene tank farm in detail, solve the problems in time when they are found, and reduce the accidents caused by poor running water or blockage.

4. In case of thunderstorm or even rainy weather, the monitor on duty shall discharge the accumulated water in the area in time, and the Sifang leading group of the workshop shall arrange team members to direct the drainage work at the scene in time. If the rain is heavy, contact the company for scheduling in time, and the coordinator should discharge it in time.

5. For some electrical equipment, especially outdoor electrical appliances and instruments, it is necessary to make suitable protective covers to reduce the threat that rain may pose to them in rainy days. Workshop equipment personnel should contact the maintenance department in time to install and improve the protective cover.

6. In case of rainstorm, the shift on duty will strengthen the inspection of buildings and steel structure foundations within the jurisdiction. In case of wall inclination, wall peeling, foundation sinking, etc., contact the workshop four prevention leading group in time, and notify the dispatcher to conduct on-site inspection in time, so as to eliminate defects or implement temporary protective measures in the shortest time.

(3) Explosion-proof measures:

1. Strictly control the hot work in the fire and explosion-proof area. The hot work requirements in the chemical production control area shall be strictly implemented in accordance with the company's hot work requirements. People at all levels in the workshop should attach importance to, supervise and inspect this work.

2. Workshop equipment personnel should contact professional technicians of electrical appliances in the maintenance department to conduct a comprehensive inspection of all explosion-proof motors and power facilities within the jurisdiction of the workshop, and make relevant records and files in strict accordance with the requirements of the Regulations on the Administration of Temporary Electricity Use.

3. Each team in chemical production should check the benzene tank farm on time, and report to the workshop four prevention leading group in time when finding abnormal phenomena and potential safety hazards. In case of emergency, the corresponding emergency plan should be handled and started in time.

4. In order to reduce the safety hazards of crude benzene loading, teams are required to carefully check the qualification certificate, driver's license and other related documents of crude benzene transport vehicles before loading, and strictly check the validity of their documents. Loading any invalid or expired certificates is not allowed; Check the installation of flame arresters and the electrostatic grounding of vehicles. Loading is not allowed without flame arrester or unqualified electrostatic grounding. At the same time, the daily loading time is required to be before 1 1:00 in the morning, after 19:00 in the afternoon and between11:00 in the morning. During this period, the benzene tank is cooled regularly.

5, by the workshop safety personnel to strengthen the daily fire prevention, anti-virus equipment inspection and daily use, training and inspection work, to ensure the emergency skills of personnel in an abnormal state; At the same time, employees should be specially trained.

6. Thoroughly sort out and check the ventilation conditions of the equipment and devices in each pump room, pay close attention to the operation conditions of all kinds of rotating and charged equipment, especially the boiler room, fan room and benzene removal pump room, so as to avoid fire accidents caused by excessive temperature rise, and at the same time, in order to reduce the accumulation of toxic gases and avoid personnel poisoning accidents, strengthen the ventilation replacement work.

7. Each team should check the 3000m3 coke oil tank farm every two hours, carefully record the monitoring situation, contact the dispatcher in time when finding hidden dangers, and notify the workshop four prevention leading group. After receiving the notice, the workshop four prevention leading group should rush to the scene as soon as possible to organize the elimination of hidden dangers or formulate temporary preventive measures. For foreign loaded vehicles, tar workers need to carefully check the vehicles, and vehicles without flame arresters are prohibited from entering the factory.

8, timely check the gas pipeline in the area, found that there is a leakage phenomenon need to be solved in time, and report to the workshop four prevention leading group in summer, require the workshop personnel on duty to the scene to direct the implementation of the work, at the same time, should carefully check the processing results in good condition.

9. It is forbidden for outsourced construction workers to carry kindling and answer mobile phones when entering the factory.

(4) heatstroke prevention and cooling measures:

1. Each team should reasonably organize and arrange various production activities according to the operation of the device load, put an end to employees' fatigue operation, and prevent safety accidents caused by misoperation caused by psychological and physical fatigue.

2. Pay close attention to the mental state of the personnel before they take up their posts, and the personnel on duty in the workshop shall be responsible for the inspection during the shift change that day, so as to reduce the abnormal work caused by illness or lack of sleep and reduce the occurrence of misoperation accidents.

3. Each team should check whether heatstroke prevention drugs are complete in time when going to work, and observe the service life of heatstroke prevention drugs at the same time to prevent poisoning accidents caused by expired diet. When the shortage of drugs is found, it should be reported to the leading group of four prevention in the workshop in time, and the safety officer is responsible for the implementation of drug distribution and contact.

4. Each operating room is equipped with fans and ceiling fans, and indoor ventilation is strengthened. Check the ventilation facilities regularly.

5. The personnel on duty must keep a certain amount of drinking water every day. When the temperature exceeds 33℃, some salt should be added to the drinking water.

6. When the temperature exceeds 35℃, it is forbidden for the benzene stripper and benzene scrubber to salvage slag from the regenerator to prevent heatstroke poisoning in the slag pool.

7. Cover the ammonia washing pool with a cover plate to prevent high-temperature ammonia volatilization poisoning.

8. Strengthen the management of all kinds of dangerous outdoor operations such as working at heights and entering equipment, arrange personnel and time reasonably, take temporary safeguard measures to reduce operation risks, and strictly control them.

Verb (abbreviation for verb) check and evaluate

For all kinds of accidents caused by inadequate four prevention work, violation of rules and regulations, and failure to make inspection records in time in summer, it shall be implemented according to the relevant systems of the company and the workshop.

Supplementary clause of intransitive verbs

(1) The implementation time of this scheme is from May 20xx to June 20xx 10.

(II) Attachment: Workshop Four Prevention Checklist in Summer and Four Prevention Inspection Records of each post.