Personal Work Summary of Technicians in Technical Department 1
_ _ has been a fruitful year, and for me personally, _ _ has been a year of comprehensive progress in my professional skills. In the past year, as a technical cadre with engineering construction experience, I partially or fully participated in the technical work of several construction teams specializing in steam turbines. It is in this busy and fulfilling year that under the unique conditions of Ludian Power Engineering, on the one hand, I tested my original engineering knowledge and further deepened it, on the other hand, I initially built my own professional knowledge system.
I. Overview of work
The technical work that I personally took charge of for the whole _ _ year can be roughly divided into several time periods according to the key points of the phased construction of the project.
At the beginning of the Spring Festival in _ _ _, I was the only technical cadre of the whole steam turbine group because Haikou and Baima projects were in the critical period of construction. As the only technical cadre of steam turbine team, I am responsible for the technical work of all teams in steam turbine specialty. At the same time, the preparation plan of more than 60 sets of construction drawings of all 2 1 large systems in steam turbine specialty is also a time-pressing, huge and extremely important work.
During the period from April when other technical cadres entered the site to August, my work focus changed, and I was mainly responsible for managing the daily construction technical work of Class 1 and Class 2, as well as the unfinished phased construction tasks in the early stage. During this period, I was mainly responsible for the installation of steel platforms in 1 and 2# steam turbine rooms, the hoisting and hauling of three high-pressure heaters, the installation of traveling rail beam and traveling crane in circulating water pump room, the installation of circulating water pipeline in the factory and the installation of high-pressure water supply pipeline that participated in the water pressure test of 1# boiler in the first-class task of pipeline.
Since August, my technical tasks have been gradually stripped off. In early September, all the tasks of the second class of pipeline were delivered to the newly transferred technical cadres in the field, and the tasks were reduced. From June 5438 to this year 10, I began to take over the installation technical tasks of two steam-driven feed pumps. Facing the new task, my professional skills have accumulated to a new stage. So far, my work focuses on the installation of two steam-driven feed pumps, the installation of temporary steam pipeline purging and the improvement of all steam-water pipeline systems responsible for the first-class pipeline construction.
Second, the work summary
In my years of work, I have never been intimidated by a series of heavy construction tasks and unfamiliar technical work. I have always despised the engineering and technical work I am engaged in. After all, these works have mature construction experience to learn from, and there are many engineers and technicians like me who are engaged in this work together. But I am cautious about working methods and strategies, because from the working practice of these systems, we can accumulate and learn valuable experience from the working details.
I regard every job given to me by the team leader as a valuable opportunity to accumulate personal work experience. Successfully completing the task is my only work goal, and trying to solve the construction problems is my only work attitude. I participated in every construction task that I was responsible for, and fully grasped the key points of the unit project and sub-project construction. Taking the installation of steel platform and circulating water pipe in the steam turbine room as an example, these two construction tasks were the earliest unit projects carried out by the steam turbine team. During the construction of these two projects, I often rush between the main workshop and the circulating water pipe trench to check the implementation of key points of the project and discuss with the construction team leader to solve the construction difficulties. It is precisely because I really put myself into the project construction process that I have mastered the span and verticality of steel platform columns, the installation elevation control of steel column nodes, the connection quality control, the installation quality control of circulating water pipes and so on.
To say hardship and fatigue, every worker on the construction site must have a deep understanding, and as a team technician, I have a special taste in it. At the busiest time of engineering construction, I have to run nearly 20 construction teams every day, and I have to run back and forth from the 6 1 m floor of the boiler to the circulating water pump room several times every day for only one reason-I am an engineering technician. Because of the need of work, in the hot weather of more than 40 degrees in summer, I also discussed and solved the construction difficulties of circulating water pipes with the construction team leader under the scorching sun and checked the construction quality. Since I entered the construction site this year, I have only taken five days off for more than 300 days. The rest of the time, like the workers in the steam turbine team, I am busy working overtime every day for the smooth operation of the company's first 600mw unit, rain or shine.
As an employee of a modern large-scale enterprise, as an engineer and technician in a new era, I not only work hard, but also constantly sum up my progress. The conventional construction technology has long been firmly in my mind, and the new problems and difficulties encountered in the construction process are the focus of my summary. When the project is busiest, it is impossible to solve everything on the same day every day, so I will classify these things and deal with them in a planned way. Because my only project construction experience before Luzhou project was Panzhihua 135mw project, I had insufficient work experience and encountered many problems. For my shortcomings and mistakes, I corrected them in time, and for the established facts, I took a positive approach, analyzed the reasons from my shortcomings and mistakes, summed up the experience and lessons, and made them my own wealth.
In addition to technical work, I also hold positions in the general branch and installation branch of the engineering project department, and I am also the person in charge of Qing 'an post of the steam turbine team. Participating in youth activities is always my safety. I actively participate in every activity of the Youth League Committee and perform my duties well in the activities of the Youth League Committee. In the youth activities, my only regret is that due to my busy work, I didn't carry out the activities of young workers in the steam turbine team as planned, and I didn't complete the propaganda task of the steam turbine site in _ _ _, which is the failure of my project.
Three. abstract
I have always admired such a philosophical saying that a gentleman strives for self-improvement, and I have always demanded myself by the standards of an excellent engineer and technician, and I have made progress myself because of this requirement. The glory of the company needs our efforts to create, and personal development needs our own efforts to achieve. For these lofty goals, I have been making unremitting efforts and struggles. In the future work, I will continue to guard against arrogance and rashness, work hard, closely unite with everyone in the company's big family, realize the company's take-off with my brilliant youth, and write my own chapter with no regrets.
Personal summary of technician's work in Technology Department II
Time flies, time is like a song! In a blink of an eye, I have been working for more than a year. Looking back on my work in the past year and summing up the experience and lessons in my work will help me to develop my strengths and avoid weaknesses in my future work and do my work better.
This year, I have been working as a civil engineer in the _ _ project department. Through the practice and study of this project, with the care and training of the leaders of the project department and the enthusiastic help of my colleagues, my work has made rapid progress and I am striding forward to become a qualified civil engineering teacher. Thank the company for its trust in me and the support of my colleagues. Through the joint efforts of the team, I have explored some work experience. I am here to make a personal summary of my work in the past year. Please give guidance and correction from leaders:
First, the working ideas
In this year's practical work, I have changed a lot from an armchair strategist at school to my actual thinking now. The construction site is our main battlefield, and whether the project is done well or not is realized at the construction site. This project is a long process. Only by investing a lot of manpower and material resources and organizing the construction reasonably can the construction progress be guaranteed. The concept of "safety first, alarm bells ringing" is carried out in my whole work!
Second, the job responsibilities
1, and carry out various technical work under the leadership of the competent engineer.
2. Be responsible for the preliminary examination of the construction organization design submitted by the construction unit, cooperate with the supervisor in the construction process and be fully responsible for the construction inspection and acceptance of related projects until the completion acceptance is qualified and delivered for use.
3. Be familiar with the construction drawings, construction specifications and quality inspection acceptance evaluation standards, and be responsible for the inspection and supervision of civilized construction such as project progress, safety and fire control.
4, timely and on-site supervision found not according to the drawings, not according to the specification of the construction behavior, if the site rectification is invalid, cooperate with the supervision issued shutdown rectification list, and reported to the chief engineer.
5. Supervise the on-site security facilities and measures, as well as the safety status of personnel and mechanical equipment in the construction process, and put forward rectification opinions in time.
Third, specific work.
Several other technicians and I are mainly responsible for on-site engineering technical management, and arrange technical work such as setting out, template inspection and steel bar inspection according to the progress of the project! As a technician, we should master the engineering drawings skillfully, make technical disclosure before the construction of each type of work, and monitor irregularly in some error-prone places besides disclosure! Personal hope is "front, middle and back". Before this work is carried out, it is necessary to remind the team leader of the key points of work in advance, supervise many times when large-scale construction is carried out, and then conduct acceptance after the construction is basically completed! We must strictly control the quality so as not to miss any problems!
Four. Experience and lessons
In this year's work, in addition to the construction log, I have been taking work notes, summarizing my daily work and recording some experiences and experiences as a reference for future work! I bought a lot of atlases myself. I usually read more atlases, so I can read more, ask more and listen more! Seriously and carefully. You should be responsible for your work!
I also made many mistakes in my work. Sometimes the work is distracted, and the elevation and size are out of harmony. Fortunately, we found and corrected it in time, which did not lead to an irreversible situation! I grew up in the face of repeated experiences and lessons. I know the weight of this burden and how important it is to develop good work habits! I also gradually summed up my own working methods, which improved work efficiency and reduced the chance of making mistakes! With the help of leaders and colleagues, the technology is constantly improving!
Generally speaking, all the tasks assigned by the leaders have been successfully completed. I have been engaged in engineering construction for one year and have made continuous progress. My professional knowledge has been improved and deepened, and my working ability, including organizational cooperation ability, management ability and adaptability, has been greatly improved. More importantly, I have accumulated valuable work experience. The work performance in the past 20 years has also been recognized by the leaders and colleagues of the project department.
Looking forward to 20 years, there will be more new challenges in my work. I will definitely try my best to work more actively. In the future work, I will meet new challenges with a hundred times enthusiasm, make continuous progress and maturity in my study, and make contributions to the development of the company!
Personal summary of technical department 3 technicians' work
Time flies, it has been more than a year in a blink of an eye. During this period, I worked and studied in two projects. Currently working in Hainan liquid hydrogen project. During my time in the project department, I learned a lot and gained a lot. Although I am busy every day, I feel very fulfilled. At present, I still lack work experience and have a lot to learn. I must study hard and work hard.
As a technician, first of all, I can be strict with myself and constantly improve my ideological consciousness. At the same time, I have always been strict with myself, taking my work seriously and positioning myself well. Try to set high standards for yourself. Actively study all kinds of regulatory documents and requirements related to quality inspection, and often consult predecessors and colleagues in the same industry. In my work, I always keep in mind that I should keep learning in my work and combine theory with practical work well. I constantly change myself in my work, put forward different requirements for myself in time, sum up experience in my work, improve my working ability and improve my professional and technical level.
In the past year's work experience, I have gained something while sweating like rain. In my previous practical work, I organically combined theoretical knowledge with practical work and greatly improved my level. The following is my construction experience during this period:
1, be familiar with the construction drawings carefully, understand the general situation of the project, and prepare for the battle.
To do every job well, we must have a comprehensive understanding of this work before taking up the post, so as to carry out the work better. For civil construction, we should also make preparations before construction, be familiar with drawings and understand the general situation of the project. The so-called know yourself and know yourself. If you don't understand the engineering situation and work blindly, you will go into battle with your bare hands. To carry out the work smoothly, we must be prepared and fight well.
Preparation before construction: be familiar with the construction drawings-relevant technical specifications-operating procedures-design requirements and detailed drawings, joint practices-relevant technical data-engineering quality requirements, etc.
Secondly, we should be familiar with the construction organization design and construction sequence, construction methods and technical measures, and find out the weak links and key parts to complete the construction task. Finally, have a deep understanding of the construction site, be familiar with the construction drawings, and only understand the project on paper. To understand the project clearly and comprehensively and grasp the general situation of the project, you must go to the site to understand it in person. A careful understanding of the basic situation of the project is conducive to better implementation of management, implementation of construction methods and better improvement of work.
2. Feasibility and comprehensiveness of the construction method.
It is a key work of construction technology to summarize the work of civil construction personnel and implement feasible construction methods. Doing a good job in construction preparation and explaining the requirements and methods of construction tasks to the construction personnel is to create good construction conditions for completing the construction tasks. The most important thing is to formulate feasible construction methods around quality and time limit according to the requirements of relevant construction technologies in the whole construction process, and actively organize balance and keep combination in every stage, every working procedure and every construction task.
Secondly, it is necessary to organize relevant personnel to strengthen the inspection of key parts, prevent the occurrence of rework, and correct all kinds of irregularities and violations of construction operation procedures and on-site construction regulations at any time.
At the same time, if there are any design changes or changes in construction conditions, supplementary disclosure shall be made at any time, and records of project increase or decrease shall be handled at the same time, and corresponding procedures shall be handled. The modified contents should be marked on the drawings to facilitate the smooth progress of the construction. We should not only do the above work well, but also strictly implement the system of quality self-inspection, mutual inspection and handover inspection.
3. Establish good interpersonal relationships
In the construction site, to ensure that a project can be completed with good quality and quantity, it is necessary not only to have certain technical skills, but also to be able to blend in with the following construction personnel. At work, communicate with workers and respect them, win their trust, so as to carry out all construction instructions.
It is also necessary to establish a good working relationship with Party A's on-site representatives and supervisors, actively communicate with Party A and supervisors in construction technology, listen to their feasible construction methods, and strive for Party A and supervisors' satisfaction and recognition of on-site construction conditions.
As a member of the Sinochem family, we should not only consider the enterprise, but also make our own contribution to the construction of Sinochem. So I am strict with myself, responsible and self-motivated. I hope that through my continuous study and efforts, I can learn more knowledge, constantly improve myself, realize my own value, and work hard for the rise of Sinochem Six Construction. Of course, I still have many shortcomings, such as lack of work experience and lack of strict sense of responsibility. These are all problems that I will improve.
Here, I also hope that the leaders will affirm my work and give me valuable advice. I will accept it with an open mind, correct it as soon as possible, and let myself put my side into my work as soon as possible. Finally, I wish Sinochem Sixth Construction Co., Ltd. greater and greater benefits!
Personal summary of the work of 4 technicians in technical department
20__ is an important turning point in my life. Leaving school and stepping into the society, my life has a new starting point, a new beginning and a new goal. Lanshan Tunhe New Materials Co., Ltd. gave me a practical opportunity to apply theory to practice. During my work, my colleagues take good care of me and often give me encouragement and help. I will summarize my work in these months as follows:
First, the work harvest
In the past few months, as a quality inspector, I have carefully studied the company's quality management control process. According to the requirements of job responsibilities, I have the following main achievements:
1, raw and auxiliary materials are sampled and put into storage. I strictly follow the management requirements of the company to avoid missing a lot. Understand the physical and chemical properties of various raw materials and store them reasonably.
2. Sample inspection is a fine inspection process. Details determine success or failure. During the experiment, I do every experiment well with a rigorous working attitude. At present, I have mastered the inspection methods and steps of all raw materials. Thanks to my master and my colleagues, you taught me this.
3. Data Processing When recording data, I record, summarize and report every experimental data based on the principle of "seeking truth and being pragmatic". Make no mistakes and make false reports.
Second, feelings and experiences.
1, attitude determines that all work must be meticulous and meticulous. You can't always make mistakes. If necessary, check the results of your work to make sure that your work is foolproof. After work, we should always sum up work lessons, constantly improve work efficiency and sum up work experience. Although I will make some mistakes in my work and be criticized by my leaders, I don't think this is a shameful thing, because I think these mistakes and criticisms can help me avoid similar mistakes in my future work and make me grow faster in my work. During the time I worked with you, I was deeply impressed by their rigorous and serious work style, and I also learned a lot from them that I lacked.
2. Be diligent in thinking about the daily work of the post. It is tedious and boring in a few days, which requires us to be diligent in thinking about improving working methods, improving work efficiency and reducing working hours.
3. Constantly learning and constantly enriching your professional knowledge and skills will make your work more handy.
If a person wants to make a difference in his post, he must be familiar with the professional knowledge of the post and broaden his knowledge in continuous learning. I am like a blank sheet of paper. I haven't written a word on the company's paper until now. The paper is full of neat handwriting. Leaving school is my second class. Learning to work endlessly is another way of learning. After several months of laboratory study, I have now reached the working level of a regular employee.
Third, its own shortcomings.
1. Occasionally, work mistakes caused by carelessness bring unnecessary trouble to the work. In the future, I will finish my work seriously with a rigorous working attitude. Quality inspector's year-end summary
2, because other people's personality reasons are not active enough. In order to complete the work more perfectly in the future, I will take the initiative to communicate with my leading colleagues. I hope to learn from them what they can't learn in textbooks through conversation.
Since I left school and stepped into this historical stage, I feel that this society is strange for the first time, and everything is difficult for me, whether at work or in interpersonal relationships. After these months of baptism, I really grew up a lot.
The end of 20__ years, the arrival of 20__ years is both the beginning and the end. What is presented to me is a fertile ground for me to gallop, and I clearly feel the heavy responsibility. In my future work and life, I will continue to study and practice in depth, constantly improve myself, and live up to the opportunities and leadership given by Blue Mountain Tunhe and the cultivation of my colleagues. I will grow up with Blue Mountain Tunhe. ......
Personal summary of the work of 5 technicians in technical department
First of all, let me introduce the situation of the yantai wanhua project. Yantai wanhua Project is located in Lingang Chemical Industrial Park, Yantai Economic and Technological Development Zone. Electrical installation mainly includes power, lighting and grounding. The power distribution room includes the installation of transformers and voltage cabinets, cable laying, wiring calibration and debugging. The construction unit is yantai wanhua Polyurethane Co., Ltd., the supervision unit is Beijing Huaxia Petrochemical Engineering Supervision Co., Ltd. and Shandong Qilu Petrochemical Engineering Co., Ltd., and the design units are Lu Hua Engineering Technology Co., Ltd., Shandong Qilu Petrochemical Engineering Co., Ltd. and Shanghai Haicheng Design Institute. Company X has undertaken two sets of main equipment areas, namely yantai wanhua Project Department, Gasification Unit Area and Propane Dehydrogenation Unit Area, including 32 main projects in Gasification Unit Area and 33 main projects in Propane Dehydrogenation Unit Area, with a large amount of electrical instruments, including 18 main project started in Gasification Unit Area and 8 main projects started in Propane Dehydrogenation Unit Area. Compilation of construction plan and commencement report, submission of data, inspection of on-site lightning protection and grounding, electric lighting, hidden piping for power and fire alarm, data and engineering data.
Yantai wanhua project is different from other projects. When I first came to the project department, I didn't adapt at all. Its management mode introduces DuPont management mode, which puts forward higher requirements for itself and the whole team. With the continuous understanding of Wanhua's enterprise management system, I have gradually adapted to its enterprise management mode, which also requires us to be stricter with ourselves. I will think ahead of the work to be done next week. And make preparations in advance and make technical disclosure, and insist on going to the scene at least once a day to understand the actual situation on the spot, so as to know fairly well. The online process is used to submit the material budget of Wanhua Project. First, submit the budget of newspaper cardboard materials. After the online electronic board material budget is approved, submit the demand plan. The required information needs to be found in the OA platform material library. Because there are many and miscellaneous materials in the construction of electrical specialty (many materials are not in the material library and need to communicate with the owner, design and procurement departments repeatedly), which brings us great trouble, so I set up a material coding library myself and a ledger for the material coding of common materials, which greatly saves time and improves work efficiency.
At present, I am responsible for the technical quality of the whole construction site. The two installation areas are far apart. At first, two project departments, two supervision units and three design units really couldn't stand it. So I make a three-day work plan every day, write down my daily work on paper and do it one by one. When I finish one thing, I will eliminate one thing on paper, which improves work efficiency and avoids shaving and eyebrows.
The 20_ year is coming to an end, and I feel that I still have a lot to do. There is still a lot to learn. I feel that on-site learning can learn a lot of new things every day. At the same time, I hope the company can organize more training courses, mainly aiming at the actual situation on the spot. We should emphasize theory and practice as much as possible, and tell everyone about the good construction methods and the problems that should be paid attention to on site. We will try our best to make every work of our instrument and electrical company a bright spot. If our work is not in place, we also hope that the company leaders will give us more criticism and advice, and we will conscientiously complete every task given to us by the leaders. I will refuel!
The technical staff of the technical department personally summarized five related articles:
★ Technician's personal annual work summary and five plans.
★ Five personal work summary reports of technicians.
★ 5 Summary of the work of 2020 individuals in the technical department.
★ 5 Personal work summary of technical department.
★ 5 summaries of personal annual work of the technical department.
★ 5 Technical personnel's work summary
★ Technician's personal annual work summary 5 articles.
★ Five personal annual work summaries of engineering and technical personnel.
★ There are 5 annual work summaries, with individuals from the technical department.
★ 5 Work summary of technical department.