Creative planning, tailored
According to the characteristics and scale of the landscape design project, we carefully plan the overall plan, which takes about 10-25 days. After the entrusted project is completed, we will communicate and report with you, and large-scale municipal projects will continue to deepen the design by selecting the winning bidder through bidding.
Deepen the design and show the details
In the next 10-20 days, we will determine the overall layout, vertical design, node refinement, etc. , and estimate the project cost. We pursue the perfect presentation of every detail.
Accurate design and quality assurance
15-20 days in the preliminary design stage, the overall plane and vertical design will be refined, the section elevation and detailed nodes of important nodes will be displayed, the material specifications and vegetation varieties will be defined, and the perfect combination of quality and design will be ensured.
Construction drawing, be clear at a glance.
In the 20-30-day construction drawing design stage, we will provide the layout, hydropower structure practices, node details, factory statistics, specification requirements, etc. To make the structure easier and clearer.
On-site cooperation, solve worry-free
After the construction drawing is completed, the project enters the construction stage. Our designers will follow up on the spot to solve the problem that the drawings are inconsistent with the actual site and ensure the perfect landing of the design.