In school or society, some unexpected things will inevitably happen. In order to control the development of accidents, it is often necessary to make emergency plans in advance. How to prepare an emergency plan? The following is my 202 1 property company's emergency plan for typhoon safety, for reference only. Welcome to reading.
Emergency Plan for Typhoon Safety of Property Management Company 1 1. Purpose:
Establish an emergency plan for flood prevention and typhoon rescue, strengthen the flood prevention and rescue ability of the management service area through the training and actual combat drills of emergency teams, eliminate dangerous situations more effectively and timely, reduce losses to a minimum, and ensure that the flood prevention and typhoon rescue work is foolproof.
Second, responsibilities:
The director of the management office is the commander-in-chief of flood prevention and typhoon rescue;
The person in charge of the management office is the deputy commander, who is responsible for the overall work of the equipment group;
The safety promoter is the deputy commander, responsible for the overall work of the rescue team;
The environmental organizer is the deputy commander-in-chief, responsible for the overall work of the logistics team;
The control center is responsible for the accurate transmission and coordination of information;
All off-duty personnel in the management office are emergency rescue team members for flood prevention and typhoon prevention.
Third, the division of responsibilities of the group:
3. 1 rescue team: it is composed of all the off-duty safety officers in charge of safety.
3. 1. 1 Take all measures to deal with the dangerous situation;
3. 1.2 Responsible for filling, handling and stacking flood control sandbags;
3. 1.3 use various methods to eliminate dangerous situations in time.
3. 1.4 Division of labor
3. 1.4. 1 Two off-duty central posts are responsible for loading sandbags;
3. 1.4. 2 2 No.2, No.3 and No.4 are responsible for transporting sandbags;
3. 1.4.3 Two off-duty No.6 and No.8 are responsible for piling sandbags on site and taking other measures for emergency rescue;
3. 1.4.4 The safety sponsor leads the rescue team to take all other effective methods to do all rescue work well.
3.2 Equipment group: consists of the manager of the management office and two technicians of the management office.
3.2. 1 Responsible for starting various pumps and power supply equipment;
3.2.2 Provide technical guidance to the rescue site;
3.2.3 Conduct emergency maintenance on the field equipment.
3.3 Logistics Group: It consists of environmental sponsors, domestic helpers, lifeguards, front desk attendants, cashiers and club attendants.
3.3. 1 Ensure the normal supply of all kinds of relief materials;
3.3.2 Be responsible for the rescue of the wounded on site;
3.3.3 Actively assist other groups;
3.3.4 Division of labor
3.3.4. 1 Two off-duty No.5 posts are responsible for logistics and material support;
The front desk attendants, cashiers and club attendants in 3.3.4.2 are responsible for evacuating people and rescuing the wounded, transferring the wounded to a safe place and reporting to the municipal emergency center in time;
In 3.3.4.3, lifeguards and domestic helpers are responsible for property rescue.
3.4 personnel on duty
4. 1. 1 When the personnel on duty find the danger, they shall promptly notify the center and the leaders on duty;
4. 1.2 After receiving the information, the attendant in the center shall take emergency gathering and other measures to call off-duty personnel to relieve the danger in time;
4. 1.3 The personnel on duty in the center shall immediately notify the management office manager, management office supervisor and safety director;
4. 1.4 center attendant reports to each duty post;
4. 1.5 Maintain the order of posts on site and guide personnel and vehicles;
4. 1.6 The attendant in the center should pay close attention to the site situation and seek other support when necessary.
4. 1.7 Before the typhoon comes, all posts in the management office should carefully check the potential safety hazards within their posts, eliminate the danger in time, and report the serious cases to their superiors in time.
Note: all members must obey orders, obey orders; All members should pay attention to their own safety during emergency rescue.
Emergency plan for typhoon safety of property company II. Purpose:
In order to establish and improve the early warning and emergency response system for public emergencies in property management, and to ensure that the property company can effectively and orderly do a good job in flood control and disaster relief in the event of major floods, this plan is formulated in accordance with the requirements of the higher authorities and company leaders, combined with the actual situation of our company, in order to implement the emergency rescue and disaster relief work and ensure the safe flood season this year.
Second, the guiding ideology
Conscientiously implement the spirit of the national, city and county flood control work conference, adhere to Scientific Outlook on Development's and people-oriented ideas, actively defend against flood disasters, implement the working policy of "safety first, prevention first, standing by and doing all-out rescue", and build a harmonious society; Unified leadership, careful deployment, coordinated action, hierarchical management, clear division of labor, scientific scheduling, further strengthen flood control responsibility, earnestly grasp all aspects of flood control work, improve and implement various flood control plans, strengthen flood monitoring and early warning and forecasting, improve the comprehensive ability of flood control and waterlogging prevention, and minimize the losses caused by flood disasters to families and companies.
Three. primary mission
1, implement the responsibility system. Conscientiously implement the flood control responsibility system with the project manager responsibility system as the main content, improve the rules and regulations, clarify the job responsibilities, and implement the responsibilities to people.
2, organize the formulation and implementation of flood control emergency plan. Combined with the actual situation of various departments and projects, fully foresee possible problems, and scientifically and reasonably formulate emergency plans for flood control and flood fighting.
3, all departments and projects of flood control materials in place, do enough flood control materials, do a fixed position, the specialist is responsible for the management.
4, each project do someone on duty 24 hours a day, and there is a leadership shift, the project manager responsibility system. Ensure the smooth flow of information and properly handle emergencies.
Four, leadership and command and rescue and disaster relief agencies
1, set up a flood control working group.
Conductor: xxx
Deputy commanders: xx, xx, xxx
Members: xx, xx, xx, xx, xx, xx, xx, xx, xxx.
2. Establish the company's flood prevention and rescue commando.
Each project will set up its own rescue commando team, with each project manager (or order maintenance supervisor) as the captain.
Verb (abbreviation for verb) main responsibility
1, flood control work leading group responsibilities
(1) Quickly receive and convey instructions from flood control departments and superior leaders on flood control and disaster relief.
(2) deploy and direct the implementation of flood control and flood relief operations. In case of danger, all emergency commandos are under the command of the leading group for flood control.
(3) to master the basic situation of flood control and flood fighting work in each unit, understand the water situation and report it in time.
(4) Perform other tasks assigned by superiors.
2, flood control and emergency commandos responsibilities
(1) Receiving and reporting flood control and disaster relief.
(2) directly participate in flood control and disaster relief operations.
(3) Coordinate the resettlement and transportation of affected households.
(4) Complete other tasks assigned by the company's leading group for flood control.
Preparation of intransitive verbs (refer to the actual situation of each project)
1, check and clean the ground and roof drains in advance, clean septic tanks and sewage wells, and check the interface between the drainage supervisor and the municipal pipe network to ensure smooth flow.
2. Check the sewage pump to ensure that the sewage pump in important positions (generator room, pump room and power distribution room) can run automatically.
3. Repair the standby generator and control circuit to ensure the safety and reliability of emergency power supply.
4, check the flashlight ` in good condition, check the equipment room emergency lighting.
5. Check the lightning protection system of the community.
6. Check the facade of the external wall, notify the residents, arrange the balcony and roof garden, and clean up the high-altitude bent frame and canopy.
7. Prune the dead branches of big trees and branches with serious pests in the community.
8. Determine the evacuation route and location of emergency vehicles and personnel.
9, the project fixed personnel, regularly watch the local weather forecast every day, and timely report important information to the project leader.
Seven. Key locations, equipment and facilities of the project (refer to the actual situation of each project)
1. Focus on monitoring the equipment and facilities (basement, elevator shaft) below the horizontal elevation of the computer room and residential area.
2, office computers and monitoring host, road brake equipment and other public electrical equipment.
Eight, material preparation (each project with reference to the actual situation)
1. Prepare spare water pump, bucket, broom and towel.
2. Prepare necessary rain gear, such as umbrella, rain boots and raincoat.
3. Emergency lighting such as flashlights and emergency lights.
4. Emergency communication such as walkie-talkie.
5, medical care: tourniquet, anti-inflammatory drugs, iodine, band-aid.
6. Safety belts, safety ropes, shovels and other emergency tools and materials.
7. Prepare the necessary funds.
8. Emergency support vehicles.
Nine, emergency measures after the flood
1, general flood emergency
(1) Strengthen communication with county flood control departments and strengthen flood monitoring and forecasting.
(2) According to the actual situation of each unit of our company, put forward flood control requirements for all departments and projects, and evacuate residents in an organized manner.
(3) Take measures to ensure smooth communication of flood control system.
(4) Supervise the preparations for emergency rescue and disaster relief, and check the implementation.
(5) According to the flood trend of flood control departments, strengthen flood prevention publicity and education for residents, quell rumors, stabilize people's hearts, and maintain normal production and living order.
2, major flood emergency
(1) After receiving the emergency notice of major flood from the superior leaders, the flood control and disaster relief commandos of various projects involved in the flood quickly concentrated, so how can they quickly put themselves into the flood control and emergency rescue work?
(2) Organize forces to do a good job in the evacuation and resettlement of residents and take favorable measures to ensure the basic living conditions of residents as much as possible.
(3) Organize relevant personnel to maintain public order and prevent people from making trouble.
(4) Understand the disaster situation, do a good job in propaganda, quell rumors and misinformation, and maintain social stability.
Specific emergency measures shall be implemented according to the above-mentioned process, combined with the actual situation of the project, and in accordance with the flood control emergency work plan of the project.
X. Summary and reporting of information
According to their respective responsibilities, the Project Flood Control Headquarters is responsible for collecting, sorting out and studying the analysis and summary of possible flood control information in this area, and reporting the situation to the company's competent leaders in a timely manner according to the principles of early discovery, early reporting and early disposal. Any individual has the right and obligation to report all kinds of flood control emergencies and possible hidden dangers to the company office, and has the right to report the negligence and improper handling of relevant departments. The submission and processing of flood control information shall follow the following principles:
1. Important information should be reported immediately. If it is difficult to accurately grasp the information due to objective reasons, the basic information should be reported in time, and the situation should be grasped at the same time, and then the details should be added.
2, general information according to the project management authority, submitted to the flood control responsible person of each project.
3. The company's flood control working group shall report immediately after receiving reports on major floods, work, insurance and disasters.
XI。 others
When encountering major, urgent and unexpected events or situations involving residents' normal work, operation and life order, cooperate with the customer service centers of various projects to verbally inform nearby customers and do a good job of appeasing and explaining customers.
Emergency Plan for Typhoon Safety of Property Management Company 3 1. purpose
In order to effectively and orderly carry out typhoon and rainstorm prevention work and minimize the losses caused by disasters, this plan is formulated.
Step 2 organize
The company set up a leading group for typhoon and rainstorm prevention, with the manager and deputy manager as the team leader and deputy team leader, and the members of the group are composed of the heads of various departments of the company.
3. Emergency response
3. 1 The typhoon and rainstorm prevention team should pay close attention to the weather forecast. When the meteorological department issues a yellow and above typhoon warning signal or a yellow and above rainstorm warning signal, start the company's typhoon and rainstorm prevention plan.
3.2 After the plan is started, the leader or deputy leader of the typhoon and rainstorm prevention leading group will go to the scene to command. If you can't go to the site for some reason, you should designate a special person to conduct on-site coordination and command. Company employees will not go out unless there are special circumstances, and they are always on standby to participate in emergency rescue and disaster relief.
3.3 After the plan is launched, the main tasks that all relevant departments should do are:
First, the property department:
Post the warning notice of typhoon and rainstorm, and inform the manufacturers and residents in the area to cooperate with safety precautions.
B, engineering department:
(1) Check whether all drainage pipes, drains and drains are in normal use. If there is any blockage, immediately arrange dredging to ensure the smooth drainage pipeline.
(2) Check whether the window glass, signs and billboards on each floor of the factory building are firm and reinforce the weak ones.
(3) Cut off the dangerous outdoor power supply, check whether the lines and electrical equipment are damaged and ensure safety before resuming power supply.
(4) In case of power failure, the main electrical equipment should be shut down immediately to prevent the power from being damaged by strong pulse when power supply is restored.
(5) When the power supply and distribution room is flooded, the main power supply must be cut off immediately, and the power supply office should ask for help if necessary. After flooding, the equipment and facilities must be dried and overhauled, and the insulation measurement meets the requirements before they can be put into use.
(6) During storms and rainstorms, cargo elevators and passenger elevators stop running without special circumstances, so as to avoid people being trapped due to sudden power failure.
(7) During the rainstorm, strengthen the inspection of water supply system, check whether sewage enters the overflow port, and immediately stop all production and domestic water supply pumps (including self-prepared wells) if found.
(8) If typhoon accompanied by rainstorm causes flood, we will cooperate with other departments for dredging and drainage according to the arrangement.
C. Security sector
(1) Check whether there are falling hazards in the factory building, the rooftop of the complex building and the balconies of all households, and move the exposed flowerpots on the balcony and other items that may be blown away by the wind indoors; Used for guardrails, awnings, clothes poles, doors and windows, boards, scaffolding, temporary buildings, etc. Found loose and easily blown down by the wind; Immediately notify the manufacturer, shopping mall or engineering department for treatment and reinforcement.
(2) According to the customs and rain conditions, increase the security guards on duty as appropriate, and strengthen indoor patrol when the storm comes to prevent the occurrence of crimes associated with disasters; Do a good job in traffic guidance.
(3) When there is a flood in the industrial area, set up relevant warning signs in the deep water area to guide the waders to go from the shallow water area.
3.4 Requirements and Precautions
Typhoon prevention work should be people-oriented, safety first, prevention first, and full rescue.
The windproof plan is started, and the heads of all departments make windproof work arrangements according to the division of labor. Immediately report the danger to the on-site commanding and dispatching personnel, and strictly obey the command of the on-site commanding and dispatching personnel.
If it is found that the temporary buildings on the open space are unstable, dangerous and unable to be reinforced, the residents should be evacuated and resettled.
If the storm causes the shops and open space manufacturers in front of the industrial area to be flooded, the engineering department should immediately cut off their power supply.
In case of flood, it is not allowed to open the manhole cover for drainage without safety measures, so as to absolutely ensure the safety of personnel.
The company will increase the number of personnel on duty according to the weather forecast, and the personnel on duty in all departments should stick to their posts.
After the typhoon and rainstorm, it is necessary to clean up the disaster site, count and record the losses and learn lessons. In case of tube explosion, power failure, personal injury and other accidents, contact relevant functional departments immediately.
Division of responsibilities of each post in Typhoon Safety Emergency Plan 4 (1) of Property Company
1. The security department should do a good job in information transmission, resource allocation and related logistics support in case of sudden rainstorm.
2, engineering maintenance department is responsible for water supply and drainage, power supply, air conditioning, elevators and other mechanical and electrical equipment failure and emergency treatment.
3. The public security fire department of the property service company is responsible for the "three defenses" emergency treatment, security and voluntary fire fighting, and is also responsible for emergency rescue and disaster relief.
4. The cleaning and greening department is responsible for greening, environmental disaster protection and post-disaster recovery.
(2) Typhoon prevention, flood control and emergency treatment
L, after receiving the typhoon or rainstorm warning signal notice, the property service company should immediately mobilize urgently, and all departments are in a state of war. At the same time, the manager of the command group was established as the chief commander, and the heads of various departments were members of the temporary headquarters of the three defenses. Relevant personnel should implement a 24-hour duty system and prepare for flood control and disaster relief.
2. Before the typhoon or rainstorm comes, measures should be taken to prevent wind and prevent water immersion, such as: do emergency work for wind and prevent water immersion, close doors and windows, and check and clean up flood drainage equipment, facilities, advertising signs, flower pots, etc.
(1) Check whether all doors and windows, especially double-door glass doors, are adequately protected and stable.
(2) Fix all items that are easy to loosen, especially those located on the roof and balcony. Some items that are easily blown down by the wind, such as flower pots, should be moved indoors or tied tightly.
(3) Check all drainage pipes, manholes, rainwater pipes, etc. , and remove the garbage, silt and sundries that may cause siltation.
(4) Ensure that all emergency appliances are available at any time, such as sandbags, raincoats, helmets, water boots, ropes, standby lighting, square timber (for fixing glass doors), etc.
(5) Check whether the drainage pump system is normal and unobstructed.
(6) Check whether the power generation system and its oil supply device are normal, and try to develop the motor set according to regulations.
(7) Turn off the neon power.
(8) Whether the intelligent system equipment runs normally.
(9) After the inspection, solve the problems found in time, and report to the leader immediately if there are any problems that cannot be handled.
3. In case of typhoon and rainstorm, the security officer on duty will strengthen the patrol of key areas and parts such as windproof and waterproof immersion, and check the condition of doors and windows. If there is broken window glass, they will rush to the scene as quickly as possible and temporarily cover it with plates. Maintenance personnel of the engineering department are on standby, and management service personnel at all levels stick to their posts. If there are complaints about equipment failure and potential accidents are found, emergency measures should be taken to solve them in time.
4, personnel at all levels to assist maintenance technicians to do a good job of flood drainage and water drainage.
5, in the typhoon, flood and other natural disasters and accidents, to prevent the occurrence of criminal cases.
(3) Post-disaster treatment
After the typhoon and thunderstorm, the engineering department organized maintenance personnel to inspect the equipment and facilities under its jurisdiction, and repaired them in time if any damage was found. The cleaning department inspected and restored the damaged trees in an attempt to minimize the impact of the disaster. The property manager reports the disaster and losses to the general manager of the company in time.
;