Hold safety production month activities to enhance people's safety awareness. I want to share with you the following record of the activities of Safety Production Month in June. Welcome to browse.
Article 1: June Work Safety Month Activity Record Meeting Time: MM DD YY.
Meeting place: conference room on the third floor of the company.
Moderator:?
Participants: company leaders, heads of departments and project departments.
Contents of meeting minutes:
The meeting was chaired by * * *. According to the spirit of the regular meeting of cadres held by the general manager and some phenomena found in the recent supervision and inspection work, new arrangements have been made for the next step.
1, safety supervision and inspection. From once a month to twice a month, the main participants, safety officers and principals give rectification instructions according to the inspection situation; Hold regular safety meetings at the end of each month to report the recent safety work.
2. Safety inspection system. On-site inspectors, safety officers, management personnel, etc. All parts shall be inspected and registered according to the system. The frequency of inspection is low, and those who do not follow the system will be punished according to relevant regulations; The rolling mill added a record book to the thin oil station, and the personnel checked and registered properly.
3. Factory vehicle management. At present, our company has a large number of vehicles, such as forklifts, transport vehicles, tractors, excavators, commercial vehicles and so on. Therefore, it is necessary to strengthen the supervision and management of on-site personnel, especially construction vehicles, to explore the construction site, and to stop or notify the security department to deal with violations.
4. Conduct pre-job training for safety leaders and special operations personnel in different regions. Special steel and high-speed wire rod will be put into production soon, and now all regions should set up part-time safety leaders; The safety operation procedures of each post should be compiled into a book, and employees should be trained in a targeted manner.
5, homework ticket use. At present, there are many aerial work, hot work and confined space work, but the use of individual work tickets is not in place. People at all levels sign the working ticket, which also informs you to check its preventive measures and arrange personnel to check and assist, and also reflects the importance attached to safety. If the next inspection finds that the operation ticket has not been handled, it will be punished according to the regulations, and if the illegal operation is found, the punishment will be doubled.
6. Safety signs on the project wall. Now that the high-speed rail has been partially completed, it should be used as soon as possible, especially the gas station, power distribution room, operation desk and other parts, which will be tested soon to serve as a warning to operators and outsiders; Some special steel safety signs should be made after collection; The marking of new factory buildings must be carried out according to the promulgated national laws and regulations.
7. Smoking is strictly prohibited. At present, people have been arranged to conduct inspections every day, and occasional surprise inspections at night. If anyone is found smoking at the scene, it will be handled according to the regulations. No matter what happens, everyone should be informed in place, including our employees and foreign construction teams.
8, lightning protection self-inspection. Each factory uses the key table to do self-inspection on the grounding of gas station and power distribution room to see whether the grounding meets the requirements; At present, in order to reduce the damage of lightning and static electricity to electrical appliances or lines, some units have installed surge devices in dangerous parts such as gas stations to prevent damage. Let's see if we should install them.
9. Summer is coming, so we should do a good job in heatstroke prevention and gutter cleaning. Measures such as increasing part of cooling water for employees; Some equipment should be checked; The driving temperature is high, so it is necessary to check and maintain the air conditioner and urge the new driving air conditioner on the project. Before the rainy season comes, it is necessary to clean the gutter and the sink on the top of the workshop, repair the damaged downspout, and prevent rainwater from recharging or getting wet. The low-lying temporary lines of the construction team of this project should be cleaned up to prevent accidents.
10, traffic safety. Some new employees have entered the project one after another, emphasizing traffic safety. At the same time, it is necessary to issue a receipt now, so that they can form good habits from the beginning.
?
Chapter II: Activity Record of Safety Production Month in June 20xx On March 28th, Li Yongjun, deputy chief engineer, presided over the company's regular safety production meeting in March in the conference room of power transmission and transformation operation work area. Zhang Baofu, deputy general manager of the company, leaders and safety officers from safety supervision department, biotechnology department, dispatching department, marketing department, development and construction department, power supply office, work area, customer service center, metering center, logistics center and street lamp office attended the meeting. The meeting summarized and arranged the recent safety production work, and the company leaders gave important instructions on safety work. The contents of the meeting are summarized as follows:
First, the meeting fully affirmed the company's achievements in safety production in March.
With the joint efforts of all cadres and employees, the company's production safety situation in March was good. In March, there were no major and above accidents in the company's system, and no personal injury or death accidents occurred. As of March 28th, 20xx, the company has been operating safely for 7249 days. Power transmission, transformers, 10KV and low-voltage equipment are generally running well. 10 kv first-class obstacle 1 time, 7 times less than last year (8 times), and more than 2 times of power line failures of 35kV and above. In March, the maximum load of Jinghai Power Grid was 836MW, a year-on-year increase of 10.9%. This month, 35kV and above lines were charged twice, and 10kV lines were charged 36 times. This month, the equipment of the system station was overhauled 27 times, among which 8 defects need to be dealt with. This month, the company's leaders tracked 36 person-times on site and found violations 13 times, all of which were rectified on site, and the company's various on-site operation behaviors were further standardized. The safety supervision department of the municipal company praised the installation site of Chen Guantun's household meter.
2. Send the electrician area and Tangguantun Institute to make a special report on how to do well the Lvguantun outgoing line project and the Ma Xinzhuang line cut-over reconstruction project.
Send the electrician area to organize relevant construction teams to hold a special meeting, educate them on safety knowledge and disclose dangerous points, and sign a safety agreement with them, so that they can fundamentally realize the importance of safe construction; Second, cooperate with the functional departments of the company to carefully examine the construction plan and three measures of the project, supplement the missing items and omissions in the plan and three measures in detail, comprehensively describe the possible safety hazards in the project, and formulate preventive measures in a targeted manner; The third is to arrange a special car to comprehensively supervise and guide the implementation progress of the project, and solve different problems in different periods one by one to ensure that hidden dangers are discovered and eliminated in the first time; Fourth, organize all cadres and workers in the work area to understand the implementation progress, implementation content and safety measures of the project, so that every worker can know fairly well. At the same time, each construction site is carefully surveyed to eliminate all kinds of blind spots in construction and ensure the smooth completion of the project.
Tang Guantun Institute set up a leading group for Ma Xinzhuang railway line cutting and reconstruction, carefully analyzed all aspects of the project, determined the key hazard points of the project, defined the responsibilities, and established? Two groups and one control? Working group. ? Two groups? Namely, the preparatory group and the inspection group. A control? That is, the safety supervision team, starting from the details, made steady progress. According to the design scheme, in order to further ensure that there are no loopholes in line cutting and transformation, the institute has taken many line surveys and field surveys, and has a thorough knowledge of the line environment, and has formed a written cutting and transformation scheme to ensure that many small branches of 1 1 line can be cut and transformed without personal injury and line equipment damage accidents. The leading group of line cutting and line changing entered the construction site, taking strengthening the safety management of the construction site as the key point to control the occurrence of construction accidents. Strictly implement the contact system of working ticket, operation ticket and stopping power transmission, focusing on putting an end to habitual violations, inadequate supervision, and violations of operating procedures in near-power or live-line operations. Strengthen the supervision and inspection of construction personnel and improve their awareness of self-protection. 1-2 The person in charge of construction and relevant personnel shall enter the site in advance to explain the construction contents and matters needing attention, earnestly implement the on-site investigation system, do a good job in the pre-construction meeting, and analyze the hazards and construction steps. In the process of site construction, strictly fill in the ticket before work, sing the ticket at work site, and carefully verify the safety organization measures and technical measures to ensure the safe and smooth completion of this project.
Three. The meeting made arrangements for the company's safety production work in April and put forward clear requirements.
1, continue to promote the safety of the company's leading cadres, production departments and office managers, and arrange on-site inspections by vice presidents and leaders above the production department. In April, the focus of the site was on the spring maintenance site and the small site of household table replacement. Please report to the site in the safety supervision system in time every Thursday for arrangement. At the same time, infrastructure projects were put into production on a large scale in April, and there were many abnormal ways in the power grid. Please strengthen site control to ensure the smooth progress of all projects.
2. Strengthen the control of safety evaluation and rectification work, and the safety supervision department will organize relevant units to further promote the implementation of various rectification measures to ensure that the rectification work is completed on schedule.
3. It is also the peak time for birds to build nests. All units should continue to strengthen the protection of power facilities, play the role of line guards, do a good job in line inspections, and effectively reduce the occurrence of various accidents and first-class obstacles.
The power grid load will continue to increase further in April and April. According to the annual load curve, there will be a load peak in April every year, even exceeding the level in May and June. In April this year, it is bound to hit another historical high load, which will put great pressure on the safe operation of power grid equipment. All operating departments should do a good job in equipment inspection and hidden danger investigation, eliminate defects in time and nip in the bud. The centralized control station should strictly implement the reactive power and voltage adjustment curve in the second quarter, actively switch capacitors, and adjust the main transformer separately in time to ensure the reactive power balance and voltage stability of the power grid.
5. LV/LV outgoing line project of 220kV station in Lvguantun will be started one after another, and relevant units should cooperate with the functional departments of the company to do all the work before commissioning.
6. Focus on checking the customers of major harmonic sources, and issue rectification notices to users with harmonics. In April, the marketing department took the lead in carrying out key inspections including Zexiang Copper, Qunxin Iron and Steel, Taifeng Iron and Steel, Boxing Station, Hengxing Station, Shuntian Station and Fulaiya Station: mainly checking the operation status and whether the treatment device is in good condition, so as to avoid the failure of the treatment device due to customers' failure to put into operation or device damage, which will endanger the safe operation of the power grid.
7. Do a good job in site safety and project quality control of Lvguantun and Ma Xinzhuang New Outlets projects. Please ask Tangguantun Power Supply Bureau to carry out the construction site acceptance in strict accordance with the requirements of the acceptance work instruction, strictly control the construction quality and ensure the equipment? Zero defect? Handover operation.
8. In view of the comprehensive overhaul site of Dongbaitou on April 2 1 April, the overhaul work area and the operation work area are requested to prepare the overhaul work instruction in advance and submit it to the Biotechnology Department for review, and make overall arrangements for overhaul, and make a plan for the renovation of the 5-bus 35KV switchgear in advance, and complete the plan review before the end of this month to ensure the smooth progress of all the renovation and comprehensive overhaul work.
9. During the thunderstorm season, please ask all relevant units to do a good job in lightning protection of power transmission and distribution equipment and information room.
4. Zhang Baofu, Deputy General Manager, gave important instructions on the recent work:
The power grid load of our company has been rising continuously recently. It is estimated that the maximum load of our company will be 950,000 kilowatts this year. It is expected that our company will enter the management mode of high voltage large power grid ahead of schedule, especially with the continuous growth of load, transformer overload and heavy load line operation appear in local weak links of power grid. Power transmission and distribution majors should do a good job in equipment maintenance, and relevant operation management departments should attach great importance to it.
In April, the company entered the peak period of construction, and the construction of Lvguantun, Ma Xinzhuang outgoing line project, smart grid project and smart home meter installation project were all concentrated in this month. All functional departments should actively organize and coordinate projects. In view of the household meter installation project, all business offices should carefully organize and arrange, strengthen on-site safety control, require relevant departments to do a good job in project organization and coordination, implement the system of leading cadres in place and the system of grass-roots unit leaders in place, increase the safety supervision on the construction site, and resolutely put an end to the safety production problems in small construction sites.
All units should do a good job in the construction and transformation of overhaul and technical transformation projects, and require the competent departments of development, biotechnology and dispatching to create a relatively relaxed working environment for grass-roots units. At present, municipal projects are in full swing, and birds build nests. Please strengthen the management of the transmission work area and various business units, give full play to the patrol function of the line patrol team, and ensure the safety and stability of the power grid.
?
Chapter III: Monthly Record Time of Safety in Production in June: 20xx65438+1October 4th Location: Meeting Room on the third floor of Yangdai Village Committee.
Moderator:
Participants: all village committees, deputy heads of villages, village cadres, village workers and university student village officials.
Main contents:
In the new year, our village should put safety in production first and stick to prevention.
1, quickly carry out safety publicity activities.
2. Quickly organize forces, conduct major investigations, and increase security.
3, the relevant person in charge carefully check the food and drug production and operation.
Village director: We should be highly responsible for people's lives and property, stop violations when they are found, and put the responsibilities in place.
Village Party Secretary: I hope everyone will seriously understand the spirit of the meeting, seriously carry out investigations, find problems in time and solve them. Go to the next level, no accidents, be highly responsible for people's lives and property, and promote safe production in the whole village.
? ;