Full of work and life, inadvertently passed. Looking back on the work during this period, there must be many difficulties and hardships, and it is necessary to write a work summary seriously. What are the characteristics of a good job summary? The following is my summary of the work of power dispatcher for you. Welcome to draw lessons from and refer to. I hope it helps you!
Power Dispatcher's Work Summary 1 Automation class is a maintenance team under the dispatching center, which is mainly responsible for comprehensive automation work. Including: substation automation equipment maintenance, regional dispatching and county-level automation system maintenance, distribution automation system maintenance, urban centralized control and county-level centralized control center debugging and maintenance. Looking back on the first half of 20xx, with the reform of power system, the former Southern Power Supply Bureau and the former Northern Power Supply Bureau jointly established Guiyang Power Supply Bureau. The change of organizational structure and the expansion of work scope make it necessary to have a brand-new concept in work content and work method to adapt to it. In the first half of the year, the task of the automation class is very heavy, except the daily production tasks, the revision of the team rules and regulations under the new organizational structure, and the understanding and familiarity with the automation part of the former North Bureau. In a short period of half a year, with the correct leadership, care and support of the bureau's leading group and the coordination and cooperation of relevant departments, our class has done all the work with full enthusiasm and positive working attitude, successfully completed the integration of the dispatching automation system of the original North-South Bureau, and made its own contribution to ensuring the safe and stable operation of the power system and the merger of the North-South Bureau.
First: production work:
During the period of 20xx65438+10-June, the automation class mainly carried out the following large-scale work:
1, 500 kV Guiyang Substation Automation System Monitoring Scheme Upgrade and Commissioning Operation, 220 kV East Jiangxi Second Circuit, 500 kV 50 13, 502 1, 503 1, 5032, 5043 Circuit Breakers and 500 kV Guifu Line, Fenggui
2. The dispatching automation systems of Luodian Electric Power Company, Changshun Electric Power Company, Longli Power Supply Bureau, Qingzhen Power Supply Bureau, Xiaohe Power Supply Bureau, Huaxi Power Supply Bureau and urban dispatching center meet the standards.
3. The automation system of Luodian Power Company's 35kV Mao Jing Substation was put into operation;
4. The telecontrol signals of 35kV Guang Shun Substation, 35kV Pendulum Substation, 35kV Power Generation Substation and 35kV Yao Substation of Changshun Electric Power Company are connected to the county dispatching automation system to work;
5, Huishui Power Supply Bureau 1 10kV Longgang Substation remote control equipment demolition and new monitoring system debugging; 1 10kV Huishui substation remote control equipment demolition work;
6. The telecontrol signal of the 35kV Maochang substation automation system of Longli Power Supply Bureau is connected to the county dispatching automation system to work;
7. The telecontrol signal of Qingzhen Power Supply Bureau 1 10kV Acropolis Substation Automation System is connected to the county dispatching automation system;
8. Commissioning, acceptance and trial operation of automation system of Qingzhen Power Supply Bureau 1 10kV Hanpoling Substation;
9. Integration of the dispatching automation system of the former North and South Bureau, including transferring the substation channel of the former SCADA system of the South Bureau to the North Bureau system, and establishing reports, charts and databases;
10, the dispatching automation system, remote viewing system and dehumidification system of the former Nanju city centralized control center were relocated;
1 1, partially completed the backup account of substation equipment and dispatching system.
12, 220KV Zhudong Substation, Zhan Jie Substation and 500KV Guiyang Substation's circuit breaker measurement and control devices shall be inspected regularly.
13, routine maintenance and defect handling of integrated automation equipment in substations under its jurisdiction;
14, automatic debugging and trial operation of new substation lines under its jurisdiction, and data modification and maintenance of relevant county dispatching terminals;
Our bank overcame the difficulties of heavy tasks and few personnel and successfully completed the above tasks. Moreover, in view of the situation that there are more integrated work and telecontrol signal work in newly connected substations, efforts are made to ensure quality and strive for zero-defect operation through the implementation of perfect standardization system and anti-accident measures; Improve the closed-loop operation system of defective teams to ensure zero-defect operation of operation equipment;
Second: work safely.
While carrying out the production work, the safety work of the automation class has not been relaxed, and the principle of paying equal attention to production and safety has always been adhered to, and both hands should be hard. Complete the daily safety work of the team on time and in quality, such as weekly safety meeting, work ticket statistics, safety summary, etc. , actively carry out spring, autumn and winter safety inspections and various special safety inspections, actively respond to the instructions of our bureau to carry out safety evaluation work in combination with daily safety evaluation, and actively carry out safety evaluation work, further consolidating the safety foundation of our class.
Looking back on the safety work of our class in the first half of 20xx, we have made some achievements, but there are also some problems:
1: In the past spring safety inspection and safety evaluation, our class actively participated in various safety activities in the bureau and workshop, but the written records of safety management were not standardized and comprehensive enough to truly reflect the activities of the safety team. Under the care and guidance of workshop leaders and safety officers, the safety activities and safety records of our class are gradually standardized, the previous safety management work is systematically rectified, and the safety management of the team is strengthened.
2. There is a lot of on-site work in the automation class, and it is found that the on-site safety awareness of the staff in our class is still not up to the standard. If the issuance and execution of the working ticket on site are not careful enough, the safety measures on site are not perfect, which will affect the safe operation of personnel and automation equipment. In view of the weekly safety study and the monthly safety team operation analysis meeting in our class, organize the whole class to discuss the safety situation and analyze the safety shortage and preventive measures in our class. Seriously urge the class members of our class to analyze and expose the causes and phenomena of the three major security enemies of "habitual violation of regulations, carelessness and irresponsibility". Especially in the case of comprehensive self-transformation and new construction of substations and rapid upgrading of automation technology, the status of automation equipment in power grid operation equipment is becoming more and more important. The operation of automation equipment is directly related to the safety of power grid operation. Always tighten the string of safety and resolutely implement the safety regulations for power production and the new standards of China Southern Power Grid.
3. In the safety evaluation work, our class formulated the corresponding evaluation content according to the actual situation of automation equipment, inspected the equipment under the jurisdiction of our class, implemented the principle of "focusing on truth and focusing on rectification", put forward rectification for the problems found, and put the responsibility for rectification on people. The hidden danger of comprehensive substation operation is solved, and the replacement of automation equipment, the timely update of operation and maintenance records and defect records are strengthened, which provides basic data support for safe operation analysis.
4. In the work of lightning protection and flood control, our class carefully checked the lightning protection and flood control of automation equipment, rectified the potential safety hazards of the equipment, formulated the duty watch and stipulated the implementation of the duty system.
5. Carry out on-site work safety hazards and various safety systems of China Southern Power Grid in the team, urge team members to memorize safety precautions in on-site work and hazards in secondary loop work, remind each other, and conduct spot checks at any time in actual work to ensure that each class member can master and apply them in on-site work.
6. The whole class passed all the safety examinations and the qualification examinations of the working ticket issuer or person in charge this year. At the same time, the team also organizes business examinations to improve the professional quality of members in the class. Safety work depends on technology for three points and management for seven points. Professional quality and safety awareness are the guarantee to improve safety quality.
Third: business training:
In the development and changes of automation specialty in recent years, we especially feel that one of the characteristics of automation work is professional jurisdiction, and the technology is changing rapidly. Automation work is becoming more and more important for the safe and stable operation of power grid, which requires people engaged in this work to study persistently and strive to improve their own level under the call of establishing learning enterprises. At the beginning of 20xx, our class made a detailed team training plan according to the specific conditions of the team members, worked out the training content of each month, and appointed a special person to urge everyone to study; The content of the training has also been carefully selected, taking into account the scene and background. Especially for the emergency fault handling and some program faults in the automation system, this paper puts forward the problem of how to deal with common faults in daily life, which is practical and targeted and avoids the formality of business training. Under the premise of busy work, try to create opportunities for class members to study in various related training courses and improve their professional level; There were 1 new colleagues in our class last year. When going out to work, we also try to arrange old comrades to lead new comrades, carry out training practice at work, and arrange new comrades to get started, which has met the requirements of progress in practice;
In the training work in the first half of 20xx, there are also some shortcomings:
At present, our class has a heavy task and a wide range of work contents, and the automation professional technology is updated quickly. Therefore, the research of new technology and new equipment is still a very important content, especially digital substation is the development direction of substation in the future. We must have a good understanding of the development and characteristics of digital substations, and we must not let the equipment wait for people. However, due to the long working hours in our class, it is often impossible to arrange the study of new technologies and new equipment in time, which should be reflected in the training work in the second half of the year;
Due to the uneven professional quality of the staff in our class, not all comrades can meet the requirements of the person in charge of the work, which restricts the improvement of the overall professional ability of our class. Therefore, while learning new technologies and equipment, we should give consideration to professional training for some comrades with poor foundation and strive to achieve the goal that everyone can be the person in charge of the work. In addition, the work scope of our class is roughly divided into two parts: substation automation system and dispatching automation system. Some class members are only familiar with substation automation or dispatching automation, and can't completely complete the two-part task. Therefore, in the future training work, we should make up for the shortcomings through practical operation and theoretical training, and strive to become technical experts of the two systems. The training work of the county bureau is under way. We train the automation staff of each sub-bureau in various ways, and some sub-bureaus arrange staff to work in our class to understand and master the skills and technologies of automation in specific work; Some sub-county bureaus arrange personnel to accompany them when they work in the corresponding county bureaus, and receive relevant knowledge training in their work. Through this series of training, the automation ability of county bureaus has been greatly improved, especially in the automation system of county dispatching, which can skillfully find defects and deal with simple defects. However, in these training processes, problems such as short time, unsystematic training methods and many tasks of students are exposed, and a large number of training courses are needed to carry out training. This work is being actively carried out to standardize and plan the automation training of the sub-bureau.
Fourth: basic management work:
Automation class is a relatively young team, with active thoughts and high enthusiasm for work, but there are also some problems such as dry officers and sloppy work. The goal of management is to use some systems and means to give full play to its advantages and reduce its shortcomings. The following work has been done in management:
1: Pay special attention to the rules in the work. For example, we emphasize the standardization of the acceptance work, formulate the acceptance form and standardize the acceptance work; Vacancy work also places special emphasis on the implementation of working tickets.
2. Give full play to the role of mutual supervision and reminder of team members, conduct on-site pickets against regulations every month, and standardize everyone's work through the established reward and punishment system and related work system.
3. In addition to following the workshop assessment method, the assessment method formulated by our class is mainly based on education criticism and supplemented by assessment. The assessment amount is not large, but the assessment items are relatively detailed. Even if this reminds everyone, it will not affect everyone's work mood.
4. Strengthen the team infrastructure construction. Under the premise of busy work, the team played the role of five people, each performing his or her duties, refining their respective tasks, including the formulation of various statements, written reports and materials, and standardizing their storage, so that the team infrastructure was incorporated into daily work, preventing the dilemma of team building and lack of supporting materials at the end of the year.
Training work should be strengthened, fully understand the spirit of the bureau on establishing a learning organization, and establish a learning team in the team to do some work. Through the reward system or knowledge contest, cultivate the studious spirit of the team members, actively understand and learn new equipment and knowledge, and summarize the learning results. Encourage everyone to think more, innovate more, and publish more technical papers and academic achievements.
The operation mode of regular inspection and defect treatment should be further rationalized, and the standardization work should be revised according to the equipment update and technical development to increase the enforceability and rationality.
The basic management of the team still needs the cooperation of Qi Xin of the whole class. At the same time, we should help each other learn, with complete information and convenient inquiry. Make management routine, more systematic and standardized.
Summary of electric power dispatcher's work Chapter II Four Seasons Cycle. Unconsciously, I have spent the ordinary and substantial first year of this new job. 20xx at the end of February, from Changhua operation station to dispatching room, engaged in dispatching monitoring. This is the trust and cultivation of leaders. I also cherish this opportunity. I am diligent and willing to work hard in my new position and give full play to my intelligence. The following is my summary of the past year:
First, based on this position, do a good job.
From the day I reported to the dispatching room, I actively engaged in my new job, actively learned business technology from the master, and learned a lot of dispatching business technology books and related rules and regulations. Zhang, the class monitor, is a capable, enthusiastic and meticulous female monitor. She attaches great importance to the business training of new dispatchers. In order to assess the dispatching vice-value business three months later and develop the business technology in the future, I made detailed rules and officially served as the dispatching vice-value.
While studying with the class, I tried to complete the intranet of the dispatching room assigned by the leader and finish the work assigned by the superior in time. Actively cooperate with the monitor to complete the management of the team, draft the system of monitoring post responsibility system, monitoring shift system and monitoring duty, and complete some data sorting work. When I entered the dispatching room, it was at the last stage of the bureau's activities to create a first-class power supply enterprise. I take the initiative to participate in and complete the work assigned by the class, whether in class or outside class. Especially in the modification and establishment of "scheduling management" module and "monitoring" module of local MIS system, I have done a lot of work: modeling, debugging and improvement, etc. Sort out and standardize the data of shift ledger, and make a unified ledger label. In my daily work, I complete the corresponding data registration and sorting in time according to the equipment changes.
Shortly after entering the dispatching station, in order to strengthen the power grid dispatching management, strengthen the monitoring of unattended substation equipment, straighten out the relationship and ensure the safe and economic operation of the power grid, the dispatching station set up a monitoring station. According to the work arrangement, I was assigned to work in the monitoring station. Before the establishment of the monitoring station, the completion of the voltage and power factor assessment indicators of the two municipal bureaus was very unsatisfactory. From March of 20xx, the qualified rate and power factor of Class A voltage in our bureau showed a good trend of rising month by month, and the qualified rate of voltage reached 99.26% in May, which was the best record in history. It includes the hard work of all the personnel in the dispatching class. In order to explore the voltage variation law of 10kV, I got up in the middle of the night for many times to monitor the voltage variation, and accumulated good experience for voltage regulation. My work has also been praised by director Xu.
Second, strengthen business learning to meet the needs of the post
"Science and technology are the primary productive forces". As a front-line electric worker, he knows the importance of business technology. Only with solid and excellent business technology can we gain a foothold in enterprises and departments. With the continuous development and progress of social production, people need to master newer and better technologies to meet the needs of social production development. Contemporary society has entered the information age of rapid development, and new technologies are constantly emerging, and the power industry is no exception. If I am currently engaged in the work, it can be said that most of it is done on the computer. Voltage and reactive power regulation and load control, as one of the important tasks of monitoring, are completed on the dispatching automation system. In addition, the daily duty work is carried out in MIS. Mastering advanced production and management tools is an essential quality to meet the needs of modern enterprises. As an ordinary worker, I insist on studying hard in my own post, assiduously studying professional technology and striving to improve my business skills; Actively learn advanced scientific and cultural knowledge and keep learning and making progress to meet the needs of the growing power industry.
With the development of Lin 'an economy and the continuous improvement of social electricity consumption, the wiring of Lin 'an power grid is becoming increasingly complex and huge. As a dispatcher, you must always concentrate on understanding and mastering the latest situation of the power grid, analyzing the operation of the power grid, analyzing the system load, power flow, voltage and reactive power, and analyzing its possible problems and hidden dangers. Only by mastering the operation of the power grid can we find possible problems and hidden dangers, make plans as soon as possible and plan ahead. Only in this way can we deal with accidents and failures quickly, safely and efficiently in an emergency, reduce the outage time of customers, and truly implement the requirements of "starting from customer needs, finally satisfying customers" and "customer first" put forward by Director Li at the professional ethics construction and quality service meeting! Without a solid business foundation, everything is empty talk, and "customer first" has become a castle in the air. Always ask yourself to maintain a high sense of responsibility, treat daily power outage maintenance and accident treatment, and arrange the operation mode reasonably.
In order to further improve the dispatcher's professional quality, in June165438+1October this year, the leader of the dispatching room arranged for me to go to Hangzhou Electric Power School for 17 days of dispatching business training. I also cherish this opportunity. After more than half a month's training, I am deeply touched. I deeply feel the timeliness and important role of this training. This training covers the whole process of power production and sales of power enterprises, including boiler, steam turbine, power, transmission lines in power supply, relay protection and DTS simulator training. He also systematically studied the power laws and regulations such as the Electricity Law and the Regulations on Power Supply and Use. Through this training, I not only greatly improved my professional level, but also learned about the future development trend of world power from school teachers. Frontier science of power technology development; Recognize the extraordinary influence of information technology on the development of electronic technology.
This training also made me feel a deep sense of crisis, and the sense of urgency for further in-depth study of scientific and cultural knowledge constantly collided with myself. With the rapid development of electric power technology and information technology, the development of enterprises and the quality of posts require practitioners to have very strong self-conscious learning requirements, and they must keep learning and making progress in order not to be eliminated by posts. The days of reading old almanac books and eating old money are long gone. He who does not advance loses ground. Seize the day and study hard is the fundamental way to survive in the fierce competition. I also intend to carry out systematic job skills learning to meet the needs of enterprise development.
Third, grasp the development trend of information technology, keep pace with the development of the times, and master some emerging practical technologies, so as to better serve enterprises and society; It also makes the realization of its own value closely integrated with the development goals of the enterprise. In my spare time, I extensively read newspapers and magazines such as Modern Enterprise Management and Semimonthly Talk to broaden my knowledge and improve my comprehensive quality.
;