This book can be used as a teaching material for continuing education and training of electric workers, and also as a reference for steam turbine operation management personnel. order
Chapter I Professional Basic Knowledge
The first section of the basic concept and working principle of steam turbine
First, the basic concept of steam turbine
Second, the working principle of steam turbine stage
In the second quarter, the turbine body system
I. Cylinder
2. Baffle, baffle sleeve, stationary blade ring and stationary blade retaining ring
Third, glands
Fourth, tolerance
Verb (abbreviation for verb) leaf
Six, the rotor
In the third quarter steam turbine auxiliary system
I. Condensing equipment and system
Second, the pumping equipment
Second, the feed water regenerative equipment and deaerator
The fourth quarter steam turbine regulation and protection system
A, the task and composition of steam turbine regulation
Second, the static characteristics of the regulating system
Third, the protection system of steam turbine
Section 5 Developing Countries and DEH
I. Developing countries
First of all, DEH
Section 6 Pumps and valves
First, the basic knowledge of the pump
Second, the performance of centrifugal pump
Three. Brief introduction of valve
Chapter II Operation and Test of Steam Turbine
The first section turbine start-stop operation
I. Overview
Second, the operation of the steam turbine startup process
Third, the operation process of turbine shutdown
Normal operation and adjustment of steam turbine in the second quarter
I. Monitoring during normal operation
Second, the adjustment of main parameters in unit operation
In the third quarter steam turbine auxiliary system operation
I. Condensing system
Second, the vacuum pumping system
Third, the water supply regeneration system
Fourth, deaerator.
Verb (abbreviation of verb) cooling water system
The fourth quarter steam turbine test
First, unit testing should follow the following principles.
Second, the static test of regulating system
Third, turbine ETS trip protection test
Four. Action test of main trip solenoid valve of steam turbine
Verb (abbreviation for verb) PLU/ error loop test
Six, emergency protector oil injection test
Seven, valve activity test
Eight, valve leak test
Nine, overspeed test
X. standby overspeed trip test
Eleven, vacuum system leak test
Twelve, extraction check valve activity test
Thirteen, turbine lubricating oil pressure chain protection test
Fourteen Connection and interlock test of fire-resistant oil system
Chapter III Fault, Abnormality and Treatment of Steam Turbine System
The first section steam turbine faults, anomalies and treatment
A, turbine overspeed accident
Second, the steam turbine water, cold steam accident
3. Abnormal steam parameters
Four, the big shaft bending accident
Five, steam turbine vacuum drop
Six, turbine blade damage
Seven, bearing damage
Eight, runner wear accident
Several, oil system accidents
X. Causes and treatment measures of turbine oil emulsification
XI。 Deterioration of fuel resistance and its prevention
In the second quarter, faults, anomalies and treatment of steam turbine auxiliary equipment and systems.
A, water regeneration extraction and drainage system failure
Second, the main equipment failure of regenerative extraction heating system
Third, the feed water pump failure
Four, condenser corrosion leakage
Five, the condensate system failure
Six, ordinary centrifugal pump, motor vibration
Abnormal vibration of steam turbine generator set in the third quarter
I. Overview of vibration
Second, the vibration accident case analysis
Chapter IV Application of New Technologies and Expansion of Knowledge
Section 1 Comparison of Equipment Characteristics and Performance of Several Typical 600MW Steam Turbines
1. Comparison of unprepared performance of steam turbines
Second, the operation characteristics of steam turbine generator set
Three. Comparison of main characteristic parameters of steam turbine equipment
Fourth, summary.
Section 2 Calculation and Optimization System of Turbine Unit Operation Performance
Technical transformation of steam turbine unit in the third quarter
First, the technical form of steam turbine transformation
Second, some technical measures for unit transformation
Section 4: Example analysis of new technical transformation of steam turbine flow passage.
First, the problems of 300Mw steam turbine
Second, the transformation measures
Appendix Common Terms of Steam Turbine
A, steam turbine
Second, the steam turbine thermal system and bypass system
III. Condensing equipment and cooling system
Fourth, water heating equipment
Five, water supply oxygen removal equipment
Since the reform and opening up, China's economy has entered the track of high-speed, stable and healthy development. As an important pillar and symbol of modern economic development and social progress, the electric power industry has developed vigorously since the 1950s. By the end of 2007, the installed power generation capacity of China has reached 710.3 million kilowatts, ranking second in the world. Strong power supply has become a reliable guarantee and an important foundation for China's rapid economic development, rapid improvement of people's living standards and enhancement of comprehensive national strength.
With the development of China's power industry, power technology has also made great progress. New energy and various clean coal power generation technologies have been accelerated, and various new technologies, new materials and new processes have been widely used. 2 1 century, China electric power industry is appearing in front of the world with a brand-new look.
In order to strengthen the traffic safety management of this unit, enhance the traffic safety awareness of teachers and students, reduce traffic violations,