Current location - Training Enrollment Network - Education and training - I want to run a training school. What are the specific requirements for fire fighting?
I want to run a training school. What are the specific requirements for fire fighting?
Specific requirements for fire prevention:

First of all, go to the industrial and commercial bureau for the record of the school name, get the notice of the school domain name given by the industrial and commercial bureau, and go to the fire window of the local administrative hall to shake the number for the record.

If the fire record is successful, it is necessary to submit the school's geographical location plan and architectural design to the fire department. If you rent a house, you must have a house lease contract.

There are at least two exits in the school stairs, and the fire control facilities should be complete. After going to the registration hall, the fire window staff will give the template and all the materials for filling out the form.

The fire control institutions of public security organs shall, in accordance with the evaluation criteria for fire control acceptance of construction projects, organize fire control acceptance of construction projects that have passed the fire control design audit. The fire control institutions of public security organs shall issue fire control acceptance opinions for the construction projects that are qualified through comprehensive evaluation; If the comprehensive evaluation conclusion is unqualified, it shall issue unqualified opinions on fire control acceptance and explain the reasons.

Extended data:

Fire-fighting requirements: the design and selection of fire-fighting products and building components, building materials and decorative materials with fire-fighting performance requirements shall be marked with specifications, performance and other technical indicators, and their quality requirements must meet national standards or industry standards; Go to the industrial and commercial bureau for the record of the school name, get the notice of the school domain name given by the industrial and commercial bureau, and go to the fire window of the local administrative office for the record.

Participate in the completion acceptance of the construction project organized by the construction unit, and sign and confirm the implementation of the fire protection design of the construction project.

Materials that need to be provided according to law.

1, fire spacing, fire lane, fire water source, etc. The contents related to fire safety in the general layout and layout;

2, the fire risk category and fire resistance rating of the building;

3, building fire and smoke partition and building structure;

4. Safe evacuation and fire elevator;

5, fire water supply and automatic fire extinguishing system;

6, smoke prevention, smoke exhaust and ventilation, air conditioning system;

7, fire power supply and its distribution;

References:

Baidu encyclopedia-fire inspection and acceptance

References:

Baidu Encyclopedia-Provisions on Supervision and Administration of Fire Protection in Construction Projects

References:

Baidu encyclopedia-sishu